Engineering PapersSearch

Engineering topics

Sparn, Thomas P.

Publications and source records attributed to Sparn, Thomas P..

Solar-Stellar Irradiance Comparison Experiment 1. I - Instrument design and operation

The main objective for the Solar-Stellar Irradiance Comparison Experiment (SOLSTICE) is to accurately measure the full disk solar spectral irradiance in the ultraviolet (UV) spectral region over a long time period. To meet this objective, SOLSTICE has the unique capability of making routine observations of the UV radiation from a set of early-type stars, using the identical optical elements and detectors employed for the solar observations. The stars selected for this calibration are assumed, on the basis of stellar evolution theory, to be extremely stable in the UV spectral region. Moreover, it is the average flux from a number of stars, perhaps from as many as 25, that is assumed to be stable. The SOLSTICE 1 is on the Upper Atmosphere Research Satellite (UARS), and the overall design and operation of the instrument are discussed. The quality of the solar and stellar data is extremely high and preliminary results indicate that the technique is working well.

Rottman, Gary J.

TRUST: TDRSS Resource User Support Tool

TRUST-TDRSS (Tracking Data and Relay Satellite System) Resource User Support Tool is presented in the form of the viewgraphs. The following subject areas are covered: TRUST development cycle; the TRUST system; scheduling window; ODM/GCMR window; TRUST architecture; surpass; and summary.

Sparn, Thomas P.

Distributed planning and scheduling for instrument and platform operations

Distributed planning and scheduling for instruments and platform operations in resource constrained environments are discussed. NASA has repeatedly faced the situation of multiple users having differing goals, objectives, and requirements interacting with a planning and scheduling system. Current examples include the Hubble Space Telescope and Space Station Freedom. The paper provides a brief description of the instrument and platform operations domain, discusses both traditional and distributed planning and scheduling in the context of this domain, and looks at examples of NASA environments in which planning and scheduling is or will be performed in a distributed system.

Hull, Larry G.

SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

Thalman, Nancy E.

Concepts in Distributed Scheduling and Control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling and control must allow for: interactive, realtime, remote operations; responsive scheduling and rescheduling; support of the full range of distributed science, application and commercial users; interaction and cooperation among distributed users; and efficient use of on-board, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe an approach to distributed planning, scheduling and control functions that is based on resources and on a distributed knowledge hierarchy. We describe these functions as components of an integrated management system. We discuss automated scheduling assistants and integration of planning and scheduling functions with realtime operations control. The suggested approach, taken from a users' point-of-view, has resulted in the Science User Resource Planning and Scheduling System (SURPASS). In this paper, we describe the major components of SURPASS and discuss the features of this innovative prototype. Further ideas concerning instrument planning, scheduling, and control may be found in the Space Station Instrument Control System Study.

Hansen, Elaine R.