United States–Brazil Joint Study: A Preliminary Assessment of Opportunities and Challenges for Small Modular Reactors in Brazil

This report supplies the technical information to enable a broader understanding of different technology choices for nuclear reactors in Brazil. The assessment characteristics of this process include reactor technology, economic costs for deployment, and regulatory analyses of small modular reactors, advanced reactors, and microreactors. The analysis documented in this report provides economic and technological information to assist Brazil, whose official indicative scenarios show an increase in operating nuclear power from 2 Gigawatt in 2022 to 8–10 Gigawatt by 2050, in policy making and long-term energy planning. To protect company proprietary information, the information in this report was limited to publicly available information and therefore can only inform preliminary reactor technology assessments. This report does not recommend or endorse any specific reactor developer or technology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Research to Develop Flood Barrier Testing Strategies for Nuclear Power Plants

The U.S. Nuclear Regulatory Commission has developed regulations regarding the siting and design of nuclear power plants (NPPs) that are aimed at addressing various natural hazards, including flooding. Flood barriers are designed to prevent water from entering NPP areas containing structures, systems, and components (SSCs) important to safety. The barriers are used at NPPs along with drains, sumps, pumps, valves, plugs, and site grading as part of the plant flood protection features that protect SSCs from experiencing external or internal flooding and mitigate the effects of flooding on NPP operations. The performance of flood protection features, including flood barriers at NPPs, has been an ongoing concern. Domestic and international operational experience provides clear indications that flood barrier performance has significant safety implications, especially for aging NPPs. The observed deficiencies show that flood barriers should be designed and installed properly, then adequately tested, inspected, and maintained in order to ensure that they perform their intended functions during flooding events. Here, this paper reviews available information related to flood barriers employed at U.S. NPPs and provides an overview and categorization of NPP flood barriers. It identifies potential domestic and international flood barrier testing facilities, including operating and decommissioned U.S. NPPs. Finally, this paper presents the technical and logistical considerations that should be made when developing specific testing strategies and protocols for flood barriers, such as the selection of flood barriers, test locations, testing approach, performance criteria, and testing parameters.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Scenario Exploration and Timeline Analysis for Advanced Reactors [Slides]

Slides created to discuss the report "Approach and Model Used to Represent a Timeline Analysis for Security Design Enhancements" (August 2022 INL/ RPT-22-68664) for an upcoming DOE security workshop. Advanced reactors will be able to use risk insights for many design aspects. We need realistic scenarios for input into the licensing basis safety-case. These scenarios must include timing and physics. We need to automate the safety-case creation as much as possible.

97 MATHEMATICS AND COMPUTING↗

Approach and Model Used to Represent a Timeline Analysis for Security Design Enhancements

Next-generation reactors will be able to use risk to inform and performance base the licensing of many aspects of the reactor, facility, and site design, including attributes of physical security. There are several factors related to security, including site topography, reactor design, and physical protection system components, to consider when designing the physical protection system into the overall facility design and plan of operation. With the versatility of advanced reactors, especially micro reactors, methods are needed to simplify and quickly evaluate potential timelines for designing a site configuration. This report describes an approach to generate qualitative and quantitative insights using a risk-informed simulation. The modeling process is described in detail, focusing on three aspects: (1) the facility mission time (the time required to control the plant until safe), (2) the attacker timeline (the time to potential sabotage), and (3) the response timeline (the time to counter the facility attack). The modeling capabilities also are extended to include facility physical phenomena such as thermal-hydraulics and heat transfer to capture realistic representation of dynamic changes to a facility. While the plant models and examples are hypothetical and do not represent a real facility, these modeling approaches could be used for future security-by-design engineering in advanced reactors. The outputs and insights from the modeling approach may be used to modify and optimize the security posture of a facility by efficiently making modifications to the model and seeing the overall impact from the modification. Lastly, use of the approach described in this report can also provide the technical basis for a physical protection program, describing how the facility and security strategy will cope with off-normal events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Characteristics of U.S. Energy Production using Nuclear Fission

When considering potential energy production technologies for the future, a critical consideration centers on the question of “how green” the technology is. Here, the word “green” implies that the technology has a zero or minimal impact on the public and environment while still providing benefits by way of electricity, heat, and other products such as hydrogen and water. And, these potential impacts must be considered over the lifecycle of the technology deployment, from design, construction, operation, and disposition. Ideally, a green energy technology would be net-zero (i.e., having no to almost negligible contribution) on five key elements: 1. Greenhouse gas emissions, including carbon dioxide (CO 2 ), methane, nitrous oxide, and fluorinated gases such as ozone-depleting gases 2. Water consumption 3. Material resource consumption 4. Disposition of wastes 5. Public, flora, and fauna safety including deaths, health, and environmental impacts. Society would benefit from net-zero impacts of the five elements above while having low-cost energy. As society starts to replace fossil fuels in the energy mix, we need to consider the possible impacts of adopted technologies. We need a production approach that provides large quantities of energy while being safe, reliable, economical, and sustainable. In this report, we describe a variety of characteristics related to the five elements above to provide a fact-supported, science-based depiction of nuclear fission as an energy providing technology. By better understanding how fission power is nearly net-zero in the five elements above, we can position our thinking to align with the overarching goal to provide society with a low-impact energy source.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Research to Develop Flood Barrier Testing Strategies for Nuclear Power Plants

This report presents results of research performed by Idaho National Laboratory (INL) for the Nuclear Regulatory Commission (NRC) to identify and develop strategies for testing nuclear power plant (NPP) flood barriers. This research project began with a literature review that documented the results of previous NRC-funded research, work performed by other government agencies, reports generated by industry organizations, NRC licensee submittals, information from testing facilities, and information from commercial firms engaged in NPP decommissioning. This literature review was then used to develop a simplified flood protection categorization scheme and related glossaries. Using this categorization scheme and glossaries, a survey of currently used flood barriers was conducted, focusing on both permanent and temporary flood barriers. External flood barriers such as levees and berms were outside the scope of this survey. This research project also assessed the current state of NPP decommissioning for potential flood barrier harvesting opportunities, surveyed capabilities of domestic and international flood testing facilities, and explored technical challenges to harvesting and testing of flood barriers. Other factors that should be considered in developing flood barrier testing strategies were also explored and are documented in this report (e.g., selection of flood barriers for testing, codes and standards for flood barrier testing, potential alternatives to harvesting such as in-situ testing, testing performance criteria, and testing parameters).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhancement of Industry Legacy Probabilistic Risk Assessment Methods and Tools

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improvement in quantification speed, increased ability to efficiently model multi-hazard models, and improvement in modeling human action dependency in PRA. This report provides the outcomes from the FY2021 research into these three areas, identifying potential technical gaps and solutions, and charting the next steps forward to address current PRA challenges.

42 ENGINEERING↗

Feasibility Study of Developing Alternative Common-Cause Failure Model for Event Assessment

This report is a revision of the original report, INL/LTD-14-33376. The original report, which was a limited distribution to the Nuclear Regulatory Commission (NRC) only and not available to the public, was revised as this report for public distribution. The report presents the feasibility study of alternative common-cause failure (CCF) models that could be used for event assessment in the Standardized Plant Analysis Risk (SPAR) models. The current CCF model used by the SPAR models is the alpha factor model. The proposed alternative CCF models are the partial alpha factor model and general dependency model. These alternative CCF models are reviewed and compared to the current alpha factor model, with the partial alpha factor model being identified as the preferred CCF model that could be used for event assessment in the SPAR models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Treatment of uncertainties for security-related design aspects of advanced reactors when using a risk-informed licensing approach

Sabotage of nuclear plants and theft of special nuclear material are different from many other issues potentially affecting public health and safety, and some of those differences drive the content of the present report. A high-level indication of these differences is provided in the US Nuclear Regulatory Commission’s Safety Goal Policy. Promulgated in the mid-1980’s, when it had become reasonably clear that risk analysis had improved to the point where it was possible to understand the risks associated with plant operation, the Safety Goal Policy articulates qualitative safety goals and quantitative health objectives that are meant to guide regulatory and risk management activities, with the following key exceptions noted in the original policy statement: The possible effects of sabotage or diversion of nuclear material are also not presently included in the safety goals. At present there is no basis on which to provide a measure of risk on these matters. It is the Commission’s intention that everything that is needed will be done to keep these types of risks at their present very low level; and it is the Commission’s expectation that efforts on this point will continue to be successful. With these exceptions, it is the Commission’s intent that the risks from all the various initiating mechanisms be considered to the best of the capability of current evaluation techniques. The present report discusses extensions of classical risk management to address some of the special issues that arise in the context of security. Although the present emphasis is on physical security, some attention will be paid to cyber security. A particular focus of the report is on quantitative framework to manage and address uncertainties. This framework is demonstrated via a couple of hypothetical examples.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Generic Pressurized Water Reactor Model for SAPHIRE

Generic Pressurized Water Reactor Model for SAPHIRE This report contains a data dump from a SAPHIRE Generic Pressurized Water Reactor (PWR) model. The intent is to have this information reviewed for export control and classification so that the generic model can be used external to INL. The facility model is not applicable to any existing nuclear reactors. The Generic PWR model does not represent any existing power plant and was created to support research and training purposes. Three distinct types of data are used to create a SAPHIRE risk model: - Event trees representing typical PWR sequences - Fault trees representing generic system performance - Basic events (e.g., component failure information) Where possible, we have taken information from publicly available documents and referenced that information tagged to a specific item.

99 GENERAL AND MISCELLANEOUS↗

Multicriterion benefit evaluation methodology for safety enhancements in nuclear power plants and application for FLEX strategies

Here we propose a multicriterion benefit evaluation (MCBE) methodology for evaluating costs and benefits of implementing safety enhancements in nuclear power plants. The MCBE methodology establishes a comprehensive evaluation scope using multiple evaluation criteria (including public risk, occupational risk, plant revenue, and plant cost) and multiple contexts (including plant normal operations, incidents, and accidents). The MCBE methodology formulates a benefit or cost element as the product of a monetary consequence and its occurrence-likelihood change. The MCBE methodology also incorporates a decision maker’ preferences toward occurrence likelihood and monetary consequence into cost and benefit estimations through a modified usage of cumulative prospect theory. This paper applies the MCBE methodology to the implementation of diverse and flexible coping strategy (FLEX) in a generic nuclear power plant as an illustrative example. The FLEX benefits are evaluated through three types of influence paths: plant safety enhancement, risk-informed activities, and potential additional credit of FLEX in supporting plant operation and maintenance-efficiency improvement. The benefit-to-cost ratio (BCR) of FLEX implementation is calculated. Sensitivity analyses are conducted to examine the impacts of modeling assumptions and input parameter values on the BCR.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Linking classical PRA models to a dynamic PRA

Here, this paper presents a series of methods designed to incorporate classical Probabilistic Risk Assessment (PRA) models such as Event Trees (ETs) and Fault Trees (FTs) into dynamic PRA. In contrast to classical PRA, dynamic PRA couples stochastic methods with system simulators to determine the risks associated with complex systems such as nuclear power plants. Compared with classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the progression of the accident. As part of a dynamic PRA analysis, it is not uncommon that parts of the system to be analyzed might not require a computationally expensive simulation model. These parts could be in fact modeled by employing classical PRA models (e.g., a FT). Here, we present a set of methods and tools that can be used to link the most common classical PRA models (ETs, FTs, reliability block diagrams and Markov models) to simulation codes such as RELAP5-3D: creating a “hybrid PRA.” In order to show the potential of such an hybrid PRA we employ this method to verify ET modeling assumptions (e.g., success criteria) using a large break loss of coolant accident initiating event as a test case. In this respect, we link a set of FTs from the original PRA to the RELAP5-3D code and perform a hybrid PRA. The FTs are employed to model the control logic of several safety systems and to propagate component failures throughout the system. Provided the generated dynamic PRA data, we show how conservative assumptions in the original PRA can be identified and how such original PRA can be modified by updating success criteria captured by the set of RELAP5-3D simulation runs.

97 - MATHEMATICS AND COMPUTING↗

Summary of Nuclear Regulatory Commission Flood Barrier Testing Strategies Workshop

The United States Nuclear Regulatory Commission (NRC) and Idaho National Laboratory (INL) organized a half-day workshop on flood barrier testing strategies (FBTS) at NRC Headquarters in Rockville, MD, via a webinar as well, on March 12, 2020. The workshop was a public meeting attended by members of the public and staff from NRC, INL, and other agencies. The workshop served multiple objectives: (1) present preliminary research results from the FBTS research project conducted by INL for NRC, and (2) engage industry stakeholders and technical experts to provide inputs and insights on testing strategies. This letter report documents the materials presented, participant questions and answers, and summaries of an open discussion during this FBTS workshop.

99 GENERAL AND MISCELLANEOUS↗

A computational risk assessment approach to the integration of seismic and flooding hazards with internal hazards

Probabilistic risk assessment (PRA) of nuclear power plants historically focuses on internal events at the plant, rather than external hazards. Although the importance of external hazards risk analysis is now well recognized, the methods for assessing the risk associated with low probability external hazards rely heavily on subjective judgment of specialists, often using conservative elements in the analysis, as is the case with the Conservative Deterministic Failure Margin approach commonly used for seismic PRA. The U.S. Department of Energy Light Water Reactor Sustainability program has been investigating the use of first principles analyses to provide a more realistic assessment of the risk of external hazards, in a process called computational risk assessment (CRA). Efforts undertaken are described in the development of CRA methods to integrate the risk associated with seismic and flooding events into traditional PRA. Further, the results of four case studies are presented.

99 GENERAL AND MISCELLANEOUS↗

Domestic Nuclear Power Plant Physical Security Reevaluation – High Level Project Plan

The goal for this effort is a validated method which can be used to implement an updated physical security regime to optimize the physical security at domestic nuclear power plants (existing and future). It is the intent for the evaluation recommendations to provide the technical basis for an optimized plant security posture, which could consider reduce conservatisms in that posture, and potentially reduce security costs for the nuclear industry while meeting all security requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mars 2020 Risk Integration and Uncertainty Working Group Status Report, FY 2017

This report provides a list of accomplishments of the Mars 2020 Risk Integration and Uncertainty Working Group for the fiscal year 2017 which includes participation in the Technical Information Meeting #2, review and comments on the methodologies and results provided in the Mars 2020 Safety Analysis Report (SAR) Draft Databook, development of a Probabilistic Risk Assessment model in the risk assessment program SAPHIRE using the data provided in the SAR Databook, and an independent launch risk analysis based on the Mars 2020 launch vehicle’s lineage and design similarity to other launch vehicles.

99 GENERAL AND MISCELLANEOUS↗

DYNAMIC PRA WITH COMPONENT AGING AND DEGRADATION MODELED UTILIZING PLANT RISK MONITORING DATA

In the nuclear industry, risk monitors are intended to provide a point-in-time estimate of the system risk given the current plant configuration. Current risk monitors are limited in that they do not properly take into account the deteriorating states of plant systems, structures, and components (SSCs), which are unit-specific. Current approaches to computing risk monitors use probabilistic risk assessment (PRA) techniques, but the assessment is typically a snapshot in time. Living PRA models attempt to address limitations of traditional PRA models in a limited sense by including temporary changes in plant and system configurations. However, information on plant component health are not considered. This often leaves risk monitors using living PRA models incapable of conducting evaluations with dynamic degradation scenarios evolving over time. There is a need to develop enabling approaches to solidify risk monitors to provide time and condition-dependent risk by integrating traditional PRA models with condition monitoring and prognostic techniques [1]. This paper presents a novel hazard-rate based model of incorporating degradation of nuclear SSCs into an existing PRA model. Time-varying instantaneous hazard-rate of component is used to model degradation based on time-varying performance measure. The instantaneous hazard-rate is used to determine and update time-varying probability of failure of the components in their PRA models. The method is applied to estimate evolution of probability of failure of an in-service pump using vibration measurement taken while the pump undergoes degradation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗