Engineering PapersโŒ• Search

NASA NTRS ยท 20010045823

Mapping the Red Planet

Abstract

Since September 1997 the Mars Global Surveyor spacecraft has been orbiting the planet Mars and acquiring new data about the red planet that is changing our view of its present state and past history. Except for a few weeks in October 1997 and a few months in the Spring/Summer of 1998 when special science operations were conducted the spacecraft spent the first 18 months if its time at Mars getting to the right orbital geometry for the mapping mission. But on March 1, 1999 the MGS spacecraft trained its instruments onto the planet to begin a full Mars year (684 Earth days) of continuous systematic mapping and observation of the planet. The camera began wide angle and high resolution mapping, the thermal emission spectrometer began sensing the atmosphere and the material properties of the surface, the magnetometer searched out regions of abnormally high magnetism, the altimeter began determining the precise shape of the planet, and the radio science experiment began determining atmospheric pressures, temperatures and mapping the planet's gravity field. In a matter of a month more data was acquired about

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Smith, David E.. 2001-01-01. Mapping the Red Planet. https://ntrs.nasa.gov/citations/20010045823

Cite the original work for its findings. Save a collection to share your selection of sources.