Robust Distributed State Estimator for Interconnected Transmission and Distribution Networks (Final Report RPPR-1)

This project’s objective is to develop a combined transmission and distribution state estimator which accounts for very large system size and model complexity (by way of distributing the computations) and large number of solar PV units connected to the distribution system on multiple feeders. The project not only provides a robust formulation and solution to this problem but also tests the solution by implementing it on a well-established large utility system. It introduces several improvements with respect to the state of the art in existing state estimation software: (a) The developed state estimator (SE) allows robust and accurate monitoring of bidirectional flows in distribution systems which result due to the distributed energy sources which are not observable and thus not incorporated in generation dispatch; (b) Large utility systems with tens of thousands of transmission buses and hundreds of thousands of distribution nodes are difficult to model as a single integrated system. This shortcoming is addressed by developing a “scalable distributed computational framework” which allows splitting the ultra large system models into several small subsystems and coordinating their solution by a robust and practical state estimation formulation; (c) Measurement errors irrespective of their locations are detected and removed by the developed state estimator. Historically, transmission and distribution systems were analyzed and operated as two independent systems. Given the non-transposed short feeder sections, unevenly loaded phases, strictly radial configuration and unidirectional power flows in the absence of remote generation, distribution system analysis was customized to account for these characteristics. However, some of these assumptions are no longer valid (non-radial configuration, bidirectional power flows) and thus distribution system analysis should be revisited. Furthermore, in the past, the interaction between the transmission and distribution systems was quite passive, where distribution substations were modeled as lumped loads in the transmission system model. With substantial generation injected by renewable generation located in the distribution systems, such modeling will no longer be accurate. The developed state estimator facilitates proper monitoring of the interactions between the transmission and distribution systems and enables smart dispatch of these units which are made observable by the state estimator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Two-Stage Adaptive Restoration Decision Support System for a Self-Healing Power Grid

Power outages cost American industries and businesses billions of dollars and jeopardize the lives of hospital patients. The losses can be greatly reduced with a fast, reliable, and flexible self-healing tool. This paper is aimed to tackle the challenging task of developing an adaptive restoration decision support system (RDSS). The proposed RDSS determines restoration actions both in planning and real-time phases and adapts to constantly changing system conditions. The comprehensive formulation encompasses practical constraints including ac power flow, dynamic reserve, and load modeling. Here, the combinatorial problem is decomposed into a two-stage formulation solved by an integer L-shaped algorithm. The two stages are then executed online in the RDSS framework employing a sliding window method. The IEEE 39-bus system has been studied under normal and contingency conditions to demonstrate the effectiveness and efficiency of the proposed online RDSS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Black Start Resource Allocation

The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.