Engineering Papers⌕ Search

Engineering topics

Solyak, N.

Publications and source records attributed to Solyak, N..

Beam Dynamics simulations for ERDC project -- SRF linac for industrial use

Compact conductively cooled SRF industrial linacs can provide unique parameters of the electron beam for industrial applications. (up to 10MeV, 1MW). For ERDC project we designed normal conducting RF injector with thermal RF gridded gun integrated in first cell of multi-cell cavities. For design of the RF gun we used MICHELLE software to simulate and optimize parameters of the beam. Output file was converted to ASTRA format and most beam dynamic simulations in multi-cell normal conducting cavity and cryomodule were performed by using ASTRA software. For cross-checking we compare results of MICHELLE and AS-TRA in first few cells. At the end of injector beam reach ~250keV energy which allow to trap bunch in acceleration regime without losses in TESLA like 1.3 GHz cavity. Short solenoid at the end of injector allow to regulate transverse beam size in cryomodule to match beam to extraction system and also reduce charge losses in accelerator.

43 PARTICLE ACCELERATORS↗

Gridded RF Gun Design for SRF Linac Applications

The thermionic gridded gun is described which generates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavity of the 250 keV injector [1] for the 20 kW, 10 MeV, 1.3 GHz CW conduction cooled one-cavity linac. The beam current is 2 mA. The RF gun design is presented as well as the results of perveance measurements, which are in a good agreement with the design parameters. The design of the RF resonator of the gun is presented also. The beam generated by the gun is matched to the injector to provide lack of current interception in the SRF cavity.

43 PARTICLE ACCELERATORS↗

PIP-II High Beta 650 Prototype Cryomodule Assembly Experience and Related Design Optimization

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

Ozelis, J.↗

GRIDDED RF GUN DESIGN FOR SRF LINAC APPLICATIONS

The thermionic gridded gun is described which gener-ates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavity of the 250 keV injector [1] for the 20 kW, 10 MeV, 1.3 GHz CW conduction cooled one-cavity linac. The beam current is 2 mA. The RF gun design is presented as well as the results of perveance measure-ments, which are in a good agreement with the design parameters. The design of the RF resonator of the gun is presented also. The beam generated by the gun is matched to the injector to provide lack of current inter-ception in the SRF cavity.

Gonin, I.↗

Beam Optics Design of a Prototype 20 KW Conduction-cooled SRF Accelerator for Medical Sterilization

Superconducting technology has significantly advanced the capabilities of particle accelerators, facilitating higher beam-power operations for fundamental research at a comparatively lower cost. However, the conventional implementation of superconducting technology introduces complexities in the form of cryogenic plants, cryogenic distribution systems and substantial construction and operational cost. In response to these challenges, recent research efforts at Fermilab have been dedicated to the development of a cryogen-free, conduction-cooled Nb3Sn-based superconducting technology. This paper outlines the beam optics design of a 20-kW conduction-cooled compact superconducting accelerator for medical sterilization. The paper reviews both the physics and practical constraints associated with high beam-power operation within the context of industrial applications. The focus is on providing insights into the potential of this innovative technology to overcome existing challenges and pave the way for more accessible and efficient industrial particle accelerators.

43 PARTICLE ACCELERATORS↗

Future high energy colliders and options for the U.S.

The United States has a rich history in high energy particle accelerators and colliders — both lepton and hadron machines, which have enabled several major discoveries in elementary particle physics. To ensure continued progress in the field, U.S. leadership as a key partner in building next generation collider facilities abroad is essential; also critically important is to prepare to host an energy frontier collider in the U.S. once the construction of the LBNF/DUNE project is completed. In this paper, we briefly discuss the ongoing and potential U.S. engagement in proposed collider projects abroad and present a number of future collider options we have studied for hosting an energy frontier collider in the U.S. Further, we also call for initiating an integrated national R&D program in the U.S. now, focused on future colliders.

43 PARTICLE ACCELERATORS↗

An 8 GeV linac as the Booster replacement in the Fermilab Power Upgrade

Increasing the Main Injector beam power above ~ 1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In this paper, we consider an 8 GeV linac Booster replacement that produces 8 GeV H$^{-}$ beam for injection into the Recycler Ring or Main Injector. This upgrade will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation frontier experiments. The 8 GeV linac takes ~ 1 GeV beam from the PIP-II Linac and accelerates it to ~ 2 GeV in a650 MHz superconducting RF linac, followed by a ~ 2 to 8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in superconducting RF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed, including use of an8 GeV Accumulator Ring. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

43 PARTICLE ACCELERATORS↗

Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab

Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Testing and Processing of Pre-production 325 MHz Single Spoke Resonator Power Couplers for PIP-II Project

Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested couplers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.

43 PARTICLE ACCELERATORS↗

Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for PIP-II at FNAL

The PIP-II Project will see international shipment of cryomodules Proton Improvement Plan-II from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which will see stresses during an excitation event. Since the antenna design is new, and because of the setback failure would create, a cyclic stress test was devised for the antenna. This paper presents the experimental methods, setup, and results of the test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Testing of PIP-II pre-production 650 MHz couplers in warm test stand and in cryomodule

650 MHz fundamental power couplers were developed for PIP-II project to deliver RF power for low-beta and high-beta elliptical cavities. Few prototypes were built and tested and after some modification we built 8 pre-production couplers (with few spares for vacuum side) for HB650 cryomodule. All couplers were successfully tested in pulse mode (up to 100kW) and in CW mode (up to 50kW) in test stand at full reflection at 8 phases. In baseline configuration with DC bias we do not see any multipactoring activity after short processing. We also tested power processing without bias for uncoated and TiN coated ceramic window. Results of these studies presented in this paper. One of the coupler was assembled on LB650 cavity and tested at cryogenic environment in STC cryostat at ~20kW power with full reflection at different reflection phase. We also demonstrated good result from power processing without bias for warm and cold cavity. Six couplers were assembled on HB650 cavities in pre-production cryomodule. Test results from cryomodule qualification is discussing in this paper.

43 PARTICLE ACCELERATORS↗

TESTING AND PROCESSING OF PRE-PRODUCTION 325 MHZ SINGLE SPOKE RESONATOR POWER COUPLERS FOR PIP-II PROJECT

Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project [1]. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested couplers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗