Engineering Papers⌕ Search

Engineering topics

Wu, Genfa

Publications and source records attributed to Wu, Genfa.

36 records · Page 2

Status of PIP-II 650 MHz Prototype Dressed Cavity Qualification

Low-beta and high-beta sections of PIP-II linac will use nine low-beta cryomodules with four cavities each and four high-beta cryomodules with six cavities each. These cavities will be produced and qualified in collaboration between Fermilab and the international partner labs. Prior to their installation into prototype cryomodules, several dressed cavities, which include jacketed cavities, high power couplers, and tuners, will be qualified in STC horizontal test bed at Fermilab. After qualification of bare β = 0.9 cavities at Fermilab, several pre-production β = 0.92 and β = 0.61 cavities have been and are being fabricated and qualified. Procurements have also been started for high power couplers and tuners. In this contribution we present the current status of prototype dressed cavity qualification for PIP-II.

43 PARTICLE ACCELERATORS↗

3.9 GHz SRF Production Cavities for LCLS-II

The main part of the SRF linac for the Linac Coherent Light Source II (LCLS-II) at SLAC will consist of 35 cryomodules with superconducting RF cavities operating at 1.3 GHz. In addition, two cryomodules with 3.9 GHz cavities will be installed and help to linearize the longitudinal phase space of the beam. During the design verification phase, four prototype 9-cell 3.9 GHz cavities had been built by industry and then processed, including chemical surface removal and heat treatment, and tested at Fermi National Accelerator Laboratory. Based on the resulting cavity treatment recipe, 24 cavities (for two cryomodules to be installed in the linac and one spare cryomodule) have been built by industry and tested at Fermilab prior to cryomodule string assembly. We present an overview of the cavity production and the results of the vertical acceptance tests for the LCLS-II 3.9 GHz cavities.

43 PARTICLE ACCELERATORS↗

Overview of LCLS-II Project Status at Fermilab

The superconducting RF Continuous-Wave (CW) Linac for the LCLS-II consists of thirty-five 1.3 GHz and two 3.9 GHz cryomodules that Fermilab and Jefferson Lab are jointly producing in collaboration with SLAC. Fermilab’s scope of work is to build, test, and deliver half the 1.3 GHz and all the 3.9 GHz cryomodules and to design and procure components for the cryogenic distribution system. Fermilab has primary responsibility for delivering a working design. The cryomodule design basis was the European XFEL but several elements evolved to meet CW operation requirements and specifics of the SLAC tunnel. There have been several challenges faced during the design, assembly, testing and transportation of the cryomodules which have required design updates. Success in overcoming these challenges is attributable to the strength of the LCLS-II SRF Collaboration (Fermilab, Jefferson Lab and SLAC with extensive help from DESY and CEA/Saclay). The cryogenic distribution system has progressed relatively well and there are valuable Lessons Learned. An overview of the status, accomplishments, problems encountered, solutions developed, and a summary of Lessons Learned will be presented.

43 PARTICLE ACCELERATORS↗

Magnetic Field Induced by Thermo Electric Current in LCLS-II Cryomodules

Seebeck effect of metals play an important role in cryomodule design. As cryomodule cools down from room temperature down to nominal cavity operating temperature, components in a cryomodule experiences different temperatures. Some components such as power couplers cross from room temperature to 2 K. Thermo electric current forms loops circulating through and around cavities. Such current loops will generate additional magnetic field that could be trapped into cavity wall during superconducting transition as well as during cavity quench. These trapped field can degrade cavity quality factor and increase heat load. Simple circuit model is proposed and compared to calculated trapped field during cryomodule tests.

43 PARTICLE ACCELERATORS↗

Performance of the First LCLS-II Cryomodules: Issues and Solutions

LCLS-II 4 GeV linac is on the middle production stage. Linac contains 40 cryomodules of 1.3 GHz and 3 cryomodules of 3.9 GHz, including spares. Fermilab and JLAB share responsibility for cryomodule design, assembly and test. Paper will overview the performance of the cryomodules it the tests, lessons learned and modifications in design to improve performance.

43 PARTICLE ACCELERATORS↗

LCLS-II Cryomodules Production at Fermilab

LCLS-II is a planned upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac will consist of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF continuous wave (CW) cryomodules that Fermilab and Jefferson Lab are currently producing in collaboration with SLAC. The LCLS-II 1.3 GHz cryomodule design is based on the European XFEL pulsed-mode cryomodule design with modifications needed for CW operation. Two prototype cryomodules had been assembled and tested. After prototype cryomodule tests, both laboratories have increased cryomodule production rate to meet the challenging LCLS-II project installation schedule requirements of approximately one cryomodule per month per laboratory. Fermilab is at half point for the production, meaning that 6 cryomodules are fully assembled and tested. This paper presents Fermilab Cryomodule Assembly Facility (CAF) infrastructure for the LCLS-II cryomodules assembly, production experience at the half point emphasizing the challenges and mitigations.

43 PARTICLE ACCELERATORS↗

Passive Microphonics Mitigation during LCLS-II Cryomodule Testing at Fermilab

The LCLS-II project calls for cryomodule production and testing at both Fermilab and JLab. Due to low beam loading and high cavity quality factor, the designed peak detuning specification is 10 Hz. Initial testing showed peak detuning up to 150 Hz with a complex and varying time-structure, showing both fast (1-2 second) and slow (1-2 hour) drifts in amplitude and spectrum. Extensive warm and cold testing showed Thermoacoustic Oscillations in the cryogenic valves were the primary source of the microphonics. This was mitigated by valve wipers and valve re-plumbing, resulting in a greatly improved cavity detuning environment. Additional modifications were made to the cavity mechanical supports and Fermilab test stand to improve detuning performance. These modifications and testing results will be presented.

43 PARTICLE ACCELERATORS↗

3.9 GHz Power Coupler Design and Tests for LCLS-II Project

LCLS-II linac requires two 3.9 GHz cryomodules (eight cavities per CM), operating up to 16MV/m in cw regime. Fermilab has designed and built few prototypes of the cavity and auxiliaries and tested them at the vertical and horizontal cryostats. Fundamental power coupler, based on existing design (FLASH, XFEL) was redesign for 2kW average power. We built three prototypes and tested them at room temperature test stand. One coupler was assembled on the cavity and tested at horizontal cryostat as part of design verification program. Test results and comparison with simulations are discussed in this paper.

43 PARTICLE ACCELERATORS↗

Design and Test Results of the 3.9 GHz Cavity for LCLS-II

The LCLS-II project uses sixteen 3.9 GHz superconduct-ing cavities to linearize energy distribution before the bunch compressor. To meet LCLS-II requirements origi-nal FNAL design used in FLASH and XFEL was signifi-cantly modified to improve performance and provide reliable operation up to 16 MV/m in cw regime [1-3]. Four prototype cavities were built and tested at vertical cryo-stat. After dressing, one cavity was assembled and tested at horizontal cryostat as part of design verification pro-gram. All auxiliaries (magnetic shielding, power and HOM couplers, tuner) were also re-designed and tested with this cavity. In this paper we will discuss cavity and coupler design and test results.

43 PARTICLE ACCELERATORS↗

Operational Experience from LCLS-II Cryomodule Testing

This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

Wang, Renzhuo↗

Commissioning And First Results From The Fermilab Cryomodule Test Stand

A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

43 PARTICLE ACCELERATORS↗

Cryomodule Test Stand Reduced-Magnetic Support Design At Fermilab

In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These devices will be tested at Fermilab's Cryomodule Test Facility (CMTF) within the Cryomodule Test Stand (CMTS-1) cave. The problem of magnetic pollution became one of major issues during design stage of the LCLS-II cryomodule as the average quality factor of the accelerating cavities is specified to be $2.7 \times 10^{10}$. One of the possible ways to mitigate the effect of stray magnetic fields and to keep it below the goal of 5 mGauss involves the application of low permeable materials. Initial permeability and magnetic measurement studies regarding the use of 316L stainless steel material indicated that cold work (machining) and heat affected zones from welding would be acceptable.

43 PARTICLE ACCELERATORS↗

Three-cell traveling wave superconducting test structure

Use of a superconducting traveling wave accelerating (STWA) structure with a small phase advance per cell rather than a standing wave structure may provide a significant increase of the accelerating gradient in the ILC linac. For the same surface electric and magnetic fields the STWA achieves an accelerating gradient 1.2 larger than TESLA-like standing wave cavities. The STWA allows also longer acceleration cavities, reducing the number of gaps between them. However, the STWA structure requires a SC feedback waveguide to return the few hundreds of MW of circulating RF power from the structure output to the structure input. A test single-cell cavity with feedback was designed, manufactured and successfully tested demonstrating the possibility of a proper processing to achieve a high accelerating gradient. These results open way to take the next step of the TW SC cavity development: to build and test a travelingwave three-cell cavity with a feedback waveguide. The latest results of the single-cell cavity tests are discussed as well as the design of the test 3-cell TW cavity.

43 PARTICLE ACCELERATORS↗

First High-gradient Tests of the Single-cell SC Cavity with the Feedback Waveguide

Use of a superconducting travelling wave accelerating (STWA) structure with a small phase advance per cell rather than a standing wave structure may provide a significant increase in the accelerating gradient in the ILC linac [1]. For the same surface electric and magnetic fields the STWA achieves an accelerating gradient 1.2 larger than TESLA-like standing wave cavities. In addition, the STWA allows longer acceleration cavities, reducing the number of gaps between them. However, the STWA structure requires a SC feedback waveguide to return the few hundreds of MW of circulating RF power from the structure output to the structure input. A test single-cell cavity with feedback was designed and manufactured to demonstrate the possibility of a proper processing to achieve a high accelerating gradient. The first results of high-gradient tests of a prototype 1.3 GHz single-cell cavity with feedback waveguide will be presented.

43 PARTICLE ACCELERATORS↗

Cryogenic vacuumm RF feedthrough device

A cryogenic vacuum rf feedthrough device comprising: 1) a probe for insertion into a particle beam; 2) a coaxial cable comprising an inner conductor and an outer conductor, a dielectric/insulating layer surrounding the inner conductor, the latter being connected to the probe for the transmission of higher mode rf energy from the probe; and 3) a high thermal conductivity stub attached to the coaxial dielectric about and in thermal contact with the inner conductor which high thermal conductivity stub transmits heat generated in the vicinity of the probe efficiently and radially from the area of the probe and inner conductor all while maintaining useful rf transmission line characteristics between the inner and outer coaxial conductors.

47 OTHER INSTRUMENTATION↗

DIAGNOSIS, ANALYSIS, AND RESOLUTION OF THERMAL STABILITY ISSUES WITH HOM COUPLERS ON PROTOTYPE CEBAF SRF CAVITIES

During initial testing of the prototype cavities incorporated into the developmental cryomodule Renascence severe thermal stability issues were encountered during CW operation. Additional diagnostic instrumentation was added. This enabled identification of an unanticipated thermal impedance between the HOM coupler probe feedthrough assembly and the cavity beamtube. Subsequent detailed FE analysis successfully modeled the situation and indicated the need for alternate cooling path for the couplers on those cavities. HOM damping was measured to be adequate employing only two of the four HOM couplers. The two pickup probes on the couplers at the input power coupler side of each cavity were removed, the remaining HOM probe feedthroughs were heat stationed to two-phase helium supply piping, and a novel heat sink was added to station both the inner and outer conductors of the remaining HOM rf cables. The characterization measurements, analysis, modifications, and resulting performance are presented.

43 PARTICLE ACCELERATORS↗

OPTIMIZATION OF THE SRF CAVITY DESIGN FOR THE CEBAF 12 GEV UPGRADE

Based on initial testing of the “HG” and “LL” 7-cell cavities in the prototype cryomodule Renascence, several opportunities for improved optimization were identified. The HOM damping configuration was refined so as to meet the requirements for damping key dipole modes while simultaneously dramatically reducing risk of HOM pickup probe heating and also creating beamline clearance for mounting the tuner to stainless steel helium vessel endplates (rather than NbTi/Ti transitions to a titanium helium vessel). Code modeling and bench measurements were performed. The new design maintains the 7-cell LL cells and incorporates a brazed transition between Nb and the SS helium vessel. The resulting configuration is now called the “C100” design. Cavity design details as well as vertical dewar and horizontal test bed performance are presented.

36 MATERIALS SCIENCE↗

WAVEGUIDE COUPLER KICK TO BEAM BUNCH AND CURRENT DEPENDENCY ON SRF CAVITIES

JLAB SRF cavities employ waveguide type fundamental power couplers (FPC). The FPC design for the 7-cell upgrade cavities was optimized to minimize the dipole field kick. For continuous wave (CW) operation, the forwarding RF power will be at different magnitude to drive the different beam current and cavity gradient. This introduces some deviation from optimized FPC field for varying beam loading. This article analyzes the beam behavior both in centroid kick and head-tail kick under different beam loading conditions.

43 PARTICLE ACCELERATORS↗