Workflow for Developing and Operating Subsurface Hydrogen Storage Facilities in Porous Reservoirs
Long-duration (seasonal) storage of natural gas (NG), which primarily consists of methane (CH 4 ), has been practiced for more than a hundred years at underground gas storage (UGS) facilities that use depleted hydrocarbon reservoirs, saline aquifers, and salt caverns. To enable hydrogen (H 2 ) to be used as a long-duration, energy-storage medium, similar facilities are envisioned for underground H 2 storage (UHS) of either H 2 or H 2 /NG mixtures. Experience with UGS can be used to guide recommended practices for developing and operating UHS facilities in porous reservoirs. The most important factors (formation/fluid properties and engineering choices) that influence the performance of UHS reservoirs have been identified and quantified in previous studies. These factors and choices influence phenomena that determine the sweep efficiency of the stored working gas. These phenomena include viscous fingering, hysteretic capillary trapping, and gravity override of the working gas, as well as the upconing of nonproductive fluid that determine the sweep efficiency of the stored working gas. This report describes initial recommended-practices and a project-development workflow for UHS facilities that utilize porous reservoirs, based on the current state-of-knowledge about H 2 behavior in the subsurface. The workflow sequentially addresses all aspects of UHS project development, including the identification of H 2 sources and users, site ranking and down-selection, geologic and reservoir-engineering characterization, reservoir design, testing, risk management, commissioning, operations, and monitoring for a UHS facility. The goal is to enable UHS facilities to be developed in an efficient and timely manner, while carefully managing project risks. This workflow is similar to that which has been developed for UGS facilities (see Figure 1 of API, 2022), with the addition of tasks and subtasks specific to H 2 and UHS. The project-development workflow is broken down into three major stages: (1) define the H 2 use case; (2) rank, down-select, and characterize potential, candidate UHS sites; and (3) reservoir design, integrity testing, risk assessment, commissioning, operations, and monitoring for selected UHS sites. Each major stage is further broken down into tasks and subtasks, which are described at a high level. This report also provides more detailed descriptions of all tasks and subtasks that involve reservoir analysis and testing.