Engineering Papers⌕ Search

Engineering topics

Zhao, Yinfeng

Publications and source records attributed to Zhao, Yinfeng.

ML-Based Power System Stability Assessment Considering Network Topology Changes: WECC 20,000+ Bus System Case Study

Modern power grids are fast-changing and thus require real-time monitoring and online stability assessment. With the rapid development of machine learning (ML) techniques, using data-driven models to provide fast and accurate estimations of power system stability marginal information, such as frequency nadir for frequency stability and critical clearing time (CCT) for transient stability, have become possible. However, despite the numerous research on ML-based methods for frequency nadir and CCT prediction, there is limited work on the impact of different network topology changes. Furthermore, most previous studies only focused on small or synthetic systems, and there is a lack of research on actual large power system models. In this paper, the above issues are addressed by studying the actual U.S. Western Electricity Coordinating Council (WECC) system model with more than 20,000 buses. Massive simulations are conducted in PowerWorld Simulator to study the impact of various topology change scenarios on both frequency stability and transient stability. System operating information is extracted from the success dispatch cases of various network topologies to generate a comprehensive dataset for ML-based models. Two ML methods, random forest (RF) and multilayer perceptron (MLP) neural network, are trained and tested for both frequency nadir prediction and CCT prediction. Test results have proven the models are capable of online stability assessment for large power networks such as the WECC system with sufficient accuracy.

critical clearing time↗

AI-Based Faster-Than-Real-Time Stability Assessment of Large Power Systems with Applications on WECC System

Achieving clean energy goals will require significant advances in regard to addressing the computational needs for next-generation renewable-dominated power grids. One critical obstacle that lies in the way of transitioning today’s power grid to a renewable-dominated power grid is the lack of a faster-than-real-time stability assessment technology for operating a fast-changing power grid. This paper proposes an artificial intelligence (AI) -based method that predicts the system’s stability margin information (e.g., the frequency nadir in the frequency stability assessment and the critical clearing time (CCT) value in the transient stability assessment) directly from the system operating conditions without performing the conventional time-consuming time-domain simulations over detailed dynamic models. Since the AI method shifts the majority of the computational burden to offline training, the online evaluation is extremely fast. This paper has tested the AI-based stability assessment method using multiple dispatch cases that are converted and tuned from actual dispatch cases of the Western Electricity Coordinating Council (WECC) system model with more than 20,000 buses. The results show that the AI-based method could accurately predict the stability margin of such a large power system in less than 0.2 milliseconds using the offline-trained AI agent. Therefore, the proposed method has great potential to achieve faster-than-real-time stability assessment for practical large power systems while preserving sufficient accuracy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Learning Based Frequency Stability Assessment in Power Grid with High Renewables

Frequency stability assessment is one critical aspect of power system security assessment. Traditional N-1 screening method is based on the simulations of a few typical daily and seasonal operation scenarios. However, the increasing integration of inverter-based renewables and the retirement of conventional synchronous generators result in decreasing system inertia and growing complexity of system operating conditions. Selecting a few typical operation scenarios cannot cover all operating conditions, and the time-domain simulation of all operation conditions requires tremendous time. This paper proposes a more efficient frequency stability assessment method based on deep learning. The affinity propagation clustering algorithm is used to divide the dataset into different clusters, so the selected dataset for training can cover the diversified operating conditions as much as possible. Also, feature normalization is applied to both the training dataset and testing dataset in order to remove any unnecessary bias. Especially, trained model based on full dataset normalization has bounded error in the prediction. The case study on the reduced 240-bus WECC system demonstrates that the proposed method can predict accurate frequency nadir with limited training dataset. The deep learning model using the revised feature normalization can predict more accurate frequency nadir than that using the traditional feature normalization and has very small maximum prediction error.

affinity propagation↗

A Fast and Accurate Transient Stability Assessment Method Based on Deep Learning: WECC Case Study

Transient stability is one of the critical aspects of power system stability assessment. The increasing integration of inverter-based resources and the retirement of conventional synchronous generators result in the decreasing system inertia and growing complexity of system operating conditions. Using a few selected typical operating conditions cannot guarantee system transient stability in all operating conditions, and the time-domain simulation of all operating conditions requires tremendous time and is often infeasible. This paper proposes a more efficient transient stability assessment method based on deep learning. The binary search method is used to determine the critical clearing time (CCT) in creating training databased by time-domain simulation. This method is fast and accurate with 1 ms resolution. The buses whose CCTs are lower than 200 ms are considered critical buses. Buses close to each other are grouped based on their mutual admittance matrix to reduce the search space of the critical buses. This paper also proposes the generator feature normalization based on the physical model. Case study on the reduced 240-bus WECC system model demonstrates that the proposed method can predict CCT accurately and efficiently.

critical clearing time↗