Shunt-Connected FACTS and Synchronous Condensers

In recent years, the electric-transmission system has undergone a significant transformation marked by a greater integration of renewable-energy sources like wind and solar, the phasing out of thermal generation plants, and a concerted effort towards electrifying energy consumption. To keep pace with the integration of renewable-energy sources and the escalating demands of industries and households, it is imperative to expand and modernize the existing power infrastructure. These upgrades are essential to maintain grid stability, enhance power delivery, and boost overall efficiency of the system. However, challenges have emerged with the growing complexity of power grids, particularly in the realms of voltage control, transient stability, and power-quality management.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Variable Transmission Line Ratings

This paper outlines the concept of variable-transmission facility ratings. This topic is of heightened importance following the recent Federal Energy Regulatory Commission (FERC) Order No. 881 which requires the implementation of ambient adjusted ratings (AARs) for FERC jurisdictional portions of the transmission system. Additionally, FERC issued an Advanced Notice of Proposed Rulemaking (ANOPR) implying a future order on Dynamic Line Rating (DLR) requirements. The various types of facility-rating methodologies will be discussed with a focus on how they can benefit the stability, capacity, and reliability of the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Regional Power System Black Start with Run-of-river Hydropower Plant and Battery Energy Storage

Battery energy storage systems (BESSs) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various critical services to the power grid. This paper presents the real-world experience of using a megawatt-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to restore a regional power system. To demonstrate this, we carry out power-hardware-in-the-loop experiments integrating an actual GFL- or GFM-controlled BESS and a load bank. Both the simulation and experimental results presented in this paper show the different roles of GFL- or GFM-controlled BESS in power system black starts. The results provide further insight for system operators on how GFL- or GFM-controlled BESS can enhance grid stability and how an ROR hydropower plant can be converted into a black-start-capable unit with the support of a small-capacity BESS. The results show that an ROR hydropower plant combined with a BESS has the potential of becoming one of enabling elements to perform bottom-up black-start schemes as opposed to conventional bottom-down method, thus enhancing the system resiliency and robustness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Framework for Addressing Hydropower Modeling Gaps in Electric Grid Planning and Operational Studies [Slides]

Realistic representation of hydropower in power system planning and operation studies is extremely important as it helps in avoiding under/over-estimation of the services the hydro power units can provide. A framework and tools have been developed to account for hydrological conditions and modify power system models accordingly. For example, HyDat – data and AI driven platform, that provides that data required for editing the power system model files Collaborative effort with V&R Energy. Also, development of POM based tools have been performed, a) Tool1: editing .raw files with realistic current and maximum hydrogeneration and redispatch of other units, and b) Tool2: Editing .dyr files to represent water head, current and maximum generation. Finally the framework, HASP framework combines HyDat and V&R energy tools to produce modified power system model files. Key Take-away points from contingency analysis studies include a) the number of critical contingencies increases as the water levels are reduced (70%>75%>80%), and b) both the extent and the quality of dynamic response of the Hydropower unit is different with varying water head levels.

13 HYDRO ENERGY↗