MIUS integration and subsystems test program

Abstract

The MIUS Integration and Subsystems Test (MIST) facility at the Lyndon B. Johnson Space Center was completed and ready in May 1974 for conducting specific tests in direct support of the Modular Integrated Utility System (MIUS). A series of subsystems and integrated tests was conducted since that time, culminating in a series of 24-hour dynamic tests to further demonstrate the capabilities of the MIUS Program concepts to meet typical utility load profiles for a residential area. Results of the MIST Program are presented which achieved demonstrated plant thermal efficiencies ranging from 57 to 65 percent.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Beckham, W. S., Jr., Shows, G. C., Redding, T. E., Wadle, R. C., Keough, M. B., Poradek, J. C.. 1976-12-01. MIUS integration and subsystems test program. https://ntrs.nasa.gov/citations/19770019083

Cite the original work for its findings. Save a collection to share your selection of sources.