This project targeted advanced low NOx combustion for advanced gas turbines capable of 65%, or greater, efficiency in combined cycle application. This technology advancement has further potential to benefit gas turbines used in coal based IGCC applications with pre-combustion carbon capture and hydrogen as the resulting fuel. The program developed and synthesized the most advanced combustion system capable of achieving low NOX emissions up to turbine inlet temperatures of 3100F while also supporting the load-following needs of a modern grid. The combustion system contributes to the overall gas turbine efficiency goal by setting the maximum cycle temperature achievable for a given NOX level and by minimizing the through-combustor air flow pressure drop. Focus areas for this project targeted maximizing the turbine inlet temperature entitlement, as constrained by emissions considerations. The design also minimized parasitic air flow pressure drop by using advanced cooling techniques and performance materials selections and by minimizing hot surface area. These two technology objectives (maximum, emissions-compliant cycle temperature and minimum air flow pressure drop) were integrated into a prototype design. The primarily analytical project sought to identify the most promising technologies to meet these objectives. Additional critical “jugular” data were obtained from multi-tube mixer tests to realize the potential of leveraging “micro flames” for minimizing overall hot surface area. This data was used, in conjunction with an understanding of advanced material and cooling design technologies, to analytically develop multiple design concepts. Phase I focused on in-depth engineering analysis and design, with minimal supporting laboratory testing to enable a selection of the top three combustion architectures for achieving these overall objectives. Phase II of the program developed the selected design through a combination of sub-scale testing and analytical efforts. Early tests included a cold-flow cascade to establish aerodynamic performance characteristics and a sub-scale fired test at GE Global Research in Niskayuna, NY, to establish cooling and heat transfer characteristics in conjunction with combustion performance. The data from these tests validated the analytical models to ultimately design a full-scale, test article to evaluate at prototypical pressure and temperature conditions at GE Gas Power’s Gas Turbine Technology Laboratory in Greenville, SC. GE Gas Power also developed, tested, and recommended a suitable seal design to be applied to the unique features of the combustor. To assess the technology challenges from prospective future production of the combustor from a ceramic matrix composite material, screening tests of Environmental Barrier Coatings were completed.
20 FOSSIL-FUELED POWER PLANTS↗