Engineering Papers⌕ Search

Engineering topics

Woodley, M

Publications and source records attributed to Woodley, M.

At least 19 records

Plasmas, Dielectrics and the Ultrafast: First Science and Operational Experience at FACET

FACET (Facility for Advanced Accelerator and Experimental Tests) is an accelerator R&D test facility that has been recently constructed at SLAC National Accelerator Laboratory. The facility provides 20 GeV, 3 nC electron beams, short (20 {micro}m) bunches and small (20 {micro}m wide) spot sizes, producing uniquely high power beams. FACET supports studies from many fields but in particular those of Plasma Wakefield Acceleration and Dielectric Wakefield Acceleration. FACET is also a source of THz radiation for material studies. We present the FACET design, initial operating experience and first science from the facility.

36 MATERIALS SCIENCE↗

Intensity Effects of the FACET Beam in the SLAC Linac

The beam for FACET (Facility for Advanced aCcelerator Experimental Tests) at SLAC requires an energy-time correlation ('chirp') along the linac, so it can be compressed in two chicanes, one at the midpoint in sector 10 and one W-shaped chicane just before the FACET experimental area. The induced correlation has the opposite sign to the typical used for BNS damping, and therefore any orbit variations away from the center kick the tail of the beam more than the head, causing a shear in the beam and emittance growth. Any dispersion created along the linac has similar effects due to the high (>1.2% rms) energy spread necessary for compression. The initial huge emittances could be reduced by a factor of 10, but were still bigger than expected by a factor of 2-3. Normalized emittance of 3 {micro}m-rad in Sector 2 blew up to 150 {micro}m-rad in Sector 11 but could be reduced to about 6-12 {micro}m-rad, for the vertical plane although the results were not very stable. Investigating possible root causes for this, we found locations where up to 10 mm dispersion was created along the linac, which were finally verified with strong steering and up to 7 mm settling of the linac accelerator at these locations.

43 PARTICLE ACCELERATORS↗

FACET: SLAC___s New User Facility

FACET (Facility for Advanced Accelerator Experimental Tests) is a new User Facility at SLAC National Accelerator Laboratory. The first User Run started in spring 2012 with 20 GeV, 3 nC electron beams. The facility is designed to provide short (20 {micro}m) bunches and small (20 {micro}m wide) spot sizes, producing uniquely high power beams. FACET supports studies from many fields but in particular those of Plasma Wakefield Acceleration and Dielectric Wakefield Acceleration. The creation of drive and witness bunches and shaped bunch profiles is possible with 'Notch' Collimation. FACET is also a source of THz radiation for material studies. Positrons will be available at FACET in future user runs. We present the User Facility and the available tools and opportunities for future experiments.

43 PARTICLE ACCELERATORS↗

The Multi Optical Transition Radiation System

The determination and monitoring of the transverse phase space in ATF2 is crucial in order to meet their performances specifications. Since the beam sizes at the Interaction Point (IP) depend strongly on the aberrations in the Final Focus System (FFS), accurate measurement upstream of the FFS is required to tune the beam sizes at the IP. The beam sizes as well as the emittance are measured in several locations in the beam diagnostic section of the Extraction Line (EXT line) of ATF2. The vertical beam sizes in the diagnostic section are of the order of 10 {mu}m this means that the devices have to image spot sizes as small as 5 {mu}m, with 10% accuracy a 2 {mu}m resolution device is necessary. The ATF2 EXT line is a beam line with low power and low repetition rate that make usable devices using solid targets. In contrast to a ring machine, where an individual bunch can be measured many times as it passes around the ring, the beam size and the emittance measurement in the LC or in the beam lines have to be performed in a single pass. This requires that the wire scan device types (laser or solid) sample across successive bunches within a train, often with an over-estimation of the beam size due to beam position and intensity jitter, and can take up to half a minute to complete the measurement. Although some of these effects could be corrected, as the jitter effect could be subtracted by using the nearby BPMs signals, this can be avoided by using Optical Transition Radiation (OTR) Monitors. These monitors are based on the transition radiation effect, a light cone emitted when the charged particle crosses a metallic interface. This light is emitted in a specular fashion so it can be focused on to a CCD and produces an image of the beam. OTRs are able to take many fast measurements and therefore to measure the emittance with high statistics, giving a low error and a good understanding of the emittance jitter. In this article, simulations of the expected beam sizes and emittance, along with a technical description of the system, its hardware and software implementation are described. Additionally first measurement of the beam size and emittance of the Multi Optical Transition Radiation System located in the Extraction Line of ATF2 are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

All-optical Time-resolved Measurement of Laser Energy Modulation in a Relativistic Electron Beam

Hamiltonian light-front theory has been proposed as a promising method for solving bound states problems in quantum field theory a long time ago, see, e.g., the review article[1] for its various advantages compared to the traditional instant-form theories. Recently the Basis Light-Front Quantization (BLFQ) approach [2, 3] has been developed as a nonperturbative approach to solve Hamiltonian light-front quantum field theory. Numerical efficiency is a key advantage of this approach. The basic idea of BLFQ is to represent the theory in an optimal basis which respects many symmetries of the theory and thus minimizes the dimensionality of the Hamiltonian for a fixed precision. Specifically, the BLFQ approach employs a plane wave basis in the light-front longitudinal direction and a 2D harmonic oscillator basis in the transverse directions. In previous work [3] this approach has been applied to evaluate the anomalous magnetic moment of electrons which are confined in an external trap with an extrapolation to the zero trap limit. In this work we extend and improve this approach in several aspects including the direct evaluation of a free electron system. This article is organized as follows: In Sec. 2 we discuss the key extensions and improvements made in this work over Ref [3]; in Sec. 3 we present the numerical results for the electron anomalous magnetic moment evaluated in different harmonic oscillator bases and compare to the perturbation theory result. Finally we conclude and give an outline for future works in Sec. 4.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Optical Transition Radiation System for ATF2

In this paper we present the first measurements performed during the fall 2010 and early 2011 runs. Software development, simulations and hardware improvements to the Multi-Optical Transition Radiation System installed in the beam diagnostic section of the Extraction line of ATF2 are described. 2D emittance measurements have been performed and the system is being routinely used for coupling correction. Realistic beam simulations have been made and compared with the measurements. A demagnifier lens system to improve the beam finding procedure has been designed and will be implemented in a future run. We also discuss further work planned for the subsequent run periods.

43 PARTICLE ACCELERATORS↗

First Beam to FACET

The SLAC 3km linear electron accelerator has been reconfigured to provide a beam of electrons to the new Facility for Advanced Accelerator Experimental Tests (FACET) while simultaneously providing an electron beam to the Linac Coherent Light Source (LCLS). On June 23, 2011, the first electron beam was transported through this new facility. Commissioning of FACET is in progress. On June 23, 2011, an electron beam was successfully transported through the new FACET system to a dump in Sector 20 in the linac tunnel. This was achieved while the last third of the linac, operating from the same control room, but with a separate injector system, was providing an electron beam to the Linac Coherent Light Source (LCLS), demonstrating that concurrent operation of the two facilities is practical. With the initial checkout of the new transport line essentially complete, attention is now turning toward compressing the electron bunches longitudinally and focusing them transversely to support a variety of accelerator science experiments.

43 PARTICLE ACCELERATORS↗

A Comprehensive Study of Nanometer Resolution of the IPBPM at ATF2

High-resolution beam position monitors (IPBPMs) have been developed in order to measure the electron beam position at the focus point of ATF2 to a few nanometers in the vertical plane. To date, the IPBPM system has operated in test mode with a highest demonstrated resolution of 8.7 nm in the ATF extraction line during 2008. After expected noise source calculations there still remains 7.9 nm of noise of unexplained origin. We summarize the experimental work on the IPBPM system since this measurement and outline the possible origins of these sources. We then present a study plan to be performed at the ATF2 facility designed to identify and to improve the resolution performance and comment on the expected ultimate resolution of this system. The Accelerator Test Facility 2 (ATF2) is a test beamline for ILC final focus system in the framework of the ATF international collaboration which was constructed to extend the extraction line at ATF, located at KEK, Japan. There are two goals of the ATF2: firstly to demonstrate focusing to 37 nm vertical beam size, secondly to achieve a few nanometer level beam orbit stability at the focus point in the vertical plane. High-resolution beam position monitors (IPBPMs) for the interaction point (IP) have been developed in order to measure the electron beam position at the focus point of the ATF2 to a few nanometers in the vertical plane. The previous measured position resolution of IPBPMs was 8.7 nm for a 0.68 x 10{sup 10} e/bunch beam with a dynamic range of 5 {mu}m. The intrinsic noise of the system was estimated to be 2.6 nm at 10{sup 10} e/bunch. It is scaled to 3.8 nm at 0.68 x 10{sup 10} e/bunch which means that 7.9 nm of unknown noise remains. The origin of the unknown noise must be studied in order to improve the resolution. This paper describes the ongoing work to improve the resolution of IPBPMs.

43 PARTICLE ACCELERATORS↗

FACET: The New User Facility at SLAC

FACET (Facility for Advanced Accelerator and Experimental Tests) is a new User Facility at SLAC National Accelerator Laboratory. Its high power electron and positron beams make it a unique facility, ideal for beam-driven Plasma Wakefield Acceleration studies. The first 2 km of the SLAC linac produce 23 GeV, 3.2 nC electron and positron beams with short bunch lengths of 20 {mu}m. A final focusing system can produce beam spots 10 {mu}m wide. User-aided Commissioning took place in summer 2011 and FACET will formally come online in early 2012. We present the User Facility, the current features, planned upgrades and the opportunities for further experiments. Accelerators are our primary tool for discovering the fundamental laws to the universe. Each new frontier we probe requires a new, more powerful method. Accelerators are therefore increasing in size and cost. The future of this field requires new accelerating techniques that can reach the high energies required over shorter distances. New concepts for high gradient acceleration include utilizing the wakes in plasma and dielectric and metallic structures. FACET was built to provide a test bed for novel accelerating concepts with its high charge and highly compressed beams. As a test facility unlike any other, it has also attracted groups interested in beam diagnostic techniques and terahertz studies. The first phase of the construction was completed in May 2011. Beam commissioning began in June and was interleaved with the installation of five experiments. Users were invited to aid with the commissioning for the month of August during which time experimental hardware and software were checked out and some first measurements were taken. FACET is currently in the process of becoming a Department of Energy User Facility for High Energy Physics.

43 PARTICLE ACCELERATORS↗

Status of the ATF2 Lattices

The current status for the ATF2 Nominal and Ultra-low {beta}* lattices are presented in this paper. New lattice designs have been obtained in order to minimise the impact of the last interpretation of multipole measurements that have been included into the model. However, the new ATF2 Ultra-low design is not able to recover the expected vertical beam size at the IP with the current magnet distribution. Therefore, different quadrupole sorting have been studied. A significant gain is evident for the ATF2 Ultra-low lattice when sorting the magnets according to the skew-sextupolar components. The ATF2 Nominal lattice is also expected to benefit from the new sorting. Tuning results of the new ATF2 Ultra-low lattice under realistic imperfections are also reported.

43 PARTICLE ACCELERATORS↗

Status of the ATF Damping Ring BPM Upgrade Project

A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

43 PARTICLE ACCELERATORS↗

Study of Abnormal Vertical Emittance Growth in ATF Extraction Line

Since several years, the vertical beam emittance measured in the Extraction Line (EXT) of the Accelerator Test Facility (ATF) at KEK, that will transport the electron beam from the ATF Damping Ring (DR) to the future ATF2 Final Focus beam line, is significantly larger than the emittance measured in the DR itself, and there are indications that it grows rapidly with increasing beam intensity. This longstanding problem has motivated studies of possible sources of this anomalous emittance growth. One possible contribution is non-linear magnetic fields in the extraction region experimented by the beam while passing off-axis through magnets of the DR during the extraction process. In this paper, simulations of the emittance growth are presented and compared to observations. These simulations include the effects of predicted non-linear field errors in the shared DR magnets and orbit displacements from the reference orbit in the extraction region. Results of recent measurements using closed orbit bumps to probe the relation between the extraction trajectory and the anomalous emittance growth are also presented.

43 PARTICLE ACCELERATORS↗

4D Emittance Measurements Using Multiple Wire and Waist Scan Methods in the ATF Extraction Line

Emittance measurements performed in the diagnostic section of the Accelerator Test Facility (ATF) extraction line since 1998 led to vertical emittances three times larger than the expected ones, with a strong dependence on intensity. An experimental program is pursued to investigate potential sources of emittance growth and find possible remedies. This requires efficient and reliable emittance measurement techniques. In the past, several phase-space reconstruction methods developed at SLAC and KEK have been used to estimate the vertical emittance, based on multiple location beam size measurements and dedicated quadrupole scans. These methods have been shown to be very sensitive to measurement errors and other fluctuations in the beam conditions. In this context new emittance measurements have been performed revisiting these methods and newly developed ones with a systematic approach to compare and characterise their performance in the ATF extraction line.

43 PARTICLE ACCELERATORS↗

Commissioning the Echo-Seeding Experiment Echo-7 at SLAC

ECHO-7 is a proof-of-principle echo-enabled harmonic generation (EEHG) FEL experiment in the Next Linear Collider Test Accelerator (NLCTA) at SLAC. The experiment is intended to test the EEHG principle at low electron beam energy, 120 MeV, and determine the sensitivities and limitations to understand the expected performance at the higher energy scales and harmonic numbers required for x-ray FELs. In this paper we present the experimental results from the commissioning run of the completed experimental setup which started in April 2010.

43 PARTICLE ACCELERATORS↗

Demonstration of the Echo-Enabled Harmonic Generation Technique for Short-Wavelength Seeded Free Electron Lasers

We report the first experimental demonstration of the echo-enabled harmonic generation technique, which holds great promise for generation of high-power, fully coherent short-wavelength radiation. In this experiment, coherent radiation at the 3rd and 4th harmonics of the second seed laser is generated from the so-called beam echo effect. The experiment confirms the physics behind this technique and paves the way for applying the echo-enabled harmonic generation technique for seeded x-ray free electron lasers.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Preliminary results of the echo-seeding experiment at SLAC

ECHO-7 is a proof-of-principle echo-enabled harmonic generation FEL experiment in the Next Linear Collider Test Accelerator (NLCTA) at SLAC. The experiment aims to generate coherent radiation at 318 nm and 227 nm, which are the 5th and 7th harmonic of the infrared seed laser. In this paper we present the preliminary results from the commissioning run of the completed experimental setup which started in April 2010.

43 PARTICLE ACCELERATORS↗