Engineering Papers⌕ Search

Engineering topics

Zhou, Ning

Publications and source records attributed to Zhou, Ning.

At least 73 records · Page 4

An Advanced Framework for Improving Situational Awareness in Electric Power Grid Operation

With the deployment of new smart grid technologies and the penetration of renewable energy in power systems, significant uncertainty and variability is being introduced into power grid operation. Traditionally, the Energy Management System (EMS) operates the power grid in a deterministic mode, and thus will not be sufficient for the future control center in a stochastic environment with faster dynamics. One of the main challenges is to improve situational awareness. This paper reviews the current status of power grid operation and presents a vision of improving wide-area situational awareness for a future control center. An advanced framework, consisting of parallel state estimation, state prediction, parallel contingency selection, parallel contingency analysis, and advanced visual analytics, is proposed to provide capabilities needed for better decision support by utilizing high performance computing (HPC) techniques and advanced visual analytic techniques. Research results are presented to support the proposed vision and framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Model Reduction, Validation, and Calibration of Wind Power Plants for Dynamic Studies

Accurate representation of wind power plants (WPP) in both offline and online power system stability studies has gained importance because of the rapid increase in installation of wind generation around the world. On the other hand, reduced WPP representation is preferred due to computational efficiency. To improve the accuracy, other authors have proposed changes in structure of the reduced model for large WPPs. The use of model validation and calibration is an alternative to improve the accuracy of the reduced WPP model. In this paper, we compare accuracy improvements brought by changes in model structure with accuracy improvements brought by validation and calibration of the reduced WPP model with minimal changes in structure. We illustrate our findings using a 168-machine WPP connected to the IEEE-39-bus test system. The parameters of the reduced WPP model are either calculated with current equivalencing techniques or validated and calibrated against a more accurate model. The changes in structure of the reduced model are 1-machine or 2-machine reduced models connected with a 1-line or 2-line collector equivalents. We show that the most accurate response is obtained by calibrating the parameters of the reduced model with minimum changes in structure.

17 WIND ENERGY↗

Calibration of Reduced Dynamic Models of Power Systems using Phasor Measurement Unit (PMU) Data

Accuracy of a power system dynamic model is essential to the secure and efficient operation of the system. Lower confidence on model accuracy usually leads to conservative operation and lowers asset usage. To improve model accuracy, identification algorithms have been developed to calibrate parameters of individual components using measurement data from staged tests. To facilitate online dynamic studies for large power system interconnections, this paper proposes a model reduction and calibration approach using phasor measurement unit (PMU) data. First, a model reduction method is used to reduce the number of dynamic components. Then, a calibration algorithm is developed to estimate parameters of the reduced model. This approach will help to maintain an accurate dynamic model suitable for online dynamic studies. The performance of the proposed method is verified through simulation studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deriving Optimal Operational Rules for Mitigating Inter-area Oscillations

This paper introduces a new method to mitigate inter-area oscillations of a large scale interconnected power system by means of generation re-dispatch. The optimal operational control procedures are derived as the shortest distance from the current operating condition to a desired damping ratio of the oscillation mode by adjusting generator outputs. A sensitivity based method is used to select the most effective generators for generation re-dispatch and decision tree is trained to approximate the security boundary in a space characterized by the selected generators. The optimal operational rules can be found by solving an optimization problem where the boundary constraints are provided by the decision tree rules. This method is tested on a Western Electricity Coordinating Council (WECC) 179-bus simplified network model and simulation results have demonstrated the proof of concept and shown promising application in real time operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Initial Study on the Predictability of Real Power on the Grid based on PMU Data

Operations on the electric power grid provide highly reliable power to the end users. These operations involve hundreds of human operators and automated control schemes. However, the operations process can often take several minutes to complete. During these several minutes, the operations are often evaluated on a past state of the power system. Proper prediction methods could change this to make the operations evaluate the state of the power grid minutes in advance. Such information allows proactive, rather than reactive, actions on the power system and aids in improving the efficiency and reliability of the power grid as a whole. A successful demonstration of this prediction framework is necessary to evaluate the feasibility of utilizing such predicted states in grid operations.

phasor measurement unit↗

Uncertainty Quantification in State Estimation using the Probabilistic Collocation Method

In this study, a new efficient uncertainty quantification technique, probabilistic collocation method (PCM) on sparse grid points is employed to enable the evaluation of uncertainty in state estimation. The PCM allows us to use just a small number of ensembles to quantify the uncertainty in estimating the state variables of power systems. By sparse grid points, the PCM approach can handle large number of uncertain parameters in power systems with relatively lower computational cost, when comparing with classic Monte Carlo (MC) simulations. The algorithm and procedure is outlined and we demonstrate the capability and illustrate the application of PCM on sparse grid points approach on uncertainty quantification in state estimation of the IEEE 14 bus model as an example. MC simulations have also been conducted to verify accuracy of the PCM approach. By comparing the results obtained from MC simulations with PCM results for mean and standard deviation of uncertain parameters, it is evident that the PCM approach is computationally more efficient than MC simulations.

Lin, Guang↗

Modal Analysis for Grid Operation

MANGO software is to provide a solution for improving small signal stability of power systems through adjusting operator-controllable variables using PMU measurement. System oscillation problems are one of the major threats to the grid stability and reliability in California and the Western Interconnection. These problems result in power fluctuations, lower grid operation efficiency, and may even lead to large-scale grid breakup and outages. This MANGO software aims to solve this problem by automatically generating recommended operation procedures termed Modal Analysis for Grid Operation (MANGO) to improve damping of inter-area oscillation modes. The MANGO procedure includes three steps: recognizing small signal stability problems, implementing operating point adjustment using modal sensitivity, and evaluating the effectiveness of the adjustment. The MANGO software package is designed to help implement the MANGO procedure.

Zhou, Ning↗

Use of Modal Sensitivity to Operating Conditions for Damping Control in Power Systems

Small signal stability is an inherent characteristic of dynamic systems such as power systems. Pole positioning through power system stabilizers (PSS) is often used for improving damping in power systems. A well-designed PSS can be very effective in damping oscillations, especially local oscillations. However, designing PSSs for inter-area oscillations has been a very challenging task due to time-varying operating conditions affecting the characteristics of inter-area oscillations. This paper explores the sensitivity relationship between oscillations and operating conditions and employs the relationship to derive recommendations for operator’s actions to adjust operating conditions so as to improve damping. Low damping is usually considered to be a result of heavy power transfer in long distance. Studies in this paper show that this generally holds true while locations have significant impact on damping of oscillations. Therefore it is important to consider locations in deriving recommendations. This paper proposes the concept of relative modal sensitivity and presents the application of relative modal sensitivity to derive recommendations for operator’s action in damping control.

Huang, Zhenyu↗

Building Decision Trees for Characteristic Ellipsoid Method to Monitor Power System Transient Behaviors

The characteristic ellipsoid is a new method to monitor the dynamics of power systems. Decision trees (DTs) play an important role in applying the characteristic ellipsoid method to system operation and analysis. This paper presents the idea and initial results of building DTs for detecting transient dynamic events using the characteristic ellipsoid method. The objective is to determine fault types, fault locations and clearance time in the system using decision trees based on ellipsoids of system transient responses. The New England 10-machine 39-bus system is used for running dynamic simulations to generate a sufficiently large number of transient events in different system configurations. Comprehensive transient simulations considering three fault types, two fault clearance times and different fault locations were conducted in the study. Bus voltage magnitudes and monitored reactive and active power flows are recorded as the phasor measurements to calculate characteristic ellipsoids whose volume, eccentricity, center and projection of the longest axis are used as indices to build decision trees. The DT performances are tested and compared by considering different sets of PMU locations. The proposed method demonstrates that the characteristic ellipsoid method is a very efficient and promising tool to monitor power system dynamic behaviors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analyzing of Balancing Authorities Cooperation Methods with High Variable Generation Penetration

With the rapidly growing penetration level of wind and solar generation, the challenges of managing variability and the uncertainty of intermittent renewable generation become more and more significant. The problem of power variability and uncertainty gets exacerbated when each balancing authority (BA) works locally and separately to balance its own subsystem. The virtual BA concept is based on various forms of collaboration between individual BAs to manage power variability and uncertainty. The virtual BA will have a wide area control capability in managing its operational balancing requirements in different time frames. This coordination results in the improvement of efficiency and reliability of power system operation while facilitating the high level integration of green, intermittent energy resources. Several strategies for virtual BA implementation, such as Area Control Error (ACE) diversity interchange (ADI), variable generation only BA, BA consolidation, dynamic scheduling, and regulation and load following sharing are discussed in this paper. The objective of such strategies is to allow individual BAs within a large power grid to help each other dealing with power variability. Innovative methods have been developed to simulate the balancing operation of BAs. These methods evaluate the BA operation through a number of metrics such as capacity, ramp rate, ramp duration, energy and cycling requirements to evaluate the performance of different virtual BA strategies.

17 WIND ENERGY↗

MANGO – Modal Analysis for Grid Operation: A Method for Damping Improvement through Operating Point Adjustment

Small signal stability problems are one of the major threats to grid stability and reliability in the U.S. power grid. An undamped mode can cause large-amplitude oscillations and may result in system breakups and large-scale blackouts. There have been several incidents of system-wide oscillations. Of those incidents, the most notable is the August 10, 1996 western system breakup, a result of undamped system-wide oscillations. Significant efforts have been devoted to monitoring system oscillatory behaviors from measurements in the past 20 years. The deployment of phasor measurement units (PMU) provides high-precision, time-synchronized data needed for detecting oscillation modes. Measurement-based modal analysis, also known as ModeMeter, uses real-time phasor measurements to identify system oscillation modes and their damping. Low damping indicates potential system stability issues. Modal analysis has been demonstrated with phasor measurements to have the capability of estimating system modes from both oscillation signals and ambient data. With more and more phasor measurements available and ModeMeter techniques maturing, there is yet a need for methods to bring modal analysis from monitoring to actions. The methods should be able to associate low damping with grid operating conditions, so operators or automated operation schemes can respond when low damping is observed. The work presented in this report aims to develop such a method and establish a Modal Analysis for Grid Operation (MANGO) procedure to aid grid operation decision making to increase inter-area modal damping. The procedure can provide operation suggestions (such as increasing generation or decreasing load) for mitigating inter-area oscillations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Improving Small Signal Stability through Operating Point Adjustment

ModeMeter techniques for real-time small signal stability monitoring continue to mature, and more and more phasor measurements are available in power systems. It has come to the stage to bring modal information into real-time power system operation. This paper proposes to establish a procedure for Modal Analysis for Grid Operations (MANGO). Complementary to PSS’s and other traditional modulation-based control, MANGO aims to provide suggestions such as increasing generation or decreasing load for operators to mitigate low-frequency oscillations. Different from modulation-based control, the MANGO procedure proactively maintains adequate damping for all time, instead of reacting to disturbances when they occur. Effect of operating points on small signal stability is presented in this paper. Implementation with existing operating procedures is discussed. Several approaches for modal sensitivity estimation are investigated to associate modal damping and operating parameters. The effectiveness of the MANGO procedure is confirmed through simulation studies of several test systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automatic Implementation of Prony Analysis for Electromechanical Mode Identification from Phasor Measurements

Small signal stability problems are one of the major threats to grid stability and reliability. Prony analysis has been successfully applied on ringdown data to monitor electromechanical modes of a power system using phasor measurement unit (PMU) data. To facilitate an on-line application of mode estimation, this paper developed a recursive algorithm for implementing Prony analysis and proposed an oscillation detection method to detect ringdown data in real time. By automatically detect ringdown data, the proposed method helps guarantee that Prony analysis is applied properly and timely on the ringdown data. Thus, the mode estimation results can be performed reliably and timely. The proposed method is tested using Monte Carlo simulations based on a 17-machine model and is shown to be able to properly identify the oscillation data for on-line application of Prony analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Possible Improvements of the ACE Diversity Interchange Methodology

North American Electric Reliability Corporation (NERC) grid is operated by about 131 balancing authorities (BA). Within each BA, operators are responsible for managing the unbalance (caused by both load and wind). As wind penetration levels increase, the challenges of managing power variation increases. Working independently, balancing area with limited regulating/load following generation and high wind power penetration faces significant challenges. The benefits of BA cooperation and consolidation increase when there is a significant wind energy penetration. To explore the benefits of BA cooperation, this paper investigates ACE sharing approach. A technology called ACE diversity interchange (ADI) is already in use in the western interconnection. A new methodology extending ADI is proposed in the paper. The proposed advanced ADI overcoming some limitations existing in conventional ADI. Simulations using real statistical data of CAISO and BPA have shown high performance of the proposed advanced ADI methodology.

17 WIND ENERGY↗

Initial Studies on Actionable Control for Improving Small Signal Stability in Interconnected Power Systems

Power consumption and demand continues to grow around the world. As the electric power grid continues to be put under more stress, the conditions of instability are more likely to occur. One cause of such instabilities is intearea oscillations, such as the oscillation that resulted in the August 10, 1996 blackout of the WECC. This paper explores different potential operations of different devices on the power system to improve the damping of these interarea oscillations using two different simulation models

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probing Signal Design for Power System Identification

This paper investigates the design of effective input signals for low-level probing of power systems. In 2005, 2006, and 2008 the Western Electricity Coordinating Council (WECC) conducted four large-scale system wide tests of the western interconnected power system where probing signals were injected by modulating the control signal at the Celilo end of the Pacific DC intertie. A major objective of these tests is the accurate estimation of the inter-area electromechanical modes. A key aspect of any such test is the design of an effective probing signal that leads to measured outputs rich in information about the modes. This paper specifically studies low-level probing signal design for power-system identification. The paper describes the design methodology and the advantages of this new probing signal which was successfully applied during these tests. This probing input is a multi-sine signal with its frequency content focused in the range of the inter-area modes. The period of the signal is over two minutes providing high-frequency resolution. Up to 15 cycles of the signal are injected resulting in a processing gain of 15. The resulting system response is studied in the time and frequency domains. Because of the new probing signal characteristics, these results show significant improvement in the output SNR compared to previous tests.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Improving Area Control Error Diversity Interchange (ADI) Program by Incorporating Congestion Constraints

The area control error (ACE) determines how much a balancing authority (BA) needs to move its regulating units to meet mandatory control performance standard requirements. Regulation is an expensive resource that could cost several hundred million dollars a year for a BA. The amount of regulation needed in a system is increasing with more intermittent generation resources added to the system. The ACE diversity interchange (ADI) program provides a tool for reducing the regulation requirement by combining ACEs from several participating BAs followed by sharing the total ACE among all participating balancing areas. The effect is achieved as a result of the low statistical correlation between the original ACEs of participating BAs. A rule-based ADI approach has already been put into practice in the US Western Interconnection. The degree of actual ACE sharing is artificially limited because of the unknown redistribution of power flows and possible system congestion (these factors are not monitored in the existing ADI). This paper proposes a two-step linear programming (LP) ADI approach that incorporates congestion constraints. In the first step of the proposed LP ADI, the line transmission limits are enforced by setting up corresponding constraints. In the second step, the business fairness is pursued. Simulation is performed to compare the properties of the proposed LP ADI and the existing rule-based ADI. Favorable features, such as avoiding line limit violations and increasing the degree of possible ACE sharing, are observed for the proposed LP ADI.

99 GENERAL AND MISCELLANEOUS↗

Electromechanical Mode On-line Estimation using Regularized Robust RLS Methods

This paper proposes a regularized robust recursive least squares (R3LS) method for on-line estimation of power-system electromechanical modes based on synchronized phasor measurement unit (PMU) data. The proposed method utilizes an autoregressive moving average exogenous (ARMAX) model to account for typical measurement data, which includes low-level pseudo-random probing, ambient, and ringdown data. A robust objective function is utilized to reduce the negative influence from non-typical data, which include outliers and missing data. A dy-namic regularization method is introduced to help include a priori knowledge about the system and reduce the influence of under-determined problems. Based on a 17-machine simulation model, it is shown through the Monte-Carlo method that the proposed R3LS method can estimate and track electromechanical modes by effectively using combined typical and non-typical measurement data.

24 POWER TRANSMISSION AND DISTRIBUTION↗