Engineering Papers⌕ Search

Engineering topics

Wong, Roger

Publications and source records attributed to Wong, Roger.

Thorium chelators for targeted alpha therapy: Rapid chelation of thorium-226

We report one of the main challenges in targeted alpha therapy is assuring delivery of the α-particle dose to the targeted cells. Thus, it is critical to identify ligands for α-emitting radiometals that will form complexes that are very stable, both in vitro and in vivo. In this investigation, thorium-227 (t 1/2 = 18.70 days) chelation of ligands containing hydroxypyridinonate (HOPO) or picolinic acid (pa) moieties and the stability of the resultant complexes were studied. Chelation reactions were followed by reversed-phased HPLC and gamma spectroscopy. Studies revealed that high 227 Th chelation yields could be obtained within 2.5 h or less with ligands containing four Me-3,2-HOPO moieties, 1 (83%) and 2 (65%), and also with ligands containing pa moieties, H 4 octapa 3 (65%) and H 4 py4pa 6 (87%). No reaction occurred with H 4 neunpa-p-Bn-NO 2 4, and the chelation reaction with another pa ligand H 4 pypa 5 gave inconsistent yields with a very broad radio-HPLC peak. The ligands spermine-(Me-3,2-HOPO) 4 1, H 4 octapa 3, and H 4 py4pa 6 had high stability (i.e., 87% of 227 Th still bound to the ligand) in phosphate-buffered saline at room temperature over a 6-day period. Preliminary studies with ligand 6 demonstrated efficient chelation of thorium-226 (t 1/2 = 30.57 min) when heated to 80°C for 5 min.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Investigation of a tellurium-packed column for isolation of astatine-211 from irradiated bismuth targets and demonstration of a semi-automated system

Astatine-211 is an attractive radionuclide for use in targeted alpha therapy of blood-borne diseases and micrometastatic diseases. Efficient isolation methods that can be adapted to robust automated 211 At isolation systems are of high interest for improving the availability of 211 At. Based on the early studies of Bochvarova and co-workers involving isolation of 211 At from irradiated thorium targets, we developed a method for 211 At isolation from bismuth targets using tellurium-packed columns. Dissolution of irradiated bismuth targets is accomplished using HNO 3 ; however, 211 At is not captured on the Te column material in this matrix. Our method involves slow addition of aqueous NH 2 OH·HCl to the Bi target dissolved in HNO 3 to convert to a HCl matrix. The amount of NH 2 OH·HCl was optimized because (1) the quantity of NH 2 OH·HCl used appears to affect the radiolabeling yield of phenethyl- closo -decaborate(2-) (B10)-conjugated antibodies and (2) reducing the volume of NH 2 OH·HCl solution can effectively shorten the overall isolation time. A proof-of-concept semi-automated process has been demonstrated using targets containing ~0.96 GBq (~26 mCi) of 211 At. High isolation yields (88–95%) were obtained. Radiochemical purity of the isolated 211 At was assessed by radio-HPLC. Concentrations of Bi and Te contaminants in the 211 At and the astatinated antibodies were evaluated using ICP-MS.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Paperless Work Package Application

Paperless Work Package (PWP) System is a computer program process that takes information from Asset Suite, provides a platform for other electronic inputs, Processes the inputs into an electronic package that can be downloaded onto an electronic work tablet or laptop computer, provides a platform for electronic inputs into the work tablet, and then transposes those inputs back into Asset Suite and to permanent SRS records. The PWP System will basically eliminate paper requirements from the maintenance work control system. The program electronically relays the instructions given by the planner to work on a piece of equipment which is currently relayed via a printed work package. The program does not control/approve what is done. The planner will continue to plan the work package, the package will continue to be routed, approved, and scheduled. The supervisor reviews and approves the work to be performed and assigns work to individuals or to a work group. (The supervisor conducts pre job briefings with the workers involved in the job) The Operations Manager (Work Controlling Entity) approves the work package electronically for the work that will be done in his facility prior to work starting. The PWP System will provide the package in an electronic form. All the reviews, approvals, and safety measures taken by people outside the electronic package does not change from the paper driven work packages.

Kilgore, Jr., William R.↗