Engineering Papers⌕ Search

Engineering topics

St Germain, Shawn W

Publications and source records attributed to St Germain, Shawn W.

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Plant-specific Model and Data Analysis using Dynamic Security Modeling and Simulation

The requirements for U.S. nuclear power plants to maintain a large on-site physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an update on the progress in applying a dynamic computational framework that links results from a commercially available force-on-force simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework or MASS-DEF. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report does not contain any plant's sensitive information and/or Safeguards Information. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methodology and Tool for the Physical Security Analysis of Micro and Advanced Reactors

This work proposes a dynamic evaluation methodology to relax the conservatism in physical security evaluation, by leveraging an ongoing work in the Light Water Reactor Sustainability pathway. This methodology is implemented in a dynamic risk assessment tool named Event Modeling Risk Assessment using Linked Diagrams (EMRALD). The work extends EMRALD’s capability to support a sandbox feature where analysts can easily create attack scenarios and modify advanced/small modular reactor (A/SMR) security and safety features using templates. This approach saves time and cost since the analysis does not require creating detailed computer-aided design models, as is commonly required in commercial force-on-force software tools. EMRALD is completely free to use at https://emraldapp.inl.gov. We have developed basic templates including physical barriers, intrusion sensors, physical areas, and safety actions, that can be downloaded from EMRALD’s GitHub site: https://github.com/idaholab/EMRALD. These templates use generic data commonly used for training purposes, which do not reflect any actual operating nuclear reactor. Users may adjust the data in the templates with their own dataset and/or create new templates in EMRALD. The proposed methodology combines security and safety by assessing sabotage effects up to the radiological consequence to the public instead of merely the core damage state. This practice follows the industry standard for advanced non-light-water reactors currently proposed for endorsement by the Nuclear Regulatory Commission. The combination of security and safety is expressed in an achievability-consequence chart. EMRALD can be used to generate data for this chart. A hypothetical case study using a representative sodium-cooled fast reactor (SFR) facility is presented in this report to demonstrate this methodology. This case study does not contain any actual nuclear plant information. This work will benefit A/SMR vendors and utilities to implement security by design during the reactor design iteration phase, such that they do not have to perform upgrades and retrofits to the reactor after it is installed to improve its physical protection system. The tool may also be used to analyze domestic or foreign reactor designs to support the International Nuclear Security Techniques for Advanced Reactors (INSTAR) bilateral missions. Future works are planned to implement the methodology on a reference SFR reactor and a reference high-temperature gas-cooled reactor to obtain insights and lessons-learned for the A/SMR community.

97 MATHEMATICS AND COMPUTING↗

ANS PSA 2023 presentation

Presentation for paper "Technical and Regulatory Aspects of Integrating Safety and Security at Nuclear Power Plants"

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Technical and Regulatory Aspects of Integrating Safety and Security at Nuclear Power Plants

This paper provides an overview of lessons learned in applying a dynamic computational framework that links results from a commercially available FOF simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework. It describes how a user could integrate their plant-specific FOF models with safety mitigation actions in EMRALD, and with thermal-hydraulic tools, such as MAAP. The work performed in this paper is based on a generic EMRALD model with actual plant data used for the analysis. However, only the generic model and general results of the analysis are presented for dissemination. No plant’s sensitive information is included in this paper. The discussion shows examples of insights that can be obtained from the proposed methodology.

97 MATHEMATICS AND COMPUTING↗