Engineering Papers⌕ Search

Engineering topics

Smith, Rhett

Publications and source records attributed to Smith, Rhett.

21 records · Page 2

Secure Control Systems for the Energy Sector

The Padlock Project is an alliance between Tennessee Valley Authority (TVA), Sandia National Laboratories (SNL), and Schweitzer Engineering Laboratories Inc. (SEL). SEL is the prime contractor on the Padlock project. Rhett Smith (SEL) is the project director and Adrian Chaves (SNL) and John Stewart (TVA) are principle investigators. SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. The Tennessee Valley Authority, a corporation owned by the U.S. government, provides electricity for 9 million people in parts of seven southeastern states at prices below the national average. TVA, which receives no taxpayer money and makes no profits, also provides flood control, navigation and land management for the Tennessee River system and assists utilities, and state and local governments with economic development.

54 ENVIRONMENTAL SCIENCES↗

Secure Control Systems for the Energy Sector

Schweitzer Engineering Laboratories (SEL) will conduct the Hallmark Project to address the need to reduce the risk of energy disruptions because of cyber incidents on control systems. The goals is to develop solutions that can be both applied to existing control systems and designed into new control systems to add the security measures needed to mitigate energy network vulnerabilities. The scope of the Hallmark Project contains four primary elements: 1. Technology transfer of the Secure Supervisory Control and Data Acquisition (SCADA) Communications Protocol (SSCP) from Pacific Northwest National Laboratories (PNNL) to Schweitzer Engineering Laboratories (SEL). The project shall use this technology to develop a Federal Information Processing Standard (FIPS) 140-2 compliant original equipment manufacturer (OEM) module to be called a Cryptographic Daughter Card (CDC) with the ability to directly connect to any PC enabling that computer to securely communicate across serial to field devices. Validate the OEM capabilities with another vendor. 2. Development of a Link Authenticator Module (LAM) using the FIPS 140-2 validated Secure SCADA Communications Protocol (SSCP) CDC module with a central management software kit. 3. Validation of the CDC and Link Authenticator modules via laboratory and field tests. 4. Creation of documents that record the impact of the Link Authenticator to the operators of control systems and on the control system itself. The information in the documents can assist others with technology deployment and maintenance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lemnos Interoperable Security Program

The manner in which the control systems are being designed and operated in the energy sector is undergoing some of the most significant changes in history due to the evolution of technology and the increasing number of interconnections to other system. With these changes however come two significant challenges that the energy sector must face; 1) Cyber security is more important than ever before, and 2) Cyber security is more complicated than ever before. A key requirement in helping utilities and vendors alike in meeting these challenges is interoperability. While interoperability has been present in much of the discussions relating to technology utilized within the energy sector and especially the Smart Grid, it has been absent in the context of cyber security. The Lemnos project addresses these challenges by focusing on the interoperability of devices utilized within utility control systems which support critical cyber security functions. In theory, interoperability is possible with many of the cyber security solutions available to utilities today. The reality is that the effort required to achieve cyber security interoperability is often a barrier for utilities. For example, consider IPSec, a widely-used Internet Protocol to define Virtual Private Networks, or tunnels , to communicate securely through untrusted public and private networks. The IPSec protocol suite has a significant number of configuration options and encryption parameters to choose from, which must be agreed upon and adopted by both parties establishing the tunnel. The exercise in getting software or devices from different vendors to interoperate is labor intensive and requires a significant amount of security expertise by the end user. Scale this effort to a significant number of devices operating over a large geographical area and the challenge becomes so overwhelming that it often leads utilities to pursue solutions from a single vendor. These single vendor solutions may inadvertently lock utilities into proprietary and closed systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗