Engineering PapersSearch

Engineering topics

Vargo, Rick

Publications and source records attributed to Vargo, Rick.

Automation of vehicle processing at Space Station Freedom

A methodology for applying the Kennedy Space Center vehicle processing experience to similar operations at Space Station Freedom is described. First, the required on-orbit processing tasks are identified. These tasks are then evaluated for automation suitability, and robotic manipulator and artificial intelligence technologies are investigated to automate selected physical and cognitive tasks. Effects on processing times, extra-vehicular activity savings, and required resources for incorporating these automation enhancements are identified. Results of the following case studies are included: Phobos Gateway Vehicle On-Orbit Assembly and Launch, Lunar Evolution Vehicle On-Orbit Refurbishment, and Mars Mission Vehicle On-Orbit Assembly and Launch.

Vargo, Rick

On-Orbit Assembly Task Definition Study

McDonnell Douglas Space Systems Company at Kennedy Space Center (MDSSC-KSC) has been tasked since November 1987 to provide support to the Space Station Evolution Working Group (EWG) based at NASA's Langley Research Center (LaRC). Work in the first year of this study included extensive data gathering and the development of study methodologies. The OEXP case studies as summarized in NASA Technical Memorandum 4075, Exploration Studies Technical Report FY 1988 Status, and NASA Document Z-2.1-002, Study Requirements Document FY 1989 Studies (SRD), define the mission scenarios and technical requirements which MSFC engineers and their contractors (Martin Marietta and Boeing) utilized in their design of exploration vehicles. LaRC selected case studies and vehicle designs upon which the study team performed processing analyses. An on-orbit SSF refurbishment crew of four dedicated to OEXP vehicle processing was baselined for all studies. In some Instances, LaRC modified the vehicle designs, launch manifests, or mission scenarios provided by MSFC to obtain specific data from the processing analyses. The results from the following case studies analyzed during 1989 are provided in this report: Phobos Gateway On-Orbit Assembly and Launch, Lunar Evolution Vehicle On-Orbit Refurbishment, and Mars Mission Vehicle On-Orbit Assembly and Launch. In addition, a concept for facility accommodations at Space Station Freedom (SSF) was developed and support equipment to be provided at the facility was defined. In support of the MSFC Launch/On-Orbit Processing (LOOP) study, LaRC asked us to assess ground and on-orbit processing Impacts resulting from launching the OEXP vehicles on several different ETO launch vehicles. Results developed by this study, Including processing tasks and times, and personnel and equipment requirements, will be entered Into the VPOD data base. VPOD will be used by LaRC to analyze future OEXP vehicles configurations, SSF facility and resource Impacts, and life cycle cost predictions.

Vargo, Rick

On-orbit assembly/servicing task definition study

The OEXP vehicles being envisioned to carry out the Presidential space goals of a lunar outpost and human exploration of Mars will require on-orbit assembly, refurbishment, checkout, and launch. The On-orbit Assembly/Servicing Task Definition Study applies the space vehicle processing experience and procedures archives resident at NASA's Kennedy Space Center (KSC) to determine the task flows, and resources/facilities necessary to process the OEXP vehicles at Space Station Freedom (SSF). This data base is examined to find the closest analogies to OEXP vehicle components and assembly/refurbishment tasks. Transition tables are generated to provide traceability from KSC hardware processing experience to analogous on-orbit processing of the OEXP vehicles. Iterations in which the task flows are broken down into realistic extravehicular activity (EVA) primitive subtasks and times, and to apply automation and robotic technology to reduce crew risks and minimize EVA time, will enhance the value and accuracy of the predicted flows. These processing scenarios and the resulting resource/facility requirements are used to determine impacts of SSF, resulting in change requests to SSF requirements for provision of 'hooks and scars' to evolve the assembly complete Space Station into a transportation node. Study results to date include assembly analysis of the Martin Marietta Phobos Gateway Vehicle, refurbishment analysis of the Martin Marietta Lunar Evolution Piloted and Cargo Vehicles, and assembly analysis of the Boeing Mars Evolution Vehicle. The results of this study will be accumulated into the vehicle processing operations data base for subsequent modeling, life cycle cost, vehicle growth, and SSF impact analysis.

Vargo, Rick