Engineering Papers⌕ Search

Engineering topics

Smith, Dan

Publications and source records attributed to Smith, Dan.

20 records · Page 2

Efficient mission control for the 48-satellite Globalstar Constellation

The Globalstar system is being developed by Globalstar, Limited Partnership and will utilize 48 satellites in low earth orbit (See Figure 1) to create a world-wide mobile communications system consistent with Vice President Gore's vision of a Global Information Infrastructure. As a large long term commercial system developed by a newly formed organization, Globalstar provides an excellent opportunity to explore innovative solutions for highly efficient satellite command and control. Design and operational concepts being developed are unencumbered by existing physical and organizational infrastructures. This program really is 'starting with a clean sheet of paper'. Globalstar operations challenges can appear enormous. Clearly, assigning even a single person around the clock to monitor and control each satellite is excessive for Globalstar (it would require a staff of 200! . Even with only a single contact per orbit per satellite, data acquisitions will start or stop every 45 seconds! Although essentially identical, over time the satellites will develop their own 'personalities'and will re quire different data calibrations and levels of support. This paper discusses the Globalstar system and challenges and presents engineering concepts, system design decisions, and operations concepts which address the combined needs and concerns of satellite, ground system, and operations teams. Lessons from past missions have been applied, organizational barriers broken, partnerships formed across the mission segments, and new operations concepts developed for satellite constellation management. Control center requirements were then developed from the operations concepts.

Smith, Dan↗

The Enabler: A reevaluation of design concepts and construction of a scaled model

The basic objective of the student's work this quarter was to make an in depth examination of the design concepts used on the lunar vehicle 'The Enabler'. Several changes were made to the vehicle including a redesigned wheel, a more compact boom and a reduced articulation angle. The vehicle's final dimensions were determined through an optimization process by defining mathematical equations for several of the vehicle's defined objectives. These included the ability to scale a one meter object, traverse a one meter crevice, and maintain a wheel-to-wheel clearance of three inches while at maximum articulation. The final dimensions of the vehicle were used to construct an approximate 1/4 scale model of the chassis and wheels. The boom, however, was constructed on a 1/5 scale (from the original design). This was due to the redesign of the boom and the limitations of the constructing material and PVC fittings.

Bess, David↗