Engineering PapersSearch

NASA NTRS · 19870001658

Satellite battery testing status

Abstract

Because of the large numbers of satellite cells currently being tested and anticipated at the Naval Weapons Support Center (NAVWPNSUPPCEN) Crane, Indiana, satellite cell testing is being integrated into the Battery Test Automation Project (BTAP). The BTAP, designed to meet the growing needs for battery testing at the NAVWPNSUPPCEN Crane, will consist of several Automated Test Stations (ATSs) which monitor batteries under test. Each ATS will interface with an Automation Network Controller (ANC) which will collect test data for reduction.

Keep this discovery

BibTeXRIS

Haag, R., Hall, S.. 1986-09-01. Satellite battery testing status. https://ntrs.nasa.gov/citations/19870001658

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

International Space Station Lithium-Ion Battery Status

When originally launched, the International Space Station (ISS) primary Electric Power System (EPS) used Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The electricity for the space station is generated by its solar arrays, which charge batteries during insolation for subsequent discharge during eclipse. The Ni-H2 batteries were designed to operate for ten years at a 35 percent depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. For service beyond that period, upgraded Li-Ion Orbital Replacement Units (ORUs) were designed. These are the largest Li-Ion batteries ever utilized for a human rated spacecraft. With the oldest 12 Ni-H2 battery ORUs cycling since September 2006, the first set of six was replaced by Li-Ion batteries in December 2016; the second set of six is planned for replacement in September 2018. This paper will include an overview of the ISS Li-Ion battery system architecture, on-orbit status of the first 6 batteries, start up of the second 6 batteries, and the status of the Li-Ion cell and ORU life cycle testing.

International Space Station

International Space Station Lithium-Ion Battery Status

When originally launched, the International Space Station (ISS) primary Electric Power System (EPS) used Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The electricity for the space station is generated by its solar arrays, which charge batteries during insolation for subsequent discharge during eclipse. The Ni-H2 batteries were designed to operate for ten years at a 35% depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. For service beyond that period, upgraded Li-Ion Orbital Replacement Units (ORUs) were designed. These are the largest Li-Ion batteries ever utilized for a human rated spacecraft. The first set of six Ni-H2 batteries was replaced by Li-Ion batteries in December 2016; the second set of six was launched in September 2018 and installed in March 2019. The third set of six were launched in September 2019. Three batteries were installed in September 2019, with the remaining three to be installed in January 2020. This paper will include a brief overview of the ISS Li-Ion battery system architecture, start up of the second and third set of 6 batteries and the on-orbit status of all 18 batteries, plus the status of the Li-Ion cell life testing.

Lithium-Ion

A Battery Certification Testbed for Small Satellite Missions

A battery pack consisting of standard cylindrical 18650 lithium-ion cells has been chosen for small satellite missions based on previous flight heritage and compliance with NASA battery safety requirements. However, for batteries that transit through the International Space Station (ISS), additional certification tests are required for individual cells as well as the battery packs. In this manuscript, we discuss the development of generalized testbeds for testing and certifying different types of batteries critical to small satellite missions. Test procedures developed and executed for this certification effort include: a detailed physical inspection before and after experiments; electrical cycling characterization at the cell and pack levels; battery-pack overcharge, over-discharge, external short testing; battery-pack vacuum leak and vibration testing. The overall goals of these certification procedures are to conform to requirements set forth by the agency and identify unique safety hazards. The testbeds, procedures, and experimental results are discussed for batteries chosen for small satellite missions to be launched from the ISS.

Certification