Engineering Papers⌕ Search

Engineering topics

Seryi, A.

Publications and source records attributed to Seryi, A..

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

STATUS OF THE SECOND INTERACTION REGION DESIGN FOR ELECTRON-ION COLLIDER

Provisions are being made in the Electron Ion Collider (EIC) design for future installation of a second Interaction Region (IR), in addition to the day-one primary IR. The envisioned location for the second IR is the existing experi- mental hall at RHIC IP8. It is designed to work with the same beam energy combinations as the first IR, covering a full range of the center-of-mass energy of ?20 GeV to ?140 GeV. The goal of the second IR is to complement the first IR, and to improve the detection of scattered particles with magnetic rigidities similar to those of the ion beam. To achieve this, the second IR hadron beamline features a secondary focus in the forward ion direction. The design of the second IR is still evolving. This paper reports the current status of its pa- rameters, magnet layout, and beam dynamics and discusses the ongoing improvements being made to ensure its optimal performance.

Gamage, B.↗

RESONANT MATCHING SECTION FOR CEBAF ENERGY UPGRADE

Thomas Jefferson National Accelerator Facility (Jeffer- son Lab) currently studies the feasibility of upgrading its energy to 22 GeV. It considers addition of six more linac passes. The highest energy passes will share two new arcs designed using the Fixed-Field Alternating Gradient (FFA) technology. The FFA arcs are built using permanent combined-function magnets. They will be connected to the linacs through transition sections that will match the optics of all six passes to the linacs. With the high number of con- straints and the limited space available, we are investigating a parametric resonance technique to match the optics quasi- independently at each energy. A resonance is excited at each individual energy to selectively control its optics. The reso- nant dipole and quadrupole kick harmonics are imposed for all energies simultaneously using Panofsky corrector mag- nets placed throughout the FFA arcs. This paper presents the current progress on that transition section design

Deitrick, K.↗

STATUS OF THE SECOND INTERACTION REGION DESIGN FOR ELECTRON-ION COLLIDER

Provisions are being made in the Electron Ion Collider (EIC) design for future installation of a second Interaction Region (IR), in addition to the day-one primary IR. The envisioned location for the second IR is the existing experi- mental hall at RHIC IP8. It is designed to work with the same beam energy combinations as the first IR, covering a full range of the center-of-mass energy of ?20 GeV to ?140 GeV. The goal of the second IR is to complement the first IR, and to improve the detection of scattered particles with magnetic rigidities similar to those of the ion beam. To achieve this, the second IR hadron beamline features a secondary focus in the forward ion direction. The design of the second IR is still evolving. This paper reports the current status of its pa- rameters, magnet layout, and beam dynamics and discusses the ongoing improvements being made to ensure its optimal performance.

Gamage, B.↗

Positron beams at Ce+BAF

Positron beams would provide a new and meaningful probe for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab). The JLab Positron Working Group, formed in 2018 and now with over 250 members from 75 institutions, continues to develop an experimental program with high duty-cycle positron beams including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). In this presentation we describe a start-to-end layout for positron beams at 12 GeV CEBAF utilizing the Low Energy Research Facility (LERF) at Jefferson Lab to build two new injectors. A GaAs dc high voltage photo-gun first generates >1 mA of polarized electrons which are then accelerated to 80-150 MeV and directed to a high-power spinning W target for polarized bremsstrahlung and positron pair creation. A second injector then collects, bunches and accelerates the positrons to 123 MeV. The positron beams are transported by a new beam line and injected into the CEBAF acceptance for acceleration to the end stations with energies up to 12 GeV. The layout is optimized to provide Users with positron spin polarization >60% and intensity greater than >100 nA, and with higher intensities when polarization is not required.

Benesch, J.↗

Status of Error Correction Studies in Support of FFA@CEBAF

In pursuit of higher energy at the Continuous Electron Beam Accelerator Facility (CEBAF), the FFA@CEBAF energy upgrade study is considering the implementation of a novel technology to recirculate electron beam through the accelerating gradient of the machine more times. The technology in question is Fixed-Field Alternating-gradient (FFA) bending accelerator arcs: these arcs may replace the present highest energy electromagnetic (EM) arcs, and due to a much wider energy acceptance allow several more passes. The survey and beam error tolerance of the FFA arcs need to be well understood prior to commissioning, in addition to the limits of planned correction magnets and diagnostics. This work explores the current state of error tolerance and correction studies in FFA arcs at CEBAF.

Benesch, J.↗

Proton and electron RLA optics design

We describe optics designs of the key components of proton and electron Recirculating Linear Accelerators (RLAs). They are presented in the context of a high-power hadron accelerator being considered at ORNL and a CEBAF electron energy doubling study, FFA@CEBAF, being developed at Jefferson Lab. Both concepts rely on the Fixed-Field Alternating gradient (FFA) arc optics designs where multiple beam passes are transported by a single beam line. Some of the main challenges of the optics design are in synchronization and orbital and linear optics match of the individual passes with the linac straight. To minimize the complexity of the matching sections and make them more practical, it is preferable to complete as much of the orbital and optical match as possible within a single beam line using the FFA approach. The adiabatic matching technique proposed earlier is one such solution, but it requires a large number of cells. We present a much shorter matching section design based on another approach. A compact dog-leg-type section of several bending dipoles and quadrupoles is used to suppress the orbital offset and dispersion coming out of a periodic cell. Additional quadrupoles are used in the section to keep the beta functions under control and simplify their subsequent match to the linac. Initial beam tracking results are presented.

Benesch, J.↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

DESIGNING THE SPREADERS AND SPLITTERS FOR THE FFA@CEBAF ENERGY UPGRADE

The FFA@CEBAF energy upgrade study aims to approximately double the final energy of the electron beam at the Continuous Electron Beam Accelerator Facility (CEBAF). It will do this by replacing the highest-energy recirculating arcs with fixed-field alternating gradient (FFA) arcs, allowing for several more passes to circulate through the machine. This upgrade necessitates the re-design of the vertical spreader sections, which separates each pass into different recirculation arcs. Additionally, the FFA arcs will need horizontal splitter lines to correct for time of flight and R56. This work will present the current state of the spreader re-design and splitter design.

Benesch, J.↗

Large-Aperture High-Field NB3SN Magnets for the 2nd EIC Interaction Region*

The design concept of the Electron Ion Collider (EIC), which is under construction at BNL, considers adding a 2nd Interaction Region (IR) and detector to the machine after completion of the present EIC project. Recent progress with development and fabrication of large-aperture high-field magnets based on the Nb3Sn technology for the HL-LHC makes this technology interesting for the 2nd EIC IR. This paper summarizes the results of feasibility studies of large-aperture high-field Nb3Sn dipoles and quadrupoles for the 2nd EIC IR.

43 PARTICLE ACCELERATORS↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

Status of Error Correction Studies in Support of FFA@CEBAF

In this work, we examine the beam correction requirements for the FFA@CEBAF energy upgrade. Both hardware and software diagnostic and corrector components are under investigation; in particular the relationship between hardware and software optimization will be developed. To generate a representative sample of errors---from the machine lattice and other beam properties---we construct a Markov Chain Monte Carlo (MCMC) sampler which considers different probability distributions for different types of errors. This sample is used to investigate the statistical sensitivity of the beam to various diagnostic and corrective schema. Once statistics are acquired, we plan to use a variety of optimization techniques to minimize correction time for the electron beam in the FFA arcs designed for the CEBAF upgrade.

Benesch, J.↗