Engineering Papers⌕ Search

Engineering topics

Wall, Lorin Todd

Publications and source records attributed to Wall, Lorin Todd.

Large-scale Hydrogen Storage Risk Assessment

This project investigated risks involved in deploying a large-scale hydrogen storage system at the Port of Seattle (hereafter, the Port) for its on-terminal and maritime applications in an urban industrial setting. Alongside, the project attempted to address some of the barriers to risk assessment such as need for an exact system design for a systematic investigation, direct access to surrounding communities to gauge their perceptions, and an integrated software required to undertake a full-fledged risk assessment. These barriers were overcome using illustrative reference station designs, engaging with community-facing agencies through Port support, and pooling national laboratory capabilities available for risk assessments. The project identified relevant public safety risk metrics, compared various hydrogen carriers, engaged with community-facing agencies, and explored potential gaps in existing safety codes and standards. The primary impacts of this project include the development of risk assessment guidance for ports and utilities, informing them of the trade-offs in the choice of hydrogen carriers, and the ability to increase public capacity for dialog and engagement. This paves the way toward decarbonization of the Port activities, bringing about awareness around jobs in the market for risk assessments, and the need to ramp up community engagement long before any hydrogen system deployment is undertaken.

08 HYDROGEN↗

Citadels Final Report (GMLC 2.2.1: Citadels)

This is the final project report for the Grid Modernization Laboratory Consortium (GMLC) Resilient Distribution System (RDS) Citadels project. The primary goal of this GMLC project was to increase the operational flexibly of power systems by engaging microgrids distributedly, coordinated using consensus algorithms. The primary goal was successfully achieved. The primary goal was divided into three areas: Implement peer-to-peer control between microgrid controllers using the Open Field Message Bus (OpenFMB) approach; Develop and implement consensus algorithms on commercially available hardware that allows a group of microgrids to distributedly implement operational controls; Develop the architectures and controls to enable groups of microgrids to coordinate their operations to support the bulk power system during abnormal events, and end-use loads in the event the bulk power systems fail.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Rules-Based Deconfliction of ADMS Applications: Part 1: Requirements & Decomposition

This work introduces a rules-based deconfliction methodology for resolving conflicting device control commands issued by advanced power applications considering a range of technical, economic, environmental, and social objectives. The methodology is designed to serve as one of multiple alternative implementations (along with application cooperation and global optimization) for the numerical component of the Deconfliction Pipeline. Development of the methodology is divided into two parts. This first document introduces the requirements, context, and methods for decomposing the deconfliction problem using the Laminar Coordination Framework and Variable Grid Structures. The deconfliction problem is decomposed into a distributed optimization problem based on the concept of quasi-static grid segments, which form independent distributed areas for control and coordination. Selection of the optimal number of decompositions of the deconfliction problem should be made based on a tradeoff analysis between computational speed and global optimality. This second document will define an initial set of technical, economic, and environmental criteria, as well as thirty specific qualitative rules that are used as part of the deconfliction methodology to eliminate non-viable setpoint alternatives. The deconfliction optimization problem is converted into a ranking of individual discrete setpoints, which are scored by the extent to which they satisfy specific decision criteria. The ranking is determined through the concepts of deconfliction exclusivity, priority, and preference. Several multi-criteria decision-making frameworks are examined with the simple multi-attribute rating technique exploiting ranks (SMARTER) recommended as a simple implementation alternative that aligns with the steps of the rules-based deconfliction methodology.

97 MATHEMATICS AND COMPUTING↗

Small Hydropower Interconnections: Small Hydropower in the United States

Small hydropower projects, which we define as generators below 20 MW in capacity have been the predominant source of hydropower growth over the past decade and create the most cost-effective and environmentally permissible avenues for new hydropower installation in the United States (DOE 2016; Johnson et al. 2018). Small hydropower developers across the United States have found that interconnecting these projects with the grid can be challenging due to unexpected costs and schedule overruns. Understanding the interconnection challenges and improving the process may allow more small hydropower projects to be successful. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. To begin to analyze the existing interconnection processes and challenges facing small hydropower, the state of small hydropower development in the U.S. must first be described to understand the characteristics of the industry. The first in a series, this paper presents the state of small hydropower projects in the U.S. to describe their type, location, and size based on data extracted from the HydroSource database (ORNL 2020). The following papers in the series will detail the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”), and present best practices in interconnection processes (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Small Hydropower Interconnections: Analysis of Interconnection Processes

Small hydropower projects have faced the challenge of navigating the process to interconnect their generation source to electricity distribution and transmission grids. Small hydropower developers have found interconnection procedures to be opaque and ultimately result in unexpected cost surprises and long timelines. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. After reviewing the status of small hydropower (“Small Hydropower Interconnections: Small Hydropower in the United States”) and the interconnection procedures across the United States (“Small Hydropower Interconnections: State Interconnection Processes”) in the first two white papers of this series, this paper uses recent data from small hydropower interconnection applications to benchmark the efficacy of the process. Using data from interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs), this paper provides context for the costs, timelines, and types of upgrades required for small hydropower projects. Interconnection applications and study reports for small hydropower projects were analyzed to collect key pieces of information about the interconnection process, timeline, costs, and type of upgrades required for interconnection. Information sourced from the reports was entered into an Interconnection Benchmarking database (IBdb), which may be found in Appendix A.1. Information from this database was used to evaluate the performance and challenges associated with interconnecting small hydropower projects. This white paper presents a description of the sources contained in the interconnection database (Section 2.0), an analysis of the interconnection timeline (Section 3.0), an evaluation the cost of interconnection upgrades (Section 4.0), and a description of the types of infrastructure upgrades (Section 5.0). The final paper in this series (“Small Hydropower Interconnections: Best Practices”) will use the analysis described here to outline best practices for interconnection processes that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Small Hydropower Interconnections: Best Practices

Small hydropower projects have been the predominant source of capacity growth of U.S. hydropower for more than a decade, and they present the most cost-effective and environmentally permissible avenues for hydropower growth (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier due to cost surprises and schedule overruns. As a culmination to research into the status and requirements of small hydropower interconnection across the United States, this paper presents the best practices for setting interconnection standards that can improve the process for small hydropower developers. As part of the analysis, the interconnection costs are compared between small hydropower, solar, and wind. The analysis of the small hydropower interconnection landscape across the United States was carried out by Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) with support from the U.S. Department of Energy Water Power Technologies Office. The research team was guided by a Technical Advisory Group (TAG) and gleaned data from publicly available sources, such as the HydroSource database (ORNL 2020) and interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs). The results of this work are shared in a series of papers detailing the state of small hydropower in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”), the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), and an analysis of the interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”). In this, the final paper in the series, best practices for interconnection processes (“Small Hydropower Interconnections: Best Practices”) are identified from the solar energy and distributed wind energy industries that are transferrable to small hydropower development. This information will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗