St Germain, Shawn W

Publications and source records attributed to St Germain, Shawn W.

At least 19 records

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Plant-specific Model and Data Analysis using Dynamic Security Modeling and Simulation

The requirements for U.S. nuclear power plants to maintain a large on-site physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an update on the progress in applying a dynamic computational framework that links results from a commercially available force-on-force simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework or MASS-DEF. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report does not contain any plant's sensitive information and/or Safeguards Information. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methodology and Tool for the Physical Security Analysis of Micro and Advanced Reactors

This work proposes a dynamic evaluation methodology to relax the conservatism in physical security evaluation, by leveraging an ongoing work in the Light Water Reactor Sustainability pathway. This methodology is implemented in a dynamic risk assessment tool named Event Modeling Risk Assessment using Linked Diagrams (EMRALD). The work extends EMRALD’s capability to support a sandbox feature where analysts can easily create attack scenarios and modify advanced/small modular reactor (A/SMR) security and safety features using templates. This approach saves time and cost since the analysis does not require creating detailed computer-aided design models, as is commonly required in commercial force-on-force software tools. EMRALD is completely free to use at https://emraldapp.inl.gov. We have developed basic templates including physical barriers, intrusion sensors, physical areas, and safety actions, that can be downloaded from EMRALD’s GitHub site: https://github.com/idaholab/EMRALD. These templates use generic data commonly used for training purposes, which do not reflect any actual operating nuclear reactor. Users may adjust the data in the templates with their own dataset and/or create new templates in EMRALD. The proposed methodology combines security and safety by assessing sabotage effects up to the radiological consequence to the public instead of merely the core damage state. This practice follows the industry standard for advanced non-light-water reactors currently proposed for endorsement by the Nuclear Regulatory Commission. The combination of security and safety is expressed in an achievability-consequence chart. EMRALD can be used to generate data for this chart. A hypothetical case study using a representative sodium-cooled fast reactor (SFR) facility is presented in this report to demonstrate this methodology. This case study does not contain any actual nuclear plant information. This work will benefit A/SMR vendors and utilities to implement security by design during the reactor design iteration phase, such that they do not have to perform upgrades and retrofits to the reactor after it is installed to improve its physical protection system. The tool may also be used to analyze domestic or foreign reactor designs to support the International Nuclear Security Techniques for Advanced Reactors (INSTAR) bilateral missions. Future works are planned to implement the methodology on a reference SFR reactor and a reference high-temperature gas-cooled reactor to obtain insights and lessons-learned for the A/SMR community.

97 MATHEMATICS AND COMPUTING↗

ANS PSA 2023 presentation

Presentation for paper "Technical and Regulatory Aspects of Integrating Safety and Security at Nuclear Power Plants"

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Technical and Regulatory Aspects of Integrating Safety and Security at Nuclear Power Plants

This paper provides an overview of lessons learned in applying a dynamic computational framework that links results from a commercially available FOF simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework. It describes how a user could integrate their plant-specific FOF models with safety mitigation actions in EMRALD, and with thermal-hydraulic tools, such as MAAP. The work performed in this paper is based on a generic EMRALD model with actual plant data used for the analysis. However, only the generic model and general results of the analysis are presented for dissemination. No plant’s sensitive information is included in this paper. The discussion shows examples of insights that can be obtained from the proposed methodology.

97 MATHEMATICS AND COMPUTING↗

Physical Security Timeline Analysis in Support of Advanced Reactor Demonstration and Deployment

This report presents the regulatory requirements and directions on the physical security of advanced nuclear reactors in USA. Presently, a rule is being proposed that allows for a performance-based analysis. In determining the physical security requirements for an advanced reactor, new tools may be desired to conduct a performance-based analysis. These tools should incorporate dynamic analysis methods to provide as much realism as possible. In comparison, the security requirements for existing light water reactors (LWRs) are much more prescriptive and the analysis conducted to establish the required physical security strategies were more easily performed with static analysis. In order to achieve the cost goals that advanced reactors require for adoption; the nuclear security force required should not be excessive. Dynamic physical security analysis methods and tools have been developed by the US Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program. This report details how the dynamic risk analysis tools developed in the LWRS program using the dynamic risk modelling tool, EMRALD, may be adapted for use in analyzing the physical security designs for advanced reactors accounting for variable performance-based requirements. This report provides an example analysis of a hypothetical SFR using publicly available information and generic assumptions to demonstrate the methods and potential presentation and analysis of the results. No actual plant information is used in this example analysis. Future work in this area will create additional models that can be adapted for any advanced reactor concept and use various security features to create a physical security system that provides adequate protection from radiological theft and sabotage.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Physical Security Risk for Potential Implementation of FLEX using Dynamic Simulation Methods

The requirements for United States nuclear power plants to maintain a large onsite physical security force contribute to their large operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability Program Physical Security Pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. This pathway will analyze and minimize the conservatisms built into current security postures in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within this pathway has successfully developed a dynamic force-on-force (FOF) modeling framework using various computer simulation tools and integrated them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an overview of lessons learned in applying a dynamic computational framework that links results from a commercially available FOF simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework. Previous reports described how a user could integrate their plant-specific FOF models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as Computer Aided Fault Tree Analysis System or Systems Analysis Programs for Hands-on Integrated Reliability Evaluations, and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance of the use of the framework. Such an assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants. NOTE: The work performed in this report is based on a generic EMRALD model with actual plant data used for the analysis. However, only the generic model and general results of the analysis are in the report. No plant’s sensitive information is discussed in this report. The discussion shows examples of insights that can be obtained from the MASS-DEF methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Dynamic Risk Framework for the Optimization of Physical Security Posture of Nuclear Power Plants

This paper describes an ongoing work within the Light Water Reactor Sustainability pathway at Idaho National Laboratory (INL) to optimize security and cost of nuclear power plants. It introduces the dynamic risk assessment tool developed at INL, Event Modeling Risk Assessment using Linked Diagrams (EMRALD). EMRALD was leveraged to optimize the security posture of a nuclear power plant by integrating force-on-force (FOF) simulations and operator mitigation actions including the dynamic and flexible coping strategies (FLEX). To illustrate the methodology, four attack scenarios were modeled in a commercially available FOF simulation tool using a hypothetical nuclear power plant facility. The simulation results provide valuable insights into possible attack outcomes, as well as the probabilistic risk of core damage event given these outcomes. Safety mitigation procedures were modeled in EMRALD dependent on the attack outcomes by considering human operator uncertainties. The results demonstrate that the number of armed responders can be optimized, while still maintaining the same protection level as the initial security posture. The proposed modeling and simulation framework of integrating FLEX equipment with FOF models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

METHODOLOGY AND APPLICATION OF PHYSICAL SECURITY EFFECTIVENESS BASED ON DYNAMIC FORCE-ON-FORCE MODELING

This paper describes ongoing work within the Light Water Reactor Sustainability (LWRS) Program at Idaho National Laboratory (INL) to optimize security and cost of nuclear power plants (NPPs). It reviews the conservatisms in conventional physical security posture and regulations. It introduces the dynamic risk assessment tool developed at INL, Event Modeling Risk Assessment using Linked Diagrams (EMRALD). The dynamic assessment methodology leverages EMRALD to process results of force-on-force (FOF) simulations and crediting safety mitigation actions from probabilistic risk assessment (PRA) models as well as diverse and flexible coping strategies (FLEX) mitigation strategies. Timing information from these simulations are compared against the available time to perform mitigations obtained from Reactor Excursion and Leak Analysis Program (RELAP5) simulations. To illustrate the methodology, a station blackout (SBO) attack scenario was modeled in commercially available FOF simulation tools. The simulation results provide valuable insights into possible attack outcomes and as the probabilistic risk of a core damage event given these outcomes. Safety mitigation procedures were modeled in EMRALD, and were dependent on the attack outcomes by considering human operator uncertainties. RELAP5 simulations incorporating human and hardware uncertainties were performed to estimate the distribution of time-to-core damage. The results demonstrate that, even in the extreme case of a successful adversarial attack, plant mitigation strategies provide significantly high-likelihood of preventing radiological release. The proposed modeling and simulation framework of integrating FLEX equipment with FOF models enables the NPPs to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methodology and Application of Physical Security Effectiveness Based on Dynamic Force-on-Force Modeling

This report describes the research and development being performed at INL towards a dynamic modeling and simulation framework to enable physical security optimization at commercial nuclear power plants. The framework is based on the dynamic modeling tool EMRALD and is demonstrated for applications that can result in physical security optimization. Two main applications are presented: 1. Integrating FLEX portable equipment performance with FOF models of a plant’s physical security posture, and 2. Location optimization of bullet resistant enclosure. The generic framework for modeling FLEX portable equipment is described in detail, followed by a case study modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical PWR. Two distinct FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial FOF tool, AVERT, are integrated with the FLEX deployment model in EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. Thermal-hydraulic analysis of FLEX performance is performed in RELAP5 and integrated with the EMRALD simulations to provide more realistic timelines in the models. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework of integrating FLEX equipment with FOF models enables the NPPs to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security. The objective of location optimization of BRE is to determine the best location in the plant for a new BRE being planned by the plant to enhance their physical security effectiveness. The plant physical security FOF model is integrated with EMRALD that performs Monte Carlo simulation to run different attack scenarios and a discrete set of potential BRE locations. Sensitivity analysis is used to determine the most effective location for the BRE. The optimization approach can be extended to wide applications such as location optimization of remotely operated weapons and other strategic fixed assets.

97 MATHEMATICS AND COMPUTING↗

INTEGRATION OF FLEX EQUIPMENT AND OPERATOR ACTIONS IN PLANT FORCE-ON-FORCE MODELS WITH DYNAMIC RISK ASSESSMENT

The overall operation and maintenance cost to protect nuclear power plants accounts for approximately 7% of the total cost of power generation, with labor accounting for half of this cost. In the current research, from interaction with utilities and other stakeholders, it was determined that physical security forces account for nearly 20% of the entire workforce at several nuclear power plants. Labor costs continue to rise in the U.S., so any measures to reduce the cost of operating a nuclear power plant will need to include a reduction in labor. The physical security pathway within the DOE’s Light Water Reactor Sustainability program aims to lower the cost of physical security through directed research into modeling and simulation, application of advanced sensors or deployment of advanced weapons. This report presents a modeling and simulation framework for integrating Diverse and Flexible Mitigation Capability (FLEX) portable equipment performance with Force on Force models of a plant’s physical security posture. The generic framework is described in detail, followed by a case study of modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical nuclear power plant. Two different FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial Force on Force tool are integrated with the FLEX deployment model in INL’s dynamic modeling tool EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework integrating FLEX equipment with Force on Force models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.

97 MATHEMATICS AND COMPUTING↗

STOCHASTIC OPTIMIZATION FOR LONG TERM CAPITAL STRUCTURES, SYSTEMS, AND COMPONENTS REFURBISHMENT AND REPLACEMENT

As commercial nuclear power plants (NPPs) pursue extended plant operations in the form of Second License Renewals (SLRs), opportunities exist for these plants to provide capital investments to ensure long-term, safe, and economic performance. Several utilities have already announced their intention to pursue extended operations for one or more of their NPPs via SLR2. The goal of this research is to develop a riskinformed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions in NPP operations. In order to prioritize project selection via a riskinformed approach we developed a single decision-making tool that integrates safety/reliability, cost, and stochastic optimization models to provide users with data analysis capabilities to more cost effectively manage plant assets. Both stochastic analysis methods—such as Monte Carlo-based sampling strategies—and multi-stage stochastic optimization strategies are employed to provide priority lists to decisionmakers in support of risk-informed decisions. We applied the proposed method to a trial application of projected replacement/refurbishment expenditures for plant capital assets (i.e., Structures, Systems, and Components [SSCs]). The objective is to optimize the SSC replacement/refurbishment schedule in terms of economic constraints, data uncertainties, and SSC reliability data, as well to generate a priority list for maximizing returns on investment.

42 ENGINEERING↗

Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗

Risk-informed Physical Security Using Dynamic Force-on-Force Modelling Tools (ABSTRACT)

Physical security requirement of nuclear power plants (NPPs) in the US is regulated in a mainly prescriptive manner. This “one size fits all” approach may consequently overlook plant-specific characteristics which are beneficial for the inherent safety and security of the plant. Although a performance-based security measure has been promulgated in 10 CFR 73.55(r), current evaluation methods generally emphasize static and conservative assumptions on physical security uncertainties. This conservatism contributes to the overall operational and maintenance costs, which account to 70% of total operating expenditures for an NPP. This paper describes an ongoing work at the Idaho National Laboratory within the Light Water Reactor Sustainability pathway, which aims to optimize physical protection system with regards to system effectiveness and dollar costs. To achieve this goal, a risk-informed approach to physical security is proposed. This approach leverages the Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool to model facility infiltration and Force-on-Force (FoF) engagement in a dynamic manner. The dynamic FoF analysis was conducted by coupling human performance uncertainties modeled in EMRALD to existing commercial 3-dimensional FoF software, i.e. SCRIBE3D, AVERT and Simajin. Meanwhile, risk analysis was accomplished by coupling the attack outcomes to existing plant Probabilistic Risk Assessment (PRA) model with FLEX strategy. This approach reduces the conservatisms in security modeling and further acknowledges the possibility for plant operators to mitigate the attack outcomes. A sabotage attack on a hypothetical NPP facility was devised to demonstrate the proposed methodology. Dynamic FoF rules were implemented in EMRALD coupled to SCRIBE3D. This dynamic evaluation revealed an additional 21% system effectiveness in protecting the target set relative to the static modelling approach. Furthermore, the conditional core damage probability could be reduced by up to 46% by crediting operator actions in mitigating the sabotage outcomes. We evaluated the relative importance of each component of the physical security posture included in the model and assessed tradeoffs between components to identify potential opportunities for cost reduction while maintaining a specific level of system effectiveness. Results of the cost analysis will be presented in the conference. This study is expected to help NPP operators in allocating resources optimally to satisfy the security requirements.

97 MATHEMATICS AND COMPUTING↗