Sherman, Steven R

Publications and source records attributed to Sherman, Steven R.

Analysis of Operating Strategies Using Different Target Designs For 238Pu Production

An engineering effort is underway to re-establish capability to produce 238Pu oxide at the kilogram scale in the United States. A multi-step batch process is being developed to produce this important material. Recently, a portion of this process was studied using discrete-event simulation tools to determine whether the conceptual process might achieve its yearly production goal. The study showed the conceptual process can meet the yearly production goal under some circumstances, but process improvements would be needed to ensure greater likelihood of success. This study extends the work performed previously by examining the effects of changing the reactor target design on the yearly process output. Two new reactor target configurations are considered an aluminum-clad reactor target containing 50% greater 237Np oxide content than the original target, and a zirconium alloy-clad target using no aluminum. The results indicate that use of the new aluminum-clad target configuration may allow the process to achieve the same yearly production goal in less time using fewer targets. If the zirconium alloy-clad target is used, then even fewer targets would be needed to reach the production goal, but some process changes would be required to handle the zirconium cladding. The number of days needed to process a target batch to completion, and the steady state 238Pu oxide production rate, for each configuration are compared to the results from the initial simulation study.

campaign↗

Methods and systems for the production of hydrogen

Methods and systems are disclosed for the production of hydrogen and the use of high-temperature heat sources in energy conversion. In one embodiment, a primary loop may include a nuclear reactor utilizing a molten salt or helium as a coolant. The nuclear reactor may provide heat energy to a power generation loop for production of electrical energy. For example, a supercritical carbon dioxide fluid may be heated by the nuclear reactor via the molten salt and then expanded in a turbine to drive a generator. An intermediate heat exchange loop may also be thermally coupled with the primary loop and provide heat energy to one or more hydrogen production facilities. A portion of the hydrogen produced by the hydrogen production facility may be diverted to a combustor to elevate the temperature of water being split into hydrogen and oxygen by the hydrogen production facility.

08 HYDROGEN↗

Combustion-Assisted CO2 Capture Using MECC Membranes

Mixed Electron and Carbonate ion Conductor (MECC) membranes have been proposed as a means to separate CO2 from power plant flue gas. Here a modified MECC CO2 capture process is analyzed that supplements retentate pressurization and permeate evacuation as a means to create a CO2 driving force with a process assisted by the catalytic combustion of syngas on the permeate side of the membrane. The combustion reactions consume transported oxygen, making it unavailable for the backwards transport reaction. With this change, the MECC capture system becomes exothermic, and steam for electricity production may be generated from the waste heat. Greater than 90% of the CO2 in the flue gas may be captured, and a compressed CO2 product stream is produced. A fossil-fueled power plant using this process would consume 14% more fuel per unit electricity produced than a power plant with no CO2 capture system, and has the potential to meet U.S. DOE s goal that deployment of a CO2 capture system at a fossil-fueled power plant should not increase the cost of electricity from the combined facility by more than 30%.

20 FOSSIL-FUELED POWER PLANTS↗

FY07 Summary of System Interface and Support Systems R&D and Technical Issues Map

This document provides a summary of research and development activities in the System Interface and Support Systems area of the DOE Nuclear Hydrogen Initiative in FY 2007. Project cost and performance data obtained from the PICS system, at least up through July 2007, are presented and analyzed. Brief summaries of accomplishments and references are provided. A mapping of System Interface and Support Systems technical issues versus the work performed is updated and presented. Lastly, near-term research plans are described, and recommendatioins are provided for additional research.

08 HYDROGEN↗

NHI Component Technical Readiness Evaluation System

A decision process for evaluating the technical readiness or maturity of components (i.e., heat exchangers, chemical reactors, valves, etc.) for use by the U.S. DOE Nuclear Hydrogen Initiative is described. This system is used by the DOE NHI to assess individual components in relation to their readiness for pilot-scale and larger-scale deployment and to drive the research and development work needed to attain technical maturity. A description of the evaluation system is provided, and examples are given to illustrate how it is used to assist in component R&D decisions.

08 HYDROGEN↗

NHI Component Technical Readiness Evaluation System

A decision process for evaluating the technical readiness or maturity of components (i.e., heat exchangers, chemical reactors, valves, etc.) for use by the U.S. DOE Nuclear Hydrogen Initiative is described. This system is used by the DOE NHI to assess individual components in relation to their readiness for pilot-scale and larger-scale deployment and to drive the research and development work needed to attain technical maturity. A description of the evaluation system is provided, and examples are given to illustrate how it is used to assist in component R&D decisions.

08 HYDROGEN↗