Development and refinement of test bed simulations

Abstract

Lewis Research Center of NASA, with support from Rocketdyne, was engaged in non-real time computer simulation effort for the Space Station Freedom Electric Power System (EPS) EASY5, a simulation package, is used as the primary tool for this activity. Early in the design of the EPS, two test beds were set up at Lewis. The Integrated Test Bed (ITB), that combines and upgrades these test beds, is in the planning stage. The test beds are designed to functionally represent many of the components of the EPS and their interconnections. The simulation effort is primarily directed towards these test beds. Model verification is performed using test bed data.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Dravid, Narayan V., Miller, Dean R., Patterson, Alex G., Gombos, Frank J.. 1989-08-01. Development and refinement of test bed simulations. https://ntrs.nasa.gov/citations/19890018331

Cite the original work for its findings. Save a collection to share your selection of sources.