Engineering Papers⌕ Search

Engineering topics

West, W. R.

Publications and source records attributed to West, W. R..

Annual Radioactive Waste Tank Inspection Program - 2011

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2011 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2011 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2011-00026, HLW Tank Farm Inspection Plan for 2011, were completed. Ultrasonic measurements (UT) performed in 2011 met the requirements of C-ESR-G-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 25, 26 and 34 and the findings are documented in SRNL-STI-2011-00495, Tank Inspection NDE Results for Fiscal Year 2011, Waste Tanks 25, 26, 34 and 41. A total of 5813 photographs were made and 835 visual and video inspections were performed during 2011. A potential leaksite was discovered at Tank 4 during routine annual inspections performed in 2011. The new crack, which is above the allowable fill level, resulted in no release to the environment or tank annulus. The location of the crack is documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.6.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternate propellant program, phase 1

Candidate propellant systems for the shuttle booster solid rocket motor (SRM), which would eliminate, or greatly reduce, the amount of HCl produced in the exhaust of the shuttle SRM were investigated. Ammonium nitrate was selected for consideration as the main oxidizer, with ammonium perchlorate and the nitramine, cyclo-tetramethylene-tetranitramine as secondary oxidizers. The amount of ammonium perchlorate used was limited to an amount which would produce an exhaust containing no more than 3% HCl.

Anderson, F. A.↗