Effect of GPS Manipulation to Traditional and Next Generation Relay Protection (Final Report)

This project’s objective is to test the effect of GPS timing variations on relay protection algorithms to determine vulnerabilities and the associated hazards to the electric grid. This will focus on time domain protection which utilizes traveling waves measured on the transmission lines to detect the fault within a tower span. This requires the use of GPS to sync the two substations and can be vulnerable to GPS manipulation. However, the effects of GPS manipulation are not a commonly known risk. Therefore, this LDRD will address the risks of GPS manipulation for on a new protective relay technology that has the potential to change protective relaying. For time domain protection a GPS resilient architecture was implemented and tested for time domain protective relays through a direct serial fiber connection between the two relays. This allows for one relay to be the master and provide synchronization outside of timestamp for traveling wave protection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SRNL EPC Installation Report

During the week of August 25th, 2021, three Electric Phenomenon Cluster (EPC) sensors were installed at the Savannah River Site (SRS) owned, Dominion Energy (DE) operated 504-2G substation.

47 OTHER INSTRUMENTATION↗

Fork Union EPC Installation Observation Report

On June 22nd and 23rd, a representative from Savannah River National Lab (SRNL) traveled to the Fork Union substation in Fork Union, Virginia (owned and operated by Dominion Energy) to observe the installation, calibration, and commissioning of three Electric Phenomena Cluster (EPC) sensors. The installation in its entirety included the physical securing of the EPC sensors by Dominion Energy, fiber optic cable (furnished by SmartSenseComm) being run in conduits and cable trays from the EPC sensor to the Optical Processing Unit (OPU) located in the substation switch house. The location of the EPC sensors, OPU, and cable routing can be seen in the figures included.

47 OTHER INSTRUMENTATION↗

Integration of Next Generation Critical Infrastructure Sensor Technologies

This project is focused on advancing current protective relaying and control through verifying next generation timing systems and sensors with current commercial off the shelf protective relays. This will further research in the field of advanced grid modernization and demonstrate interoperability between nextgeneration protective relays and voltage and current sensors. These commercial off the shelf (COTS) technologies were tested and integrated with next generation sensor technologies, with the results documented below.

47 OTHER INSTRUMENTATION↗