Engineering Papers⌕ Search

Engineering topics

Wang, Haipeng

Publications and source records attributed to Wang, Haipeng.

At least 73 records · Page 4

A New Cavity Design For Medium Beta Acceleration

Heavy duty or cw, superconducting proton and heavy ion accelerators are being proposed and constructed worldwide. The total length of the machine is one of the main drivers in terms of cost. Thus hwr and spoke cavities at medium beta are usually optimized to achieve low surface field and high gradient. A novel accelerating structure at beta=0.5 evolved from spoke cavity is proposed, with lower surface fields but slightly higher heat load. It would be an interesting option for pulsed and cw accelerators with beam energy of more than 200mev/u.

43 PARTICLE ACCELERATORS↗

CEBAF Upgrade: Cryomodule Performance And Lessons Learned

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

43 PARTICLE ACCELERATORS↗

Damping of unwanted modes in SRF deflecting/crabbing cavities

As deflecting and crab cavities do not use the fundamental acceleration mode for their operation, the spectrum of unwanted modes is significantly different from that of accelerating cavities. The fundamental acceleration mode is now unwanted and can cause energy spread in the beam; in addition this mode frequency is often close to or lower than that of the deflecting mode, making it difficult to damp. This is made more complex in some of the compact crab cavities as there small beampipes often attenuate the fields very sharply. In addition in some crab cavities there can be an orthogonal transverse mode similar to the deflecting mode, known as the same order mode. The degeneracy of these modes must be split by polarising the cavity and if the polarisation is not large enough, dampers should be placed at either an electric or magnetic field null of the crabbing mode to effectively damp the unwanted polarisation. Various concepts for dealing with unwanted modes in various SRF deflecting cavities will be reviewed.

43 PARTICLE ACCELERATORS↗

An Efficient RF Source for Jlab

We propose the development of a highly reliable high efficiency RF source for JLAB with a lower lifetime cost operating at 80% efficiency with system operating costs of about 0.7M$/year for the 6 GeV machine. The design of the RF source will be based upon two injection locked magnetrons in a novel combining architecture for amplitude modulation and a cross field amplifier (CFA) as an output tube for the 12 GeV upgrade. A cost analysis including efficiency and reliability will be performed to determine the optimum system architecture. Several different system architectures will be designed and evaluated for a dual injection locked magnetron source using novel combining techniques and possibly a CFA as the output tube. A paper design for the 1497 MHz magnetron system will be completed. The optimum system architecture with all relevant specifications will be completed so that a prototype can be built.

43 PARTICLE ACCELERATORS↗

Mechanical Design of a New Injector Cryomodule 2-Cell Cavity at CEBAF

As a part of Jefferson Lab’s 12 GeV upgrade, a new injector superconducting RF cryomodule is required. This unit consists of a 2-cell and 7-cell cavity, with the latter being refurbished from an existing cavity. The new 2-cell cavity requires electromagnetic design and optimization followed by mechanical design analyses. The electromagnetic design is reported elsewhere. This paper aims to present the procedures and conclusions of the analyses on cavity tuning sensitivity, pressure sensitivity, upset condition pressure induced stresses, and structural vibration frequencies. The purposes of such analyses include: 1) provide reference data for cavity tuner design; 2) examine the structural integrity of the cavity; and 3) evaluate the 2-cell cavity’s resistance to microphonics. Design issues such as the location of stiffening rings, effect of tuner stiffness on cavity stress, choice of cavity wall thickness, etc. are investigated by conducting extensive finite element analyses. Progress in fabrication of the 2-cell cavity is also reported.

43 PARTICLE ACCELERATORS↗

Fabrication and Testing of Deflecting Cavities for APS

Jefferson Lab (Newport News, Virginia) in collaboration with Argonne National Laboratory (Argonne, IL) has fabricated and tested four first article, 2.8 GHz, deflecting SRF cavities, for Argonne's Short-Pulse X-ray (SPX) project. These cavities are unique in many ways including the fabrication techniques in which the cavity cell and waveguides were fabricated. These cavity subcomponents were milled from bulk large grain niobium ingot material directly from 3D CAD files. No forming of sub components was used with the exception of the beam-pipes. The challenging cavity and helium vessel design and fabrication results from the stringent RF performance requirements required by the project and operation in the APS ring. Production challenges and fabrication techniques as well as testing results will be discussed in this paper.

Mammosser, John↗

RF Design Optimization for New Injector Cryounit at CEBAF

A new injector superconducting RF (SRF) cryounit with one new 2-cell, B=0.6 cavity plus one refurbished 7-cell, B=0.97, C100 style cavity has been re-designed and optimized for the engineering compatibility of existing module for CEBAF operation. The optimization of 2-cell cavity shape for longitudinal beam dynamic of acceleration from 200keV to 533keV and the minimization of transverse kick due to the waveguide couplers to less than 1 mrad have been considered. Operating at 1497MHz, two cavities has been designed into a same footprint of CEBAF original quarter cryomodule to deliver an injection beam energy of 5MeV in less than 0.27{degree} rms bunch length and a maximum energy spread of 5keV.

43 PARTICLE ACCELERATORS↗

Source and Extraction for Simultaneous Four-hall Beam Delivery System at CEBAF

A new design for simultaneous delivery of the electron beam to all four 12 GeV CEBAF experimental halls* requires a new 750 MHz RF separator system in the 5th pass extraction region, a 250 MHz repetition rate for its beams, and addition of a fourth laser at the photo-cathode gun. The proposed system works in tandem with the existing 500 MHz RF separators and beam repetition rate on the lower passes. The new 5th pass RF separators will have the same basic design but modified to run at 750 MHz. The change to the beam repetition rate will be at the photo-cathode gun through an innovative upgrade of the seed laser driver system using electro-optic modulators. The new laser system also allows addition of the fourth laser. The new RF separators, the new laser system and other hardware changes required to implement the Four-Hall operation delivery system will be discussed in this paper.

43 PARTICLE ACCELERATORS↗

Rf System Requirements for JLab’s MEIC Collider Ring

The Medium-energy Electron Ion Collider (MEIC), proposed by Jefferson Lab, consists of a series of accelerators. At the top energy are the electron and ion collider rings. For the ion ring, it accelerates five long ion bunches to colliding energy and rebunches ions into a train of very short bunches before colliding. A set of low frequency RF system is needed for the long ion bunch energy ramping. Another set of high frequency RF cavities is needed to rebunch ions. For the electron ring, superconducting RF (SRF) cavities are needed to compensate the synchrotron radiation energy loss. The impedance of the SRF cavities must be low enough to keep the high current electron beam stable. The preliminary design requirements of these RF cavities are presented.

43 PARTICLE ACCELERATORS↗

Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the project is a doubling of the available beam energy of CEBAF from 6 GeV to 12 GeV. This increase in beam energy will be due primarily to the construction and installation of ten "C100" cryomodules in the CEBAF linacs. The C100 cryomodules are designed to deliver an average 108 MV each from a string of eight seven-cell, electropolished superconducting RF cavities operating at an average accelerating gradient of 19.2 MV/m. The new cryomodules fit in the same available linac space as the original CEBAF 20 MV cryomodules. Cryomodule production started in September 2010. Initial acceptance testing started in June 2011. The first two C100 cryomodules were installed and tested from August 2011 through October 2011, and successfully operated during the last period of the CEBAF 6 GeV era, which ended in May 2012. This paper will present the results of acceptance testing and commissioning of the C100 style cryomodules to date.

43 PARTICLE ACCELERATORS↗

MULTIPACTORING OBSERVATION, SIMULATION AND SUPPRESSION ON A SUPERCONDUCTING TE011 CAVITY

A superconducting cavity of the same shape as used for the development of superconducting photo injectors has been built for the studies of high magnetic field induced Q slope due to the local heating. The multipactoring (MP) problem has been observed on the TE011 mode, 3.29GHz with magnetic field barriers. To understand and overcome this problem, 3D multipactoring simulations by Omega3P and Track3P have been done and found these to be one-point multipactors pulled out from the flat bottom surface by finite normal component of electric field. Asymmetric coupling ports on the side of the beam tube could have caused the distortion of the TE011 mode. The thermometry measurement later confirmed the predicted impact locations. A structure modification has been adopted based on the simulation prediction. Later experimental results with the new geometry indicated softer MP barriers and further simulations indicated that the field perturbation created by the input antenna has also contributed this problem.

43 PARTICLE ACCELERATORS↗

Summary Report for the C50 Cryomodule Project

The Thomas Jefferson National Accelerator Facility has recently completed the C50 cryomodule refurbishment project. The goal of this project was to enable robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project included removal, refurbishment and reinstallation of ten CEBAF cryomodules at a rate of three per year. The refurbishment process included reprocessing of SRF cavities to eliminate field emission and to increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New 'dogleg' couplers were installed between the cavity and helium vessel flanges to intercept secondary electrons that produce arcing in the fundamental Power Coupler (FPC). Other changes included new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Damaged or worn components were replaced as well. All ten of the refurbished cryomodules are now installed in CEBAF and are currently operational. This paper will summarize the performance of the cryomodules.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

COMMISSIONING OF THE SRF SURFACE IMPEDANCE CHARACTERIZATION SYSTEM AT JEFFERSON LAB

Superconducting radio frequency (SRF) technology is widely adopted in particle accelerators. There remain many open questions, however, in developing a systematic understanding of the fundamental behavior of SRF materials, including niobium treated in different ways and various other bulk/thin film materials that are fabricated with different methods under assorted conditions. A facility that can measure the SRF properties of small samples in a range of 0~180 mT surface field and 2~20 K temperature is needed in order to fully answer these questions. The Jefferson Lab surface impedance characterization (SIC) system [1] has been designed to attempt to meet this requirement. It consists of a sapphire-loaded cylindrical Nb TE011 cavity at 7.5 GHz with a 50 mm diameter flat sample placed on a non-contacting end plate and uses a calorimetric technique [2-5] to measure the rf induced heat on the sample. Driving the resonance to a known field on this surface enables one to derive the surface resistance of the small localized area. TE011 mode identification has been done at room temperature and 4 K, and has been compared with Microwave Studio® simulation results. The variable input and transmitted rf couplers have been characterized. Rf loss mechanisms in the SIC system are under investigation. Thermal properties of the calorimeter have been well studied. A second generation calorimeter is being developed to optimize the dynamic range of the system. A prototype VCO phase lock loop system has been used in CW mode. Preliminary tests with bulk Nb samples have been done at <3 mT magnetic field. The presently available hardware is expected to enable up to 20 mT peak magnetic field on the sample, and paths to higher field tests have been identified.

Xiao, Binping↗

Critical dipole modes in JLAB upgrade cavities

The upgrade project of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Laboratory (JLab) is in progress. Eighty cavities will be installed in ten new superconducting RF (SRF) cavity cryomodules to double the maximum achievable beam energy from 6 GeV to 12 GeV. One major concern in CEBAFs recirculating machine is the potential of multipass, multibunch beam break-up (BBU) instabilities due to Higher Order Modes (HOMs) interacting with the beam in the accelerator pass and subsequent passes. Such an instability has been encountered end of 2007 due to an Upgrade prototype cavity in a then newly installed cryomodule. Insights into the underlying problems and their mitigation are presented in this paper including most recent results for in-house built Upgrade type cavities.

Marhauser, Frank↗

Novel Geometries for the LHC Crab Cavity

The planned luminosity upgrade to LHC is likely to necessitate a large crossing angle and a local crab crossing scheme. For this scheme crab cavities align bunches prior to collision. The scheme requires at least four such cavities, a pair on each beam line either side of the interaction point (IP). Upstream cavities initiate rotation and downstream cavities cancel rotation. Cancellation is usually done at a location where the optics has re-aligned the bunch. The beam line separation near the IP necessitates a more compact design than is possible with elliptical cavities such as those used at KEK. The reduction in size must be achieved without an increase in the operational frequency to maintain compatibility with the long bunch length of the LHC. This paper proposes a suitable superconducting variant of a four rod coaxial deflecting cavity (to be phased as a crab cavity), and presents analytical models and simulations of suitable designs.

43 PARTICLE ACCELERATORS↗

RF Surface Impedance Measurement of Polycrystalline and Large Grain Nb Disk Sample at 7.5 GHz

A Surface Impedance Characterization (SIC) system has been proposed at the 2005 SRF workshop and recently updated as detailed at the 2009 PAC conference. Currently the SIC system can measure samples in a temperature range from 2K to 20K exposed to an RF magnetic flux density of less than 3mT. We report on new results of a BCP etched large grain Nb sample measured with this system as compared with previous results of a BCP etched polycrystalline Nb sample. The design of an upgraded SIC system for use at higher magnetic flux densities is on the way to more efficiently investigate correlations between local material characteristics and associated SRF properties, both for preparation studies of bulk niobium and also new thin film SRF developments.

36 MATERIALS SCIENCE↗