Higher order mode damper for low energy RHIC electron cooler superconducting radio frequency booster cavity
Not Available
Engineering topics
Publications and source records attributed to Tuozzolo, J..
Not Available
As part of this development effort, the Cornell-BNL Energy recovery linac Test Accelerator (CBETA) [3], a 4-pass, 150 MeV energy recovery linac (ERL), utilizing a Non-scaling Fixed Field Alternating-gradient (NS-FFA) permanent magnet return loop, is currently under design and construction at Cornell University through the joint collaboration of Brookhaven National Lab (BNL) and the Cornell Laboratory for Accelerator based Sciences and Education (CLASSE). Building on the significant advancements in high-brightness photoelectron sources and SRF technology at Cornell, as well as the FFA magnet and lattice design expertise from BNL, CBETA will establish the operation of a multi-turn SRF based ERL utilizing a compact FFA return loop with large energy acceptance (a factor of roughly 3.6 in energy), and thus demonstrate one possible cost-reduction technology under consideration for the eRHIC design. Moreover, successful completion of the CBETA project requires the study and measurement of many critical phenomena relevant to designing the EIC: the Beam-Breakup (BBU) instability, halo-development and collimation, growth in energy spread from Coherent Synchrotron Radiation (CSR), and CSR micro bunching, and thus should provide valuable insight to the EIC and ERL communities. In order to demonstrate the viability of the CBETA design, the Fractional Arc Test (FAT) was added to the CBETA commissioning sequence.
This document includes twelve sections related to the previous Fractional Arc Test (FAT), CBETA final installation plan has which follows the milestones signed in the contract with the New York State Energy Development Authority (NYSERDA). In the second part we provide a plan for final installation, hardware and software preparation and the beam commissioning.
Low Energy RHIC electron Cooling (LEReC) is a bunched electron cooler at RHIC. The LEReC’s electron source needs provide up to 85 mA average current electron beam. The Bi-alkali photocathodes are chosen as electron source due to its long lifetime and high QE at the visible wavelength. Because the DC gun needs to produce 24/7 beams over several months, two cathode production systems and three transfer systems carrying multiple cathodes are designed and one set commissioned. In this report, we will describe our photocathode production and transfer systems and discuss the cathode's performance from cathode growth system to the DC gun.
A modified Halbach magnet has been designed to be installed in the splitter/merger section of the CBETA project which is under construction at Cornell University. The splitter/merger of the CBETA consists of 4 beam lines and is shown in Fig. 1. Two of the functions of the splitter/merger lines are; first to match the beam parameters at the exit of the Energy Recovery Linac (ERL) to those at the entrance of the Fixed Field Alternating Gradient (FFAG) arc, and second to place the trajectories of the reference particles of the beam bunches at the entrance of the FFAG arc on specified trajectories as they determined by the beam optics of the FFAG arc. In this technical note we present results from the 2D and 3D electromagnetic analysis of the S4.BEN01 magnet which is one of the dipole magnets of the 150 MeV line of the splitter/merger. The present design of the S4.BEN01 magnet, is based on a modified Halbach-type permanent magnet. To justify our suggestion of using a Halbach type of magnet instead of an electromagnet for the S4.BEN01 magnet we devote an APPENDIX A in which we provide details on the design of an electromagnet for the S4.BEN01 magnet and in the section under conclusion will list the pros and cons of the two designs.
In the LEReC Cooling Section (CS) the RHIC ions are traveling together with and getting cooled by the LEReC electrons. The required cooling rate sets the limit of 150 urad on tolerable angles of the electrons in the CS. One of the components of overall electron angle is the angle of the e-beam trajectory with respect to the ion beam trajectory. We set the limit for electron trajectory angle to 100 urad. It is critical for preserving small trajectory angle to keep the transverse magnetic field inside the CS drifts within +/- 2.3 mG. The drifts in the CS must be shielded from the ambient magnetic fields of the RHIC tunnel, which can be as high as 0.5 G, to minimize the transverse field inside the CS vacuum chamber. In this paper we present the final design of the magnetic shielding of the LEReC CS and discuss the results of tests dedicated to studies of the shielding effectiveness.
N/A
This Technical Note presents details of the successful achievement of Technical Milestone 2 in the NYSERDA contract with Brookhaven National Laboratory and Cornell University. The project { to design, build and commission the Cornell-BNL Electron Test Accelerator (CBETA) { will achieve final success when all 12 Technical Milestones are complete.
The LEReC Machine Protection System (MPS) is designed to alleviate the risk of possible damage to in-vacuum components of the accelerator from high power electron beam.
The splitter/merger section of the CBETA project [1] consists of 4 beam lines as shown in Fig. 1. Two of the functions of the splitter’s/merger’s lines is to match the beam parameters at the exit of the Energy Recovery Linac (ERL) to the beam parameters at the entrance of the Fixed Field Alternating Gradient (FFAG) arc, and also place the reference particles of the beam bunches at the entrance of the FFAG arc on specified trajectories according to their energies. In this technical note we are presenting results from the 2D and 3D electromagnetic analysis of the S4.BEN01 magnet which is one of the dipole magnets of the 150 MeV line of the splitter/merger. In particular we present results from two designs of the S4.BEN01 magnet, one based on iron dominated current-excited magnet, and the other design based on Halbach-type permanent magnet. An evaluation of the two designs will be given in the section under “conclusion”.
A beam energy scan of deuteron-gold collision, with center-of-mass energy at 19.6, 39, 62.4 and 200.7 GeV/n, was performed at the Relativistic Heavy Ion Collider in 2016 to study the threshold for quark-gluon plasma (QGP) production. The lattice, RF, stochastic cooling and other subsystems were in different configurations for the various energies. The operational challenges changed with every new energy. The operational experience at each energy, the operation performance, highlights and lessons of the beam energy scan are reviewed in this report.
N/A