NASA NTRS · 19790001946
TDRSS system configuration study for space shuttle program
Abstract
This study was set up to assure that operation of the shuttle orbiter communications systems met the program requirements when subjected to electrical conditions similar to those which will be encountered during the operational mission. The test program intended to implement an integrated test bed, consisting of applicable orbiter, EVA, payload simulator, STDN, and AF/SCF, as well as the TDRSS equipment. The stated intention of Task 501 Program was to configure the test bed with prototype hardware for a system development test and production hardware for a system verification test. In case of TDRSS when the hardware was not available, simulators whose functional performance was certified to meet appropriate end item specification were used.
Keep this discovery
Explore connections, maps & timelines
1978-06-01. TDRSS system configuration study for space shuttle program. https://engineeringpapers.com/record/nasa%3A19790001946/tdrss-system-configuration-study-for-space-shuttle-program
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Engineering Papers by Indiciae: BibTeX · RIS.