Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Empirical Estimates of Transmission Value using Locational Marginal Prices [Slides]

This study focuses on one potential benefit of transmission infrastructure—congestion relief. It explores historical grid conditions from 2012 through the first half of 2022, and evaluates the marginal value of transmission in facilitating trade within and across regional boundaries by calculating differences in observed nodal wholesale power prices. The study finds that wholesale power prices exhibit stark geographic differences that, in many cases, are stable over time. Many regional and interregional transmission links have significant potential economic value from reducing congestion and expanding opportunities for trade. In fact, many links have hourly average pricing differences in 2021 that exceeded $\$15$/MWh—equivalent to $130 million per year for a 1000 MW link. The value of transmission is correlated with overall energy prices and varies by region and year. Critically, extreme conditions and high-value periods play an outsized role in the value of transmission, with 50% of transmission’s congestion value coming from only 5% of hours. Transmission planners run the risk of understating the benefits of regional and interregional transmission if extreme conditions and high-value periods are not adequately considered. These periods are natural features of actual market operations. As such, the study highlights the need for planners to more-comprehensively assess the value of transmission under both normal and extreme conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Batteries Included: Top 10 Findings from Berkeley Lab Research on the Growth of Hybrid Power Plants in the United States

One of the most important electric power system trends of the 2010s was the rapid deployment of wind turbines and photovoltaic arrays, but a twist for the 2020s may be the rapid deployment of ‘hybrid’ generation resources. Hybrid power plants typically combine solar or wind (or other energy sources) with co-located storage. While hybridization helps to ease the challenge of balancing variable supply and demand, its relative novelty means that research is needed to facilitate integration and promote innovation. Combining the characteristics of multiple energy, storage, and conversion technologies poses complex questions for grid operations and economics. Project developers, system operators, planners, and regulators would benefit from better data, methods, and tools to estimate the costs, values, and system impacts of hybrid projects. This publication showcases some of Berkeley Lab’s robust research program intended to support private- and public-sector decision-making about hybrid plants in the United States. Our short briefing summarizes articles that we published between 2020 and 2022, links to the in-depth reports, and provides contact details for further engagement on the specific research topics: Growth: Developer interest in hybrid power plants is strong and growing Price vs. Value: PV+storage hybrids have low PPA prices and high value in some regions Market Drivers: Solar hybridization is driven by tax credits and other benefits Configuration Choices: Market prices have incentivized shorter duration batteries with PV Capacity Value: The capacity contribution of a hybrid is less than the sum of its parts Ancillary Services: AS markets are a valuable yet fleeting option for hybrids Market Participation: Hybrids can more flexibly engage with electricity markets Operations: The power system value of hybrids depends on how they are operated Distributed Hybrids: Growth of customer-sited PV+storage hybrids offers new opportunities Future Research: Where next? Priority areas for hybrid power research.

25 ENERGY STORAGE↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗