Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase II Pre-Front End Engineering Design Study)

GTI Energy (GTI) and team members Southern Company Services (SCS), Pacific Gas & Electric (PG&E) and the Electric Power Research Institute (EPRI) performed a Phase II Pre-Feed Study under contract DE-FE0032008 for Hydrogen Storage for Load-Following and Clean Power. The configuration of the proposed system consists of subsystems for on-site H 2 production, on-site H 2 storage (up to 54 MWth in commercial vessels) and H 2 combustion in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with an existing fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load and H 2 production is relatively constant by storing H 2 . The proposed system is an improvement over alternate low carbon dispatchable power options. Technoeconomic analyses show H 2 produced with GTI’s patented Compact Hydrogen Generator (CHG) with inherent carbon capture will be lower cost (Levelized Cost of Hydrogen, LCOH) relative to hydrogen produced with a Steam Methane Reformer (SMR) with an amine system for carbon capture. This lower cost hydrogen enables our integrated system to deliver electricity (Levelized Cost of Electricity, LCOE) at 17.4% lower cost relative to a SMR sourced H 2 -fired HRSG (with an amine system for carbon capture) – Steam Turbine Generator (STG). Our analysis using EPRI’s US REGEN macroeconomic model shows our system will have significant demand in the power market and therefore require significant capacity expansion (CHG plants built to deliver hydrogen) to deliver low cost, low carbon power. In Phase II, our Team has completed a detailed system definition including the development of process models, definition of battery limits, Process Flow Diagrams (PFDs), Piping and Instrumentation Drawings (P&IDs), and a plant layout. A preliminary design for the key components of the CHG was developed including component lists & specifications. An evaluation of environmental and permitting considerations was completed and included the development of an Environmental Information Volume (EIV). The duct burners, which are flexible and can burn hydrogen and/or natural gas, were defined and initial CFD analyses were completed.

03 NATURAL GAS↗

Compact Hydrogen Generator

GTI Energy (GTI) is developing a One-Step Hydrogen Generation through Sorption Enhanced Reforming (SER) process that provides significant improvements in energy productivity (18% efficiency improvement), environmental performance (90% CO 2 capture and up to 98%), product yield (30% reduction in natural gas consumption), and economic benefit (reduce Levelized Cost of Hydrogen by 28%) as compared to the Steam Methane Reforming process. A 20,000 Standard Cubic Feet per Day pilot plant (or Feasibility Demonstration Unit, FDU) located at the Energy and Environmental Research Center (EERC) was moved to GTI’s Des Plaines, IL facility and reconfigured to utilize an atmospheric calciner which enables CO 2 capture as a high purity product. Between operations at EERC and GTI’s facility, the pilot plant has demonstrated over 110 hours of sorbent enhanced hydrogen production at 80% or higher purity. The primary objective of this project is to advance the development of GTI’s Sorption Enhanced Reforming (SER) hydrogen production technology, known as the Compact Hydrogen Generator (CHG), to allow for a future commercial demonstration. This effort was performed over the course of 51 months. The previous effort demonstrated that previously observed catalyst deactivation can be mitigated with different catalyst substrates and operating conditions. This follow-on effort will improve both the system operational reliability, and system efficiency. Additionally, a novel approach for the calcination process will be demonstrated which can reduce the cost of carbon dioxide capture by up to 60% compared to equivalent commercial approaches.

03 NATURAL GAS↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase I Conceptual Study)

The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and the proposed system is an improvement over alternate low carbon dispatchable power options. Our demonstration will include 54 MWh of hydrogen storage. CO 2 capture inherent to the CHG process can capture 90% of the CO 2 (with upgrades to >98%) in a commercial system (~300 MWth) for sequestration or other uses. The hydrogen will be utilized in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with the existing Southern Company fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load. However, H 2 production is relatively constant by storing H 2 , and revenues are improved by arbitrage between use of low-cost off-peak variable electricity generation or use of stored H 2 under peak demand. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via system requirements review with the whole team. These requirements were then incorporated into/iterated with our Heat & Mass Balance models and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Our system generates power at 17.4% lower cost than other low carbon approaches for the H 2 generation, H 2 compression and storage, carbon sequestration, and HRSG added electricity production for a large-scale duct-fired system. Our team recommends completing the Phase II Pre-FEED study for the proposed system as the next step for the project and its tasks will achieve the overall objective and be ready to launch the FEED. The Pre-FEED tasks include updating the requirements, Concept of Operations, plant scope/process description, component modeling, system modeling, performance estimates, emission estimates, block flow diagrams, fluid/process conditions (PFD), utility usage, and facility sizing/definition. The approach will be to complete these updates in a greater level of detail for the selected site. The approach for developing the EIV is to use the updated results, including model outputs, for carbon dioxide and waste streams.

03 NATURAL GAS↗

Methane Mitigation Thermoelectric Generator (MMTEG) (Final Scientific/ Technical Report)

Gas Technology Institute (GTI) has completed a $1.815M (plus $500K cost share), 54-month Co-operative agreement with the Department of Energy’s National Energy Technology Laboratory to develop a Methane Mitigation Thermoelectric Generator (MMTEG) system for gas field applications. This novel system uses fugitive gas to produce electrical power and consists of Thermoelectric Generators (TEG) driven by a linear burner, an air compressor, an accumulator, valves, batteries, and power electronics. The electrical power generated by the system is used to compress air and, in turn, the air is used to operate the pneumatic valves at the well site instead of using natural gas (NG) which would then be vented. The team completed the project objectives which included (1) Design, fabricate and test an integrated 6We nominal MMTEG prototype system, (2) Design a “retrofit kit” MMTEG system capable of being field tested at a gas well production site, and (3) build and test the field MMTEG system in a laboratory environment. Multiple system options were developed prior to selecting a “Passive” system which meets cost, NG savings, and greenhouse gas (GHG) reduction targets although not as efficient as initially planned. The MMTEG system is built primarily from commercial off-the-shelf parts (in some cases re-purposed) including the heat exchanger, heat rejection, electronic components, and also the TEGs. The team developed and implemented a novel system including the control system developed by Morrison Applied Sciences (MAS). The team completed incremental demonstrations of the hardware prior to the MMTEG system demonstration. A one-year simulation of the air delivery and battery charging subsystems was completed prior to the integration into the MMTEG system. In addition, the team simulated two-years of thermal cycles for integrated Burner/TEG/heat rejection subsystem. Finally, the entire MMTEG system was assembled, and troubleshooting was completed over a two-week period. Next, the MMTEG system was tested to simulate over 15 weeks of entire system operation over approximately four weeks in an accelerated test fashion with minimal intervention (such as changing fuel tanks). The MMTEG system met the key goals of a unit cost of under $1500 while saving 97% of NG expended today (including leakage) on average by pneumatic systems venting to the atmosphere. The MMTEG system reduced GHG emissions by 1000X (using the methane intensification factor of 28 relative to CO2). GTI is currently pursuing a field test of the MMTEG system. Interfacing with producers has provided additional insight into system improvements. Planned improvements include additional weather protection and control system improvements including the implementation of a long- range radio capability to notify operators if there is a fault.

03 NATURAL GAS↗

Co-Generation Wastewater Treatment at Coal-Fired Energy Plants (Final Report)

Steam electric energy generation typically results in the discharge of one or more effluent streams. Coal-fired energy plant air quality regulations have had the effect of transferring pollutants previously in the flue gas to water by means of the flue gas desulfurization (FGD) system. Combined physical-chemical and biological treatment solutions are currently the most economical approach for treating FGD wastewater. Multi-effect evaporators are significantly higher cost but can meet potential upcoming regulations that are more stringent.

01 COAL, LIGNITE, AND PEAT↗