Engineering Papers⌕ Search

Engineering topics

Willenberg, H. J.

Publications and source records attributed to Willenberg, H. J..

Metrics for in-space telescope assembly techniques

Reliable metrics are not yet available for choosing among human and robotic assets for space-based construction and servicing of large space telescopes. Using FAIR-DART as a reference design, we generated example event sequences for telescope assembly scenarios in enough detail to identify infrastructure assumptions and technology requirements. A systems trade among human and robotic techniques (human EVA, on-site telerobotic, ground-in-the- loop robotic, commanded or sequenced robotic, and autonomous/decision-making robotic) helped us to define key metrics in the human-robotic trade space, including quality, time, cost, and risk. Our methodology included examining representative end-member scenarios. Case A treated each step in the assembly sequence as if all other steps have no on-site human involvement, and Case B treated each step as if human EVA is already involved in all other steps. With this trade, we identified key enabling technologies and infrastructure for space-based assembly and servicing of large space telescopes.

space telescopes human and robotic in-space assemb↗

Space Station - Implications for space manufacturing

Space-based materials processing R&D is examined. It is proposed that the Space Station's Microgravity and Materials Processing Facility will be utilized by academic, government, and commercial customers. Users requirements for materials processing in space are discussed. Consideration is given to the time allocation of the facility, charges to users, and the property rights of the users.

Tingey, D. L.↗

Applicability of 100kWe-class of space reactor power systems to NASA manned space station missions

An assessment is made of a manned space station operating with sufficiently high power demands to require a multihundred kilowatt range electrical power system. The nuclear reactor is a competitor for supplying this power level. Load levels were selected at 150kWe and 300kWe. Interactions among the reactor electrical power system, the manned space station, the space transportation system, and the mission were evaluated. The reactor shield and the conversion equipment were assumed to be in different positions with respect to the station; on board, tethered, and on a free flyer platform. Mission analyses showed that the free flyer concept resulted in unacceptable costs and technical problems. The tethered reactor providing power to an electrolyzer for regenerative fuel cells on the space station, results in a minimum weight shield and can be designed to release the reactor power section so that it moves to a high altitude orbit where the decay period is at least 300 years. Placing the reactor on the station, on a structural boom is an attractive design, but heavier than the long tethered reactor design because of the shield weight for manned activity near the reactor.

Silverman, S. W.↗