Prevalence of typical operational problems and energy savings opportunities in U.S. commercial buildings

In the United States, as much as 30% of the 19 EJ that commercial buildings consume is considered excess. Much of the excess energy is due to the inability to manage building operations efficiently. Because almost 20% of the total primary energy consumption is associated with commercial buildings, significant energy reductions in this sector are needed to mitigate climate change. Therefore, many cities and states are mandating periodic “tune-ups” of these buildings to eliminate excess energy consumption. Although the benefits of tune-ups and retro-commissioning are clear, focusing these mandates to look for specific opportunities has been a challenge because of the lack of studies that document the prevalence of opportunities. Therefore, we analyzed building automation system data from 151 buildings across the United States to document common operational problems and opportunities to improve building operations. This analysis showed that opportunities to improve building operations exist in almost every building. These opportunities were not strongly correlated with building vintage or size, but were reflective of how the buildings are operated. The prevalence of the top 20 opportunities ranged between 74% and 23%, with 40% of these associated with air-handling units. The rest of the opportunities are associated with schedules, chilled and hot-water distribution, and zone controls. Of the 151 buildings, 69 of them implemented corrective actions of some or all opportunities that were identified. Implementation varied across the Re-tuning categories, with 60% for schedule opportunities, 50% for zone opportunities, over 40% for the air-handling unit and hot-water opportunities, and 35% of the chilled-water opportunities. There was wide variation in whole building energy savings, ranging from 0 to 50% and 0 to 18 $/m2 with median percent annual whole building savings of 12% and median normalized annual cost savings of $1.75/m2. In addition to documenting these key findings, the paper provides a list of opportunities that can be automatically and continuously identified and corrected and offers a list of those opportunities that should be the focus of the mandates.

Katipamula, Srinivas↗

Energy cost savings and expected payback for Re-tuning the controls of US Army buildings

The Headquarters Department of the Army (HQDA) sponsored a study to determine the national impact of deploying the Re-tuning™ methodology in 5 buildings types that account for over 40% of the Army’s conditioned building stock. Re-tuning is a systematic process that improves operational efficiency and reduces energy consumption at no- or low-cost through the building automation system (BAS) by correcting operational problems that plague buildings. The study relied on successful demonstration of the re-tuning methodology at 4 pilot US Army installations that informed a holistic effort that included simulating 12 individual re-tuning energy efficiency measures (EEMs) and 6 packages of EEMs in 5 selected Army building prototype models that represent 311 million ft2 (28.9 million m2) of the Army’s conditioned floor space. Both the baseline buildings and the packages were customized to capture the expected outcomes of re-tuning a diverse set of buildings. The study highlighted the benefit of individual re-tuning EEMs and economics of implementing packages of EEMs in applicable Army buildings across 16 climates and 2 building vintages. The average whole-building energy savings ranged from 10.8% to 40.5% by building type, with the company operations facility (COF) building having the highest value proposition from re-tuning. In addition, the study reveals that all large office (LO) buildings in the Army are economical to re-tune. The total modeled cost savings potential for re-tuning the five building types across the US Army is $204/1,000 sf ($220/100 m2), or $64M annually. This cost savings represents 5.6% of all the Army’s energy expenditures.

Fernandez, Nicholas EP↗

Highlights and Lessons Learned from Army Re-tuning™ Pilot Demonstrations

The Army has aggressively pursued policy and energy efficiency projects and programs in recent years to meet Federal mandates and reduction goals organizationally (EISA 2007, AR 420-1, 42 U.S.C. § 8253), resulting in a 9.6% reduction in energy use intensity (EUI) from FY2015 to FY2017. Despite these successes, the Army remains the largest consumer of electricity in the Federal government and spent approximately $1.1 billion in energy-related costs in FY2017. Many of the low-cost/no-cost conservation measures have been deployed, so finding additional savings and projects that either (a) are cost effective or (b) can be bundled with more costly capital improvement projects to improve life cycle cost effectiveness, is imperative for the Army. Leveraging building control systems (BCS) and optimizing building performance through re-tuning represents a great opportunity for the Army. In 2016, the Pacific Northwest National Laboratory (PNNL), in support of the Assistant Secretary of the Army (Installations, Energy and Environment), i.e. ASA (IEE), was tasked in 2016 with a multi-year study and pilot demonstration to develop a business case for the potential energy and cost reduction benefits from re-tuning efforts for the Army.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Army Re-tuning™ Implementation Guides

The Army is a large, geographically dispersed organization with 156 installations and over 980 million square feet of building space to operate and maintain. The building stock spans a wide range of vintages and missions, with many serving cross-cutting functions and purposes. To meet Federal mandates and reduction goals organizationally, in recent years the Army has aggressively pursued policy and energy efficiency projects and programs resulting in a 9.6% reduction in energy use intensity (EUI) from fiscal year (FY) 2015 to FY2017. Despite these successes, the Army remains the largest consumer of electricity in the Federal government and spent approximately $1.1 billion in energy-related costs in FY2017 The Pacific Northwest National Laboratory (PNNL), in support of the Assistant Secretary of the Army (Installations, Energy and Environment) (ASA (IE&E)), was tasked with a multi-year study and pilot demonstration to develop a business case for the potential energy and cost reduction benefits from re-tuning™ efforts for the Army. Re tuning is a systematic process aimed at minimizing building energy consumption by identifying and correcting operational problems that plague buildings. The methodology was developed by PNNL research staff in an effort to improve building operational efficiency at no- or low-cost, primarily through building automation system (BAS) controls. The methodology is based on two basic principles: If the equipment is not needed, turn it off; and if the equipment is not needed at full power, turn it down. Implementation of identified low-cost/no-cost operational improvements through the re-tuning process results in increased building energy efficiency, reduced operating costs, and improvement to occupant comfort.