Engineering PapersSearch

NASA NTRS · 19940004532

Lunar base and Mars base design projects

Abstract

The space design classes at the University of Texas at Austin undertook seven projects in support of the NASA/USRA advanced space design program during the 1988-89 year. A total of 51 students, including 5 graduate students, participated in the design efforts. Four projects were done within the Aerospace Engineering (ASE) design program and three within the Mechanical Engineering (ME) program. Both lunar base and Mars base design efforts were studied, and the specific projects were as follows: Lunar Crew Emergency Rescue Vehicle (ASE); Mars Logistics Lander Convertible to a Rocket Hopper (ME); A Robotically Constructed Production and Supply Base on Phobos (ASE); A Mars/Phobos Transportation System (ASE); Manned Base Design and Related Construction Issues for Mars/Phobos Mission (ME); and Health Care Needs for a Lunar Colony and Design of Permanent Medical Facility (ME).

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Amos, J., Campbell, J., Hudson, C., Kenny, E., Markward, D., Pham, C., Wolf, C.. 1989-01-01. Lunar base and Mars base design projects. https://ntrs.nasa.gov/citations/19940004532

Cite the original work for its findings. Save a collection to share your selection of sources.