Engineering Papers⌕ Search

Engineering topics

Somers, Alex

Publications and source records attributed to Somers, Alex.

Fusion Fuel Cycle Technology Downselection Methodology

Tritium Start-up Inventory Requirements Current consensus has full inventory coming from CANDU reactors. • Assumes continued operation through 2035, yielding ~30 kg tritium. • Produced in the form of DTO, which requires separation for tritium extraction. • ITER will take between 10-20 kg. • DEMO will require ~15 kg. • Fuel cycle design requires minimum volume to fill plumbing in system beyond inventory necessary to reach break even. • With ~45 current private ventures, need massive uptick in tritium production to meet global need.

Malone, Collin↗