NASA Marshall Space Flight Center Human Factors Engineering Analysis of Various Hatch Sizes
No abstract available
Engineering topics
Publications and source records attributed to Smith, John.
No abstract available
US ITER, with General Atomics and other industry partners, is now fabricating the heart of the ITER tokamak: The 60 foot tall central solenoid. This massive electromagnet will initiate and maintain plasma current in the international ITER fusion reactor now under construction in France. ITER is the first fusion device designed to produce a burning plasma--an essential step for fusion energy development. This short offers an inside view of the action at the GA Magnet Technologies Center in California where the central solenoid modules are being produced.
The fabrication of the modules for the ITER Central Solenoid (CS) has started in a dedicated production facility located in Poway, California, USA. The necessary tools have been designed, built, installed, and tested in the facility to enable the start of production. The current schedule has first module fabrication completed in 2017, followed by testing and subsequent shipment to ITER. The Central Solenoid is a key component of the ITER tokamak providing the inductive voltage to initiate and sustain the plasma current and to position and shape the plasma. The design of the CS has been a collaborative effort between the US ITER Project Office (US ITER), the international ITER Organization (IO) and General Atomics (GA). GA’s responsibility includes: completing the fabrication design, developing and qualifying the fabrication processes and tools, and then completing the fabrication of the seven 110 tonne CS modules. The modules will be shipped separately to the ITER site, and then stacked and aligned in the Assembly Hall prior to insertion in the core of the ITER tokamak. A dedicated facility in Poway, California, USA has been established by GA to complete the fabrication of the seven modules. Infrastructure improvements included thick reinforced concrete floors, a diesel generator for backup power, along with, cranes for moving the tooling within the facility. The fabrication process for a single module requires approximately 22 months followed by five months of testing, which includes preliminary electrical testing followed by high current (48.5 kA) tests at 4.7K. The production of the seven modules is completed in a parallel fashion through ten process stations. The process stations have been designed and built with most stations having completed testing and qualification for carrying out the required fabrication processes. The final qualification step for each process station is achieved by the successful production of a prototype coil. Fabrication of the first ITER module is in progress. The seven modules will be individually shipped to Cadarache, France upon their completion. This paper describes the processes and status of the fabrication of the CS Modules for ITER.
Dawn, a mission belonging to NASA’s Discovery Program, was launched on September 27, 2007 to explore two objects in the main asteroid belt in order to yield insights into important questions about the formation and evolution of the solar system. Successfully completing all mission objectives at Vesta, Dawn arrived at dwarf planet Ceres in March 2015 and continued its journey to a series of four near circular polar science orbits. Dawn became the first mission to orbit around two extraterrestrial targets; such a mission would have been impossible without the low thrust ion propulsion system (IPS). Maneuvering a spacecraft using only the IPS for the transfers between the mapping orbits posed many technical challenges to Dawn’s flight team at NASA’s Jet Propulsion Laboratory. Failure of the second reaction wheel assembly, shortly before leaving Vesta, added another challenge for Dawn’s flight team. This paper discusses the mission design and navigational experience and challenges during Dawn’s Ceres operations.
Mercury remediation is a high priority for the US Department of Energy (DOE) Oak Ridge Office of Environmental Management (OREM) because of large historical losses of mercury within buildings and to soils and surface waters at the Y-12 National Security Complex (Y-12). Because of the extent of mercury losses and the complexities of mercury transport and fate in the downstream environment, the success of conventional options for mercury remediation in lower East Fork Poplar Creek (EFPC) is uncertain. A phased, adaptive management approach to remediation of surface water includes mercury treatment actions at Y-12 in the short-term and research and technology development (TD) to evaluate longer-term solutions in the downstream environment (US Department of Energy 2014b).
Explore the source record for details and available documents.
Due to the highly successful execution of the Cassini-Huygens prime mission and the estimated propellant remaining at the conclusion of the prime mission, NASA Headquarters allocated funding for the development of a 2-year long Cassini extended mission. The resultant extended mission, stemming from 1.5 years of development, includes an additional 26 targeted Titan flybys, 9 close flybys of icy satellites, and 60 orbits about Saturn. This paper describes, in detail, the different phases of the Cassini extended mission and the associated design methodology, which attempted to maximize the number and quality of high-priority scientific objectives while minimizing the total delta v expenditure and adhering to mission-imposed constraints.