NASA NTRS ยท 19920060737
Lunar transportation systems options
Abstract
Lunar transportation system (LTS) options to meet defined lunar mission requirements are described. The discussed configuration and scenarios include: ground-based direct launch, ground-based earth orbit rendezvous/dock, and space-based on-orbit assembly. The earth-to-orbit vehicle sizing, operational complexities, and technology phasing of each option are addressed.
Keep this discovery
Explore connections, maps & timelines
Brown, Norman S.. 1992-01-01. Lunar transportation systems options. https://ntrs.nasa.gov/citations/19920060737
Cite the original work for its findings. Save a collection to share your selection of sources.