Abstract

A three stage process of ground testing of the Space Telescope Pointing Control System is used for verification prior to on-orbit operation. First, development tests are conducted in a laboratory environment using flight/engineering model control sensor and actuators configured with an engineering model of the flight computer and data management system breadboards. These development tests validate the results of computer simulations predicting control system performance. Integration tests bring together flight system elements and software interfaced to a software simulation of vehicle dynamics to confirm closed loop performance. The final ground test phase, flight systems testing, is conducted on the fully assembled Space Telescope, verifies interfaces with the Fine Guidance Sensors and includes a thermal vacuum testing period. During the final test phase, the Point Control System is exercised with the dynamics simulator running in real time.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Whittler, W. H., Collart, R. E.. 1984-01-01. Control system testing. https://ntrs.nasa.gov/citations/19840047775

Cite the original work for its findings. Save a collection to share your selection of sources.