Engineering PapersSearch

Engineering topics

Takahashi, Yu

Publications and source records attributed to Takahashi, Yu.

Navigating Low-Energy Trajectories to Land on the Surface of Europa

The current interest in sending a probe to the surface of Europa in search of life demands not only efficient strategies in mission design, but also requires the capability of knowing the navigability of such types of trajectories. An initial search to find low-energy approach trajectories with a variety of topologies that are challenging to navigate is initially performed in the circular restricted three-body problem. These trajectories are subsequently converted to the ephemeris model and used for detailed navigation analysis. We explore several maneuver strategies and assess spacecraft state uncertainties at Europa arrival as well as fuel consumption.

McElrath, Tim

Juno Orbit Determination Experience During First Year At Jupiter

The Juno spacecraft successfully inserted into a polar orbit around Jupiter on 5- July-2016. Since the Jupiter Orbit Insertion (JOI) maneuver, Juno has completed six orbits around Jupiter. The mission plan at the time of JOI was for Juno to perform two 53.5-day capture orbits before executing a Period Reduction Maneuver (PRM) to place the spacecraft into its intended 14-day science orbit. This maneuver was canceled due to a concern with the propulsion system. As a result, the Juno spacecraft will remain in its longer orbit period for rest of its mission. This paper discusses the Navigation Team’s experience: the orbit determination strategy and how it changed due to the cancellation of the PRM, challenges fitting the data during perijove, and how we reconstructed the trajectory during Juno’s first year in orbit.

Thompson, Paul

B-plane Evolution Under Highly Non-Keplerian Dynamics

Juno is the second of a series of New Frontiers missions and was launched in 2011. The spacecraft was set en route to Jupiter, and its Jupiter Orbit Insertion occurred on 2016-07-04 after a five-year cruise in deep space. The mission phase just prior to this large maneuver is called approach. As navigation team, we were responsible for precise orbit determination of the Juno spacecraft to ensure a successful orbit insertion. To evaluate the navigation performance we employed the B-plane mapping, where the incoming hyperbolic velocity defines the plane perpendicular to it, and the time to go to hit the plane will directly map into the uncertainties of the target point. The B-plane is a convenient tool when assessing the navigation performance as it is not affected by non-linearities due to the gravitational pull of the targeted body. However, as the Jupiter Orbit Insertion approached we started to realize that the B-plane mapping uncertainties were significantly larger than expected. We found that the B-plane mapping time had tremendous influence on the covariance inflation in the B-plane. Because of the close approach distance during the Jupiter Orbit Insertion and the strong interaction with J2 spherical harmonic coefficient, the Juno dynamics were too far from a Keplerian one assumed for the B-plane mapping. We first discuss the analytical approach of the B-plane mapping uncertainty and perform a numerical analysis to isolate the components of the Juno dynamics that cause the B-plane covariance inflation.

Bordi, John

JUNO navigation for Jupiter orbit insertion

Juno arrived at Jupiter on 05 July 2016 UTC, achieving orbit with the execution of the Jupiter Orbit Insertion (JOI) maneuver. Thanks to a dynamically wellbehaved spacecraft, the delivery of Juno to JOI was done largely with only a maneuver to setup and Earth gravity assist (EGA), an EGA, an EGA clean-up maneuver, and a JOI targeting maneuver. During the last several weeks of the approach to JOI, the dominant uncertainties in the predicted trajectory were from the Jupiter barycenter ephemeris. In this paper, we discuss the maneuver and orbit determination (OD) strategy for successfully arriving at JOI, the the challenges of calculating a correction to the Jupiter barycenter ephemeris using only radiometric data types, and how the ephemeris estimates during approach to JOI compare to a post-JOI trajectory reconstruction.

Takahashi, Yu

Determination of Celestial Body Principal Axes via Gravity Field Estimation

The determination of physical parameters of celestial bodies provides critical navigational and scientific information. Determining the mass, rotation state, and density distribution is an important task of the navigation team on an operational mission. One representation of the internal density distribution, spherical harmonics, may be leveraged to compute the orientation of the principal axis frame of the celestial body, which in turn informs the dynamics of the body’s motion. Using data from NASA’s Dawn mission to the massive asteroids (1) Ceres and (4) Vesta, a method is proposed that refines the knowledge of the principal axis frame by utilizing estimated spherical harmonic coefficients. Applying an iterative rotation scheme to the solved-for body-fixed frame leads to convergence on a frame that is very close to the actual dynamical principal axis frame.

Takahashi, Yu

Forward Modeling of Ceres' Gravity Field for Planetary Protection Assessment

The Dawn spacecraft arrived at the dwarf planet Ceres in early 2015 after a two and a half-year cruise in deep space after departing Vesta. The nominal plan for Dawn included successively lower science orbits, the last of which is called the Low Altitude Mapping Orbit that also serves as the disposal orbit after the end of mission. Prior to Dawn’s arrival at Ceres, it was identified that Dawn would have to meet planetary protection requirements at Ceres by remaining on a stable orbit for 20 years past the end of the mission. With little a priori knowledge on Ceres’ interior we analyzed what gravitational perturbations influence the long-term dynamical evolution of Dawn around Ceres and validated that the gravitational model of Ceres with the then-current best estimate of the density distribution model does not exceed the permissible bounds. The forward modeling of gravity fields from various shape models and density distribution was deemed valid to satisfy the planetary protection guidelines. This analysis was further confirmed after a new shape model based on the actual optical images was created. The gravity field as measured in the High Altitude Mapping Orbit also fits within the bounds of gravitational field studied pre-arrival at Ceres to substantiate our methodology used to satisfy the planetary protection requirement.

Takahashi, Yu

Determination of Ceres Physical Parameters Using Radiometric and Optical Data

The Dawn spacecraft was launched on September 27th, 2007. Its mission is to rendezvous with and observe the two largest bodies in the main asteroid belt, Vesta and Ceres. It has completed over a year’s worth of direct observations of Vesta from early 2011 through late 2012. In the spring of 2015, the Dawn spacecraft entered orbit around the asteroid Ceres for the start of what is expected to be more than a year of science operations. The science data collected from this encounter consist of infrared (IR) images and spectra, visible images through a number of color filters, gamma ray detections and measurements of the Ceres gravity field. These data will be collected during several science phases: an Approach phase (1500000-4860 km from Ceres), a Survey orbit (4860 km radius), a High Altitude Mapping Orbit (HAMO) (1940 km radius) and a Low Altitude Mapping Orbit (LAMO) (855 km radius). The Approach phase included three Rotational Characterization (RC) opportunities. Designing each science orbit and successfully transferring into that orbit requires a sufficiently accurate estimate of Ceres physical parameters (body fixed frame, GM and harmonics). This paper focuses on work performed to estimate Ceres physical parameters using Deep Space Network (DSN) radiometric tracking data and optical measurements derived from science camera imagery. This paper describes planning for the data acquisition, as well as processing techniques and methodology. The trajectories predicted by the gravity field estimations are also compared with the actual as-flown trajectories. Observations of the gravity at high altitudes are found to be sufficient to design precision orbits at lower altitudes. Follow-up analysis after successfully reaching LAMO is included, as is a discussion of lessons learned.

Kennedy, Brian M.

Flyby Characterization of Lower-Degree Spherical Harmonics Around Small Bodies

Interest in studying small bodies has grown significantly in the last two decades, and there are a number of past, present, and future missions. These small body missions challenge navigators with significantly different kinds of problems than the planets and moons do. The small bodies' shape is often irregular and their gravitational field significantly weak, which make the designing of a stable orbit a complex dynamical problem. In the initial phase of spacecraft rendezvous with a small body, the determination of the gravitational parameter and lower-degree spherical harmonics are of crucial importance for safe navigation purposes. This motivates studying how well one can determine the total mass and lower-degree spherical harmonics in a relatively short time in the initial phase of the spacecraft rendezvous via flybys. A quick turnaround for the gravity data is of high value since it will facilitate the subsequent mission design of the main scientific observation campaign. We will present how one can approach the problem to determine a desirable flyby geometry for a general small body. We will work in the non-dimensional formulation since it will generalize our results across different size/mass bodies and the rotation rate for a specific combination of gravitational coefficients.

Takahashi, Yu