Engineering Papers⌕ Search

Engineering topics

Warner, Cody

Publications and source records attributed to Warner, Cody.

Utility-Scale Solar, 2023 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2023 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Highlights of this year’s update include: -10.4 GWAC of new utility-scale PV capacity came online in 2022, bringing cumulative installed capacity to more than 61.7 GWAC across 46 states. -94% of all new utility-scale PV capacity added in 2022 uses single-axis tracking. -Median installed project costs declined to $\$1.32$/WAC (or $\$1.07$/WDC) in 2022. -Plant-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$39$/MWh in 2022 ($\$29$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20-30$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. -In 2022, solar’s average market value (defined in the report to include only energy and capacity value) rose by 40% to $\$71$/MWh and exceeded average wholesale prices in 4 of the 7 ISOs/RTOs and 11 of 18 other balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from ~100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -the end of 2022, there were at least 947 GW of utility-scale solar power capacity within the interconnection queues across the nation, 456 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2023 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Berkeley Labs "Utility-Scale Solar", 2023 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2022, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

analysis↗

Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

2022↗

Utility-Scale Solar, 2022 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2022 Edition” provides an overview of key trends in the U.S. market, with a focus on 2021. Highlights of this year’s update include: -A record of nearly 12.5 GWAC of new utility-scale PV capacity came online in 2021, bringing cumulative installed capacity to more than 51.3 GWAC across 44 states. -90% of all new utility-scale PV capacity added in 2021 uses single-axis tracking. -Median installed project costs declined to $\$1.35$/WAC (or $\$1.02$/WDC) in 2021. -Project-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$33$/MWh in 2021 ($\$27$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. In 2021, solar’s average market value (defined in the report to include only energy and capacity value) rose by 55% to $\$47$/MWh and exceeded average wholesale prices in 13 of the 17 balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from 67 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -At the end of 2021, there were at least 674 GW of utility-scale solar power capacity within the interconnection queues across the nation, 284 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2022 Edition [Slides]

Falling battery prices and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data mined from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and full hybrids that feature co-location and co-control. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2021, there were nearly 300 hybrid plants (>1 MW) operating across the United States, totaling nearly 36 gigawatts (GW) of generating capacity and 3.2 GW/8.1 GWh of energy storage. PV+storage plants are by far the most common, dominating in terms of plant number (140), storage capacity (2.2 GW/7.0 GWh), storage:generator ratio (53%), and storage duration (3.2 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was a breakout year for PV+storage hybrids in particular: 67 of the 74 hybrids added in 2021 were PV+storage. By the end of 2021, there were more GW of battery capacity installed in PV+storage hybrids (2.2 GW) than as standalone storage plants (1.8 GW). The difference is even starker in energy terms, with PV+storage plants hosting twice as much battery capacity as standalone storage plants (7 GWh vs. 3.5 GWh, respectively). Much of the battery capacity added in hybrid form in 2021 was a battery retrofit to a pre-existing PV plant. -Data on plants under development from the interconnection queues of all seven ISOs/RTOs plus 35 individual utilities suggest that these hybridization trends are likely to continue. At the close of 2021, there were more than 670 GW of solar plants in the nation’s queues; 285 GW (~42%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage (PV+storage represented nearly 90% of all hybrid capacity in the queues). For wind, 247 GW of capacity sat in the queues, with 19 GW (~8%) proposed as a hybrid, again most-often pairing wind with storage (wind+storage represented ~4% of all hybrid capacity in the queues). Meanwhile, nearly half of all storage in the queues is estimated to be part of a hybrid plant. While many of these proposed plants will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Batteries Included: Top 10 Findings from Berkeley Lab Research on the Growth of Hybrid Power Plants in the United States

One of the most important electric power system trends of the 2010s was the rapid deployment of wind turbines and photovoltaic arrays, but a twist for the 2020s may be the rapid deployment of ‘hybrid’ generation resources. Hybrid power plants typically combine solar or wind (or other energy sources) with co-located storage. While hybridization helps to ease the challenge of balancing variable supply and demand, its relative novelty means that research is needed to facilitate integration and promote innovation. Combining the characteristics of multiple energy, storage, and conversion technologies poses complex questions for grid operations and economics. Project developers, system operators, planners, and regulators would benefit from better data, methods, and tools to estimate the costs, values, and system impacts of hybrid projects. This publication showcases some of Berkeley Lab’s robust research program intended to support private- and public-sector decision-making about hybrid plants in the United States. Our short briefing summarizes articles that we published between 2020 and 2022, links to the in-depth reports, and provides contact details for further engagement on the specific research topics: Growth: Developer interest in hybrid power plants is strong and growing Price vs. Value: PV+storage hybrids have low PPA prices and high value in some regions Market Drivers: Solar hybridization is driven by tax credits and other benefits Configuration Choices: Market prices have incentivized shorter duration batteries with PV Capacity Value: The capacity contribution of a hybrid is less than the sum of its parts Ancillary Services: AS markets are a valuable yet fleeting option for hybrids Market Participation: Hybrids can more flexibly engage with electricity markets Operations: The power system value of hybrids depends on how they are operated Distributed Hybrids: Growth of customer-sited PV+storage hybrids offers new opportunities Future Research: Where next? Priority areas for hybrid power research.

25 ENERGY STORAGE↗

Solar-to-Grid: Trends in System Impacts, Reliability, and Market Value in the United States with Data Through 2020

With continued deployment of solar across the United States, assessing the interactions of solar with the power system is an increasingly important complement to studies tracking the cost and performance of solar plants. This project focuses on the historical contribution to reliability, trends in market value, and impacts on the bulk power system of solar deployed in the U.S. through the end of 2020. The scope of this analysis includes the seven organized U.S. wholesale power markets and is based on historical hourly solar generation profiles for each individual plant larger than 1 MW or county-level aggregate profiles for smaller solar. In addition, we present a limited set of results for ten utilities that are outside of the independent system operator (ISO)/regional transmission organization (RTO) markets.

14 SOLAR ENERGY↗

Influence of Business Models on PV-Battery Dispatch Decisions and Market Value

PV-battery hybrid projects dominate interconnection queues in some regions in the United States, but few projects have been operational long enough to assess how the hybrid capabilities may be used in practice. We interview plant operators and analyze empirical dispatch data for eleven large-scale PV-battery hybrids in three organized wholesale markets in the United States. We use the dispatch data and wholesale market prices to estimate the market value of our sample hybrids in 2020. The empirical increase in market value of a PV-battery hybrid relative to a standalone PV plant varies by project and ranges from $\$$1 to $\$$48/MWhsolar. The premium is driven by market, location, technical characteristics of the PV and battery asset, and battery dispatch strategies. In contrast to the widespread assumptions in the PV-battery hybrid modeling literature, only three of the eleven project operators optimize battery usage for wholesale market revenue as merchant plants. Instead, the majority of operators in the sample have alternate objectives. For example, load-serving entities target peak load reductions, incentive program participants focus on compliance with program requirements, and large energy consumers prioritize resiliency and utility bill minimization. Understanding prevalent dispatch signals and the degree of alignment with system-wide grid needs can increase the market value of PV-battery hybrids.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2021 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2021 Edition” provides an overview of key trends in the U.S. market, with a focus on 2020. Highlights of this year’s update include: A record of nearly 9.6 GWAC of new utility-scale PV capacity came online in 2020, bringing cumulative installed capacity to more than 38.7 GWAC across 43 states. 89% of all new utility-scale PV capacity added in 2020 uses single-axis tracking. Median installed project costs declined to $\$$1.4/WAC (or $\$$1.1/WDC) in 2020. Project-level capacity factors vary widely, from 9% to 36% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. Utility-scale PV’s LCOE fell to $\$$34/MWh in 2020 ($\$$28/MWh if factoring in the federal investment tax credit, or ITC). PPA prices have largely followed the decline in solar’s LCOE over time, but have stagnated more recently. Prices from a sample of recent contracts average just above $\$$20/MWh (levelized). In 2020, solar’s average market value (defined in the report to include only energy and capacity value) exceeded average wholesale prices in 12 of the 17 balancing authorities analyzed (including 4 of the 7 independent system operators across the United States). Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata for more than 150 PV+battery hybrid projects that are already online or that have secured offtake arrangements. At the end of 2020, there were at least 460 GW of utility-scale solar power capacity within the interconnection queues across the nation, 160 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2021 Edition

Berkeley Labs "Utility-Scale Solar", 2021 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2020, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

2021↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗