Engineering PapersโŒ• Search

NASA NTRS ยท 19800016287

TBC costing

Abstract

Procedures to be used in determining the cost of producing and installing a parabolic dish collector in annual production volumes of 10,000, 50,000, 100,000, and 1,000,000 units include (1) evaluating each individual part for material cost and for the type and number of operations required to work the raw material into the finished part; (2) costing labor, burden, tooling, gaging, machinery, and equipment; (3) estimating facilities requirements for each production volume; and (4) considering suggestions for design and material alterations that could result in cost reduction.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kaminski, H. L.. 1980-05-15. TBC costing. https://ntrs.nasa.gov/citations/19800016287

Cite the original work for its findings. Save a collection to share your selection of sources.