Engineering Papers⌕ Search

Engineering topics

Zernic, Mike

Publications and source records attributed to Zernic, Mike.

ACTS 118x Final Report High-Speed TCP Interoperability Testing

With the recent explosion of the Internet and the enormous business opportunities available to communication system providers, great interest has developed in improving the efficiency of data transfer using the Transmission Control Protocol (TCP) of the Internet Protocol (IP) suite. The satellite system providers are interested in solving TCP efficiency problems associated with long delays and error-prone links. Similarly, the terrestrial community is interested in solving TCP problems over high-bandwidth links. Whereas the wireless community is interested in improving TCP performance over bandwidth constrained, error-prone links. NASA realized that solutions had already been proposed for most of the problems associated with efficient data transfer over large bandwidth-delay links (which include satellite links). The solutions are detailed in various Internet Engineering Task Force (IETF) Request for Comments (RFCs). Unfortunately, most of these solutions had not been tested at high-speed (155+ Mbps). Therefore, the NASA's ACTS experiments program initiated a series of TCP experiments to demonstrate scalability of TCP/IP and determine how far the protocol can be optimized over a 622 Mbps satellite link. These experiments were known as the 118i and 118j experiments. During the 118i and 118j experiments, NASA worked closely with SUN Microsystems and FORE Systems to improve the operating system, TCP stacks. and network interface cards and drivers. We were able to obtain instantaneous data throughput rates of greater than 520 Mbps and average throughput rates of 470 Mbps using TCP over Asynchronous Transfer Mode (ATM) over a 622 Mbps Synchronous Optical Network (SONET) OC12 link. Following the success of these experiments and the successful government/industry collaboration, a new series of experiments. the 118x experiments. were developed.

Ivancic, William D.↗

ACTS 118x: High Speed TCP Interoperability Testing

With the recent explosion of the Internet and the enormous business opportunities available to communication system providers, great interest has developed in improving the efficiency of data transfer over satellite links using the Transmission Control Protocol (TCP) of the Internet Protocol (IP) suite. The NASA's ACTS experiments program initiated a series of TCP experiments to demonstrate scalability of TCP/IP and determine to what extent the protocol can be optimized over a 622 Mbps satellite link. Through partnerships with the government technology oriented labs, computer, telecommunication, and satellite industries NASA Glenn was able to: (1) promote the development of interoperable, high-performance TCP/IP implementations across multiple computing / operating platforms; (2) work with the satellite industry to answer outstanding questions regarding the use of standard protocols (TCP/IP and ATM) for the delivery of advanced data services, and for use in spacecraft architectures; and (3) conduct a series of TCP/IP interoperability tests over OC12 ATM over a satellite network in a multi-vendor environment using ACTS. The experiments' various network configurations and the results are presented.

Brooks, David E.↗

Evolutionary growth for Space Station Freedom electrical power system

Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased Space Station user requirements and advancing technologies. The Space Station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial Space Station systems such as guidance, navigation, and control, external thermal, truss structural stiffness, computational capabilities and storage, which must be planned-in, in order to facilitate the addition of the solar dynamic modules.

Marshall, Matthew Fisk↗