Engineering Papers⌕ Search

Engineering topics

Weiss, D.

Publications and source records attributed to Weiss, D..

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Progress of the laser ion source upgrade (LION2) for RHIC and NSRL program at Brookhaven National Laboratory

At Brookhaven National Laboratory (BNL), the LION2 ion source is being constructed to replace an existing laser ion ablation ion source (LIS) at the EBIS facility, which provides heavy ion beams of multiple ion species for the operation of NASA Space Radiation Laboratory (NSRL) and Relativistic Heavy Ion Collider (RHIC). The LION1 ion source currently provides singly charged ions of Li, B, C, O, Al, Si, Ca, Ti, Fe, Cu, Zr, Nb, Ag, Tb, Ta, W, Au, Bi, and Th with a rapid-species-change capability. An electron beam ion source, Extended-EBIS captures, confines, and ionizes the ions to high charge state, suitable for injection and acceleration by an RFQ accelerator. Typically, single pulses of the LIS ion species for NSRL are changed sequentially during Galactic Cosmic Ray experiments, while multiple pulses of a given ion beam are provided quasi-simultaneously for RHIC. LION2 will have the same capability of the rapid-species-change with improved beam performance and reliability. LION2 is being constructed in a remote assembly location and is expected to finish in December 2023. The removal of LION1 and installation of LION2 is planned during the December 2023 or summer 2024 shutdown.

43 PARTICLE ACCELERATORS↗

High Power Test Results For A Cylindrical-Shell SiC Higher-Order-Mode DAMPER

The next high-current Electron Ion Collider (EIC) is a new accelerator to be built at Brookhaven National Laboratory (BNL) in collaboration with Thomas Jefferson National Accelerator Facility (TJNAF). In the EIC Electron Storage Ring (ESR), there will be beam currents up to 2.5 A, which will excite massive Higher-Order-Modes (HOM) power in the 17 single-cell 591 MHz Superconducting Radio Frequency (SRF) cavities. To damp the HOM power in the ESR SRF cavities is a challenge. A room temperature cylindrical shell shape Silicon Carbide (SiC) Beamline HOM Absorber (BLA) was chosen as the baseline design, due to its broadband and high-power capability, and previous demonstrations at other accelerator facilities, albeit at much lower power. Because the EIC BLA HOM power dissipation is significantly greater than the previous applications, it is imperative to carry out high power testing to determine the maximum device performance levels achievable for thermal transport, RF breakdown, and mechanical stress, prior to finalizing the design. A SiC HOM absorber with state-of-the-art geometry size was prototyped to verify shrink-fit technique, test outgassing rate, and high power handling capability. This paper presents the HOM damper’s prototyping and test results.

43 PARTICLE ACCELERATORS↗

Strength mechanisms and tunability in Al-Ce-Mg ternary alloys enabled by additive manufacturing

Al-Ce-based alloys are promising candidates for additive manufacturing (AM) due to their hot-cracking resistance and because they do not require heat treatment to obtain precipitation strengthening. Rapid solidification rates enabled by AM methods can lead to enhanced mechanical properties; however, the strengthening mechanisms over large composition ranges were unclear. Here, combinatorial synthesis by directed-energy deposition (DED) and hardness measurements were used to rapidly map the composition-dependent strength of the ternary Al-Ce-Mg system. Tensile testing and microstructure characterization of selected compositions were performed to elucidate the compositional dependence of the strengthening mechanisms. Al 11 Ce 3 precipitates were present in all cases, and the maximum hardness (1.25 GPa) was measured for the Al-8Ce-10Mg composition. A combination of (i) Hall-Petch strengthening, based on the FCC-matrix-phase cell size; (ii) particle strengthening, based on Al 11 Ce 3 volume fraction and size; and (iii) solid-solution strengthening, based on Mg composition of the matrix phase, were used to account for the measured strengths. Vickers hardness is shown to correlate well with ultimate tensile strength in these alloys, highlighting the value of surface-based techniques for rapid screening.

36 MATERIALS SCIENCE↗

Electron-Ion Collider Design Status

The Electron-Ion Collider (EIC) is being designed for construction at Brookhaven National Laboratory. Activities have been focused on beam-beam simulations, polarization studies, and beam dynamics, as well as on maturing the layout and lattice design of the constituent accelerators and the interaction region. The latest design advances will be presented.

43 PARTICLE ACCELERATORS↗

OPTICS FOR STRONG HADRON COOLING IN EIC HSR-I

Insertion Region 2 (IR2) of the Relativistic Heavy Ion Collider will be modified to accommodate a Strong Hadron Cooling facility in the Hadron Storage Ring (HSR) of the Electron-Ion Collider (EIC). This paper describes the current proof-of-principle design of HSR-IR2 - layout, optical performance, design methodology, and engineering requirements. It also describes the challenges and opportunities in the future development of the HSR-IR2 design, in order to further optimize Strong Hadron Cooling performance.

Peggs, S.↗

Thermal analysis of RHIC arc dipole magnet cold mass with EIC beam screen

The existing RHIC storage rings – including their superconducting magnet arcs – will be used for the hadron storage ring of the Electron-Ion Collider (EIC). The vacuum chamber of these magnets was not designed for the EIC hadron beams, with shorter bunches and of higher average current than the RHIC beams. With the current stainless steel beam pipe, the resistive-wall (RW) heating will exceed the dynamic heat load budget. Limiting the RW heating is important to prevent the superconducting magnets from quenching and to maintain a low screen temperature necessary to impede the rise of RW heating (higher resistance at higher temperature) as well as to achieve desired ultra-high vacuum. In addition, simulations predict the formation of electron cloud which would further contribute to the dynamic heat load and could compromise the quality and stability of the beam. To reduce the resistive-wall heating and suppress electron cloud, a beam screen will be installed in the vacuum chamber of the RHIC SC magnets. The screen will have a high RRR copper layer at its inner face – useful to reduce the resistive-wall impedance thanks to its high conductivity especially at cryogenic temperatures – and will be coated with a thin layer of amorphous carbon, a material with low secondary electron yield to suppress the formation of electron clouds. The baseline solution envisages a screen that will be cooled by thermal contact to the 4.55 K beam pipe. Detailed thermal analysis have been conducted in ANSYS 2020 for an arc dipole cold mass equipped with a beam screen in order to study the feasibility of a passively-cooled screen and guide its design. Temperature-dependent thermal conductivity properties of all materials in the operating (cryogenic) temperature range are considered. Suitable assumptions and simplifications are made to model the magnet coil and calculate its homogenized thermal conductivity. Sensitivity studies with respect to layer thicknesses and area of contact are carried out and results are presented.

43 PARTICLE ACCELERATORS↗