Quench Performance of the First Pre-series AUP Cryo-assembly

The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb 3 Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. Here in this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.

43 PARTICLE ACCELERATORS↗

A Flexible Field Mapping System for Accelerator Magnets

Magnetic field mapping is a fundamental magnetic measurement method that typically uses Hall and NMR sensors. In magnet measurement facilities, such systems are likely used in various configurations suitable for a specific task at hand. To address this diversity, the authors developed a flexible field mapping system capable of being configured and tailored to each particular measurement case. Further, the system needs to address the variability introduced by differences in sensors and their readout systems, probe positioning systems, power supply systems, and required mapping geometry (mapping space and grid, measurement steps and sequences). Although the discussed field mapping systems range from a self-propelled multi-sensor mapper of a large detector magnet to a single 3D Hall sensor system to scan a small permanent magnet, they were all built with the same core mapping system. The variability present in field mapping systems, the measurement system architecture addressing this variability, as well as examples of several field mapping systems built in this architecture are presented.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning

Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Here, in this paper, overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented.

43 PARTICLE ACCELERATORS↗

Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab

MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the U.S. Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. Here this paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Flexible Field Mapping System for Accelerator Magnets

Magnetic field mapping is a fundamental magnetic measurement method that typically uses Hall and NMR sensors. In magnet measurement facilities, such systems are likely used in various configurations suitable for a specific task at hand. To address this diversity, the authors developed a flexible field mapping system capable of being configured and tailored to each particular measurement case. The system needs to address the variability introduced by differences in sensors and their readout systems, probe positioning systems, power supply systems and in required mapping geometry (mapping space and grid, measurement steps and sequences). Although the discussed field mapping systems range from a self-propelled, multi-sensor mapper of a large detector magnet to a single 3D Hall sensor system to scan a small permanent magnet, they were all built with the same core mapping system. The variability present in field mapping systems and the measurement system architecture addressing this variability, as well as examples of several field mapping systems built in this architecture are presented.

43 PARTICLE ACCELERATORS↗

Fermilab’s horizontal test stand upgrade overview and commissioning

Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗