Preliminary Screening of Features, Events, and Processes for an Arctic-Focused Climate Intervention Performance Assessment

Geoengineering, the deliberate large-scale intervention in Earth's climate system, holds significant potential in the rapidly warming Arctic, where temperatures currently rise at more than twice the global average, accelerating ice sheet and permafrost melt. This contributes to global sea-level rise and releases methane, a potent greenhouse gas. Strategies like solar radiation management (SRM) and carbon dioxide removal (CDR) could mitigate these effects; for instance, SRM techniques aim to reflect a portion of the sun's energy back into space, potentially slowing ice melt and stabilizing permafrost. However, geoengineering in the Arctic faces challenges, including potential unintended consequences on the fragile ecosystem, disruption of local weather patterns, and impacts on indigenous communities. Effective governance requires robust international cooperation, environmental impact assessments, and regulatory frameworks. Despite these challenges, geoengineering's potential benefits make it a critical research area. This report explores application of the Performance Assessment (PA) methodology to Arctic Climate Intervention, providing an initial screening of relevant features, events, and processes (FEPs). At the core of the PA approach is the identification and evaluation of FEPs that could impact the performance of the intervention scheme. Here we provide an initial screening of FEPs to consider in the application of PA to Arctic Climate Intervention.

54 ENVIRONMENTAL SCIENCES↗

Strategic Petroleum Reserve Cavern Leaching Monitoring CY23

The effects of raw water leaching at the U.S. SPR were modeled using SANSMIC. In addition to 18 caverns identified in previous leaching reports, six caverns have been identified for further monitoring based on the results of this report. SANSMIC continues to serve as a useful tool for monitoring changes in cavern shape. However, some caverns where string cuts were made in the middle of drawdowns are showing overprediction in the SANSMIC model when compared with recent sonars.

02 PETROLEUM↗

Strategic Petroleum Reserve Cavern Leaching Monitoring CY22

The U.S. Strategic Petroleum Reserve (SPR) is a crude oil storage system administered by the U.S. Department of Energy. SPR injected a total of over 230 MMB of raw water into 48 caverns as part of oil sales in CY22. Leaching effects were monitored in these caverns to understand how the sales operations may impact the long-term integrity of the caverns. The leaching effects were modeled here using the Sandia Solution Mining Code, SANSMIC. The modeling results indicate that leaching-induced features do not raise concern for the majority of the caverns. In addition to 12 caverns identified in previous leaching reports, seven caverns have been identified for further monitoring based on the results of this report. Twenty-two caverns had pre- and post-leach sonars that were compared with SANSMIC results. Overall, SANSMIC was able to capture the leaching well.

02 PETROLEUM↗

Parametric Study of SANSMIC Input and Resulting Impact on Predicted Cavern Geometry and Leaching Efficiency

The Sandia Solution Mining Code (SANSMIC) has been used for many years to examine the development of salt cavern geometry, both in a confirmatory manner with comparisons made to real-world sonar data and in a predictive manner when updated sonar data are not available. SANSMIC models require some modeling choices in order to incorporate real-world data. Key modeling choices include the vertical resolution of cavern geometry to implement, as well as how to incorporate daily raw water injection data into the SANSMIC model. This report documents five studies that address the impact of the modeling choices on the predicted cavern geometries and calculated leaching efficiencies. In most cases, hypothetical cylindrical initial cavern geometries are used to provide a common baseline against which to test the systematic variation of input variables including cavern radius, oil-brine-interface (OBI) depth, vertical cell size, raw water injection rate, raw water injection duration, workover time, and number of leaching stages. The use of smaller cell sizes is recommended moving forward to provide a better one-to-one relationship between sonar data and the modeled cavern. A new methodology for incorporating raw water injection data is also recommended, in order to more closely model real-world injection and workover times. Overall, the systematic studies performed here have increased our confidence in previous SANSMIC model results, as well future use of the code for predicting leaching effects on cavern geometries. Some minor changes to modeling choices are recommended, which can easily be applied with the version of SANSMIC currently under development.

42 ENGINEERING↗

Strategic Petroleum Reserve Cavern Leaching Monitoring CY20

The U.S. Strategic Petroleum Reserve is a crude oil storage system run by the U.S. Department of Energy. The reserve consists of 60 active storage caverns spread across four sites in Louisiana and Texas, near the Gulf of Mexico. Beginning in 2016, the SPR began executing U.S. congressionally mandated oil sales. The configuration of the reserve, with a total capacity of greater than 700 MMB, requires raw water to be used instead of saturated brine for oil withdrawals such as for sales. All sales will produce leaching within the caverns used for oil delivery. Twenty-five caverns had a combined total of over 39 MMB of water injected in CY 20 as part of the Exchange for Storage program; oil was withdrawn in the same manner as for congressionally mandated sales. Leaching effects were monitored in these caverns to understand how the oil withdrawals may impact the long-term integrity of the caverns. While frequent sonars are the best way to monitor changes in cavern shape, they can be resource intensive for the number of caverns involved in sales and exchanges. An intermediate option is to model the leaching effects and see if any concerning features develop. The leaching effects were modeled here using the Sandia Solution Mining Code (SANSMIC) . The results indicate that leaching induced features are not of concern in the majority of the caverns, 19 of 25. Six caverns, BH-107, BH-113, BH-114, BM-4, BM-106, and WH-114 have features that may grow with additional leaching and should be monitored as leaching continues in those caverns. Ten caverns had post sale sonars that were compared with SANSMIC results. SANSMIC was able to capture the leaching well , particularly the formation of shelves and flares. A deviation in the SANSMIC and sonar cavern shapes was observed near the cavern floor in caverns with significant floor rise, a process not captured by SANSMIC. These results suggest SANSMIC is a useful tool for monitoring changes in cavern shape due to leaching effects related to sales and exchanges.

02 PETROLEUM↗

WIPP PA Sensitivity Studies in Support of CRA-2014 Completeness Determination and Compliance Decision - 18209

The Waste Isolation Pilot Plant (WIPP) has been developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of transuranic (TRU) waste. Containment of TRU waste at the WIPP is regulated by the U.S. Environmental Protection Agency (EPA). The DOE demonstrates compliance with the containment requirements by means of performance assessment (PA) calculations. WIPP PA calculations estimate the probability and consequence of potential radionuclide releases from the repository to the accessible environment for a regulatory period of 10,000 years after facility closure. Since TRU waste was first received at the WIPP in 1999, compliance recertification applications (CRAs) have been required by the EPA on five-year cycle. The latest CRA (CRA-2014) was submitted by the DOE to the EPA in 2014. As part of the application, a formal set of PA calculations (CRA-2014 PA) was performed and results were documented in detail. The CRA-2014 PA incorporated several parameter updates based on new data, as well as the implementation of a different model for panel closures, barriers planned for the opening of each waste panel. The results presented as part of the CRA-2014 showed via the required complementary cumulative distribution function (CCDF) release curves that the estimated releases were within compliance limits. As part of their process for reviewing the completeness of the CRA-2014 [1], the EPA formally requested that the DOE perform sensitivity studies based on EPA-requested changes to model parameters. The DOE performed and documented the results of three sensitivity studies described below: CRA14-SEN2 [2], CRA14-SEN3 [3], and CRA14-SEN4 [4]. In each case, the new analysis results were compared to CRA- 2014 PA (CRA14) results to determine the impact of the EPA-requested changes. CRA14-SEN2: the application of EPA-requested modified parameters in the operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model resulted in increased pressures and decreased brine saturations in waste areas and increased pressures and brine saturations in the operations and experimental areas. However, the overall effects on total high-probability mean releases from the repository were entirely insignificant. It was concluded that the modeling assumptions associated with the operations and experimental areas of the repository have an insignificant effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN3: the application of EPA-requested modified parameters in the panel closure areas and operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model predominantly result in increased pressures and decreased brine saturations in waste areas, increased pressures and brine saturations in the operations and experimental areas, and decreased brine and gas flows across all panel closures. The pressure increases in repository waste regions yielded slightly decreased brine saturations (on average) in those areas. However, the overall effects on total high-probability mean releases from the repository are entirely insignificant. It was concluded that the modeling assumptions made for this sensitivity study which were associated with the panel closures and north end areas of the repository have only a small effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN4: the application of several changes to the current WIPP PA model (CRA14), including: parameter changes, use of an updated code, and a revised computational grid for the BRAGFLO code. The modifications to the repository model resulted in increased releases in all primary release mechanisms. The impacts of each EPA-requested change to CRA14 were analyzed with respect to each release mechanism in the CRA14-SEN4 study. Overall, total high-probability predicted mean releases from the repository were increased by about 15%. Total low-probability predicted mean releases were increased by about 107%. It was concluded that the EPA-requested changes to the CRA14 result in increases to the predicted total releases from the repository. However, releases calculated in the CRA14-SEN4 analysis remained below regulatory limits, demonstrating continued compliance of the WIPP. In January 2017, the EPA determined that CRA-2014 was complete and then began a technical evaluation of CRA-2014 to determine whether the WIPP continued to comply with the radiation protection standards for disposal. During their evaluation, the EPA utilized the sensitivity study results to inform their ultimate determination in July 2017 that the WIPP continues to comply with regulatory standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Corrections to the Spallings Volume Calculation on Waste Isolation Pilot Plant Performance Assessment - 16135

The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant solid waste subject to material failure and transport to the surface (i.e., spallings) as a result of a hypothetical future inadvertent drilling intrusion into the repository. An error in the implementation of the DRSPALL finite difference equations was discovered and documented in a software problem report in accordance with the quality assurance procedure for software requirements. This paper describes the corrections to DRSPALL and documents the impact of the new spallings data from the modified DRSPALL on previous performance assessment calculations. Updated performance assessments result in more simulations with spallings, which generally translates to an increase in spallings releases to the accessible environment. Total normalized radionuclide releases using the modified DRSPALL data were determined by forming the summation of releases across each potential release pathway, namely borehole cuttings and cavings releases, spallings releases, direct brine releases, and transport releases. Because spallings releases are not a major contributor to the total releases, the updated performance assessment calculations of overall mean complementary cumulative distribution functions for total releases are virtually unchanged. Therefore, the corrections to the spallings volume calculation did not impact Waste Isolation Pilot Plant performance assessment calculation results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗