Engineering PapersโŒ• Search

NASA NTRS ยท 19850057117

Space Shuttle mission extension capability

Abstract

Space Shuttle missions are currently limited to 11 days, primarily due to depletion of the power reactants (hydrogen and oxygen). A power system Mission Extension Kit (MEK) is described which could provide the capability to stay on orbit 10 additional days. These extra days would benefit Space Station construction and missions such as materials processing, earth and celestial observation, and life science studies (Spacelab). Other constraints to longer missions which may dictate minor Orbiter modifications will be discussed. The power system MEK is particularly desirable because of its existing flight qualified hardware which can be delivered within 3 to 4 years.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Fraser, W. M., Jr.. 1984-01-01. Space Shuttle mission extension capability. https://ntrs.nasa.gov/citations/19850057117

Cite the original work for its findings. Save a collection to share your selection of sources.