Engineering Papers⌕ Search

Engineering topics

Wienands, U

Publications and source records attributed to Wienands, U.

24 records · Page 2

IMPEDANCE CONSIDERATIONS FOR THE DESIGN OF THE VACUUM SYSTEM OF THE CERN PS2

In order for the LHC to reach an ultimate luminosity goal of 10{sup 35}/cm{sup 2}/s, CERN is considering upgrade options for the LHC injector chain, including a new 50 GeV synchrotron of about 1.3 km length for protons and heavy ions, to be called the PS2 [1]. The proton energy will be ramped from 4 GeV to 50 GeV in 1.2 s, and the design proton current for LHC operation is 2.7 A. In the LARP framework, we are studying the instability thresholds and the impedance requirements of the vacuum system for the PS2. Goal of this study is to develop an impedance budget for the machine. We consider the standard single and multi-bunch collective effects that may be an issue in the PS2. For single bunch, we study the microwave instability and the transverse mode coupling instability (TMCI); for multi-bunch, the transverse coupled bunch instability. While the impedance budget will include many components in the machine, at present, we only have sufficient information to include the resistance of the beam pipe, the vacuum flanges that connect the various pieces of the vacuum chamber, and space charge impedance in our estimate. Note that earlier estimates of the impedance and its effects in the PS2 can be found in Ref. [2]. Table 1 presents selected PS2 parameters that will be used in the calculations. The equations used, unless indicated otherwise, can be found in Ref. [3].

43 PARTICLE ACCELERATORS↗

Analysis of the Wakefield Effects in the PEP-II SLAC B-FACTORY

We present the history and analysis of different wake field effects throughout the operational life of the PEP-II SLAC B-factory. Although the impedance of the high and low energy rings is small, the intense high current beams generated a lot of power. The effects from these wake fields are: heating and damage of vacuum beam chamber elements like RF seals, vacuum valves , shielded bellows, BPM buttons and ceramic tiles; vacuum spikes, vacuum instabilities and high detector background; beam longitudinal and transverse instabilities. We also discuss the methods used to eliminate these effects. Results of this analysis and the PEP-II experience may be very useful in the design of new storage rings and light sources.

43 PARTICLE ACCELERATORS↗

Reliability of Operation at SLAC in the LCLS Era

LCLS hardware availability has been above 90% for the first two commissioning runs of the accelerator. In this paper we compare the reliability data for LCLS (availability, MTBF and MTTR) to those of PEP-II, the e{sup +}e{sup -} collider operating previously at SLAC. It may be seen that the linac availability is not significantly different now than it was before, while the availability of the whole LCLS facility is significantly higher than that of the PEP-II facility as a whole (which was about 87%). Most of the improvement is in the MTTR. Ways to improve availability towards the goal of 95% are discussed.

43 PARTICLE ACCELERATORS↗

High-Current Effects in The PEP-II Storage Rings

High beam currents in PEP-II have been a challenge for vacuum system and ring components. For the {approx} 1 cm long bunches peak currents exceed 100 A and modest impedance can give rise to voltage spikes and discharges. During the last two runs, difficulties arose from rf seals at the 'flex flanges' in the HER. High temperatures were seen and the seals turned out to be severely damaged by discharges. In the LER, the horizontal stripline kickers of the bunch-by-bunch feedback system experiences breakdown at high bunch current-Macor pins installed for mechanical stability turned out to be a weak spot causing discharges. Finally, in the HER an experiment to shorten the ion-clearing gap in the beam revealed signs of ion-induced instability indicating that the HER has been operating quite close to the stability limit. The effects shown here are relevant to future high-intensity electron and positron rings like SuperB and PEP-X.

43 PARTICLE ACCELERATORS↗

Further Progress on a Design for a Super-B Interaction Region

We present an improved design for a SuperB interaction region. The new design minimizes local bending of the two colliding beams by separating all beam magnetic elements near the Interaction Point (IP). The total crossing angle at the IP is increased from 48 mrad to 60 mrad. The first magnetic element is a six slice Permanent Magnet (PM) quadrupole with an elliptical aperture allowing us to increase the vertical space for the beam. This magnet starts 36 cm from the Interaction Point (IP). This magnet is only seen by the Low-Energy Beam (LEB), the High-Energy Beam (HEB) has a drift space at this location. This allows the preliminary focusing of the LEB which has a smaller beta y* at the IP than the HEB. The rest of the final focusing for both beams is achieved by two super-conducting side-by-side quadrupoles (QD0 and QF1). These sets of magnets are enclosed in a warm bore cryostat located behind the PM quadrupole for the LEB. We describe this design for the interaction region.

43 PARTICLE ACCELERATORS↗

Changing the PEP-II Center-of-Mass Energy Down to 10 GeV and up to 11 GeV

PEP-II, the SLAC, LBNL, LLNL B-Factory was designed and optimized to run at the Upsilon 4S resonance (10.580 GeV with an 8.973 GeV e- beam and a 3.119 GeV e+ beam). The interaction region (IR) used permanent magnet dipoles to bring the beams into a head-on collision. The first focusing element for both beams was also a permanent magnet. The IR geometry, masking, beam orbits and beam pipe apertures were designed for 4S running. Even though PEP-II was optimized for the 4S, we successfully changed the center-of-mass energy (E{sub cm}) down to the Upsilon 2S resonance and completed an E{sub cm} scan from the 4S resonance up to 11.2 GeV. The luminosity throughout most of these changes remained near 1 x 10{sup 34} cm{sup -2}s{sup -1}. The E{sub cm} was changed by moving the energy of the high-energy beam (HEB). The beam energy differed by more than 20% which produced significantly different running conditions for the RF system. The energy loss per turn changed 2.5 times over this range. We describe how the beam energy was changed and discuss some of the consequences for the beam orbit in the interaction region. We also describe some of the RF issues that arose and how we solved them as the high-current HEB energy changed.

43 PARTICLE ACCELERATORS↗