Shuttle Electrical Power Analysis Program (SEPAP) distribution circuit analysis report
An analysis and evaluation was made of the operating parameters of the shuttle electrical power distribution circuit under load conditions encountered during a normal Sortie 2 Mission with emphasis on main periods of liftoff and landing.