Engineering PapersSearch

Engineering topics

Sherwood, Rob

Publications and source records attributed to Sherwood, Rob.

26 records · Page 2

Flight Validation of On-Demand Operations: The Deep Space One Beacon Monitor Operations Experiment

After a brief overview of the operational concept, this paper will provide a detailed description of the _as-flown_ flight software components, the DS1 experiment plan, and experiment results to date. Special emphasis will be given to experiment results and lessons learned since the basic system design has been previously reported. Mission scenarios where beacon operations is highly applicable will be described. Detailed cost savings estimates for a sample science mission will be provided as will cumulative savings that are possible over the next fifteen years of NASA missions.

Wyatt, Jay

Using ASPEN to Automate EO-1 Activity Planning

This paper describes the application of an automated planning and scheduling system to the NASA Earth Orbiting 1 (EO-1) mission. The planning system, ASPEN, is used to autonomously schedule the daily activites of the satellite. The satellite and operations constraints are encoded within a software model used by the planner.

Automated

Using Iterative Repair to Increase the Responsiveness of Planning and Scheduling for Autonomous Spacecraft

An autonomous spacecraft must balance long-term and short-term considerations. It must perform purposeful activities that ensure long-term science and engineering goals are achieved and ensure that it maintains positive resource margins. This requires planning in advance to avoid a series of shortsighted decisions that can lead to failure, However, it must also respond in a timely fashion to a somewhat dynamic and unpredictable environment. Thus, spacecraft plans must often be modified due to fortuitous events such as early completion of observations and setbacks such as failure to acquire a guidestar for a science observation. This paper describes the use of iterative repair to support continuous modification and updating of a current working plan in light of changing operating context.

Chien, Steve

Lessons Learned During Implementation and Early Operations of the DS1 Beacon Monitor Experiment

A new approach to mission operations will be flight validated on NASA's New Millennium Program Deep Space One (DS1) mission which launched in October 1998. The Beacon Monitor Operations Technology is aimed at decreasing the total volume of downlinked engineering telemetry by reducing the frequency of downlink and the volume of data received per pass. Cost savings are achieved by reducing the amount of routine telemetry processing and analysis performed by ground staff. The technology is required for upcoming NASA missions to Pluto, Europa, and possibly some other missions. With beacon monitoring, the spacecraft will assess its own health and will transmit one of four beacon messages each representing a unique frequency tone to inform the ground how urgent it is to track the spacecraft for telemetry. If all conditions are nominal, the tone provides periodic assurance to ground personnel that the mission is proceeding as planned without having to receive and analyze downlinked telemetry. If there is a problem, the tone will indicate that tracking is required and the resulting telemetry will contain a concise summary of what has occurred since the last telemetry pass. The primary components of the technology are a tone monitoring technology, AI-based software for onboard engineering data summarization, and a ground response system. In addition, there is a ground visualization system for telemetry summaries. This paper includes a description of the Beacon monitor concept, the trade-offs with adapting that concept as a technology experiment, the current state of the resulting implementation on DS1, and our lessons learned during the initial checkout phase of the mission. Applicability to future missions is also included.

Sherwood, Rob

ASPEN: EO-1 Mission Activity Planning Made Easy

This paper describes the application of an automated planning and scheduling system to the NASA Earth Orbitin 1 (EO-1) missions. The planning system, ASPEN, is used to autonomously schedule the daily activites of the satellite.

ASPEN Activity Planning

An Overview of the Beacon Monitor Operations Technology

This paper summarizes the end-to-end design of a technology for low cost mission operations. Cost savings is achieved by reducing the total volume of downlinked engineering telemetry by decreasing the frequency of telemetry acquisition and the volume of data received per pass.

Cost Deep Space One Mission beacon monitor