Seletskiy, S.

Publications and source records attributed to Seletskiy, S..

54 records · Page 3

NSLS-II commissioning and operation

The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

43 PARTICLE ACCELERATORS↗

Development and commissioning of an x-ray beam alignment flag for NSLS-II

The NSLS-II Synchrotron Light Source is a 3 GeV electron storage ring recently commissioned and is now entering operations at Brookhaven National Laboratory. One of the major tasks was to commission the six project beamline front ends which required a diagnostic to resolve x-ray beam position for the purpose of beam alignment at low current. Since none of the front ends were outfitted with any x-ray diagnostics in the baseline design, an x-ray beam profile monitor or “flag” that could be easily installed into existing front end vacuum chambers was proposed to satisfy this requirement. Here we present the development of this novel device which utilizes a polycrystalline CVD diamond luminescent screen to produce a visible image of the x-ray beam cross-section and is then captured with a CCD camera.

43 PARTICLE ACCELERATORS↗

Can YAG screen accept LEReC bunch train?

LEReC RF diagnostic beamline is supposed to accept 250 us long pulse trains of 1.6 MeV – 2.6 MeV (kinetic energy) electrons. This beamline is equipped with YAG profile monitor. Since we are interested in observing only the last macro bunch in the train, one of the possibilities is to install a fast kicker and a dedicated dump upstream of the YAG screen (and related diagnostics equipment). This approach is expensive and challenging from engineering point of view. Another possibility is to send the whole pulse train to the YAG screen and to use a fast gated camera (such as Imperex B0610 with trigger jitter under 60ns) to observe the image from the last pulse only. In this paper we study the feasibility of the last approach.

43 PARTICLE ACCELERATORS↗

How to measure energy of LEReC electron beam with magnetic spectrometer

For successful cooling the energies of RHIC ion beam and LEReC electron beam must be matched with 10 -4 accuracy. While the energy of ions will be known with required accuracy, e-beam energy can have as large initial offset as 5%. The final setting of e-beam energy will be performed by observing either Schottky spectrum or recombination signal from debunched ions co-traveling with the e-beam. Yet, to start observing such signals one has to set absolute energy of electron beam with accuracy better than 10 -2 , preferably better than 5∙10 -3 . The aim of this exercise is to determine whether and how such accuracy can be reached by utilizing LEReC 180° bend as a spectrometer.

43 PARTICLE ACCELERATORS↗

Physical design of magnetic shielding for LEReC cooling section

The goal of this note is to set basic parameters for the magnetic shielding of LEReC CS with required design attenuation. We considered physical design of magnetic shielding of LEReC cooling section. The schematic of this design along with the list of its basic parameters is shown. We are planning to use 2 layers of 1 mm thick cylindrical mu-metal shields with μ=11000. The radius of the first layer sitting on top of vacuum chamber is 63.5 mm. The second layer radius is 150 mm. Such shielding guarantees adequate transverse angles of electron beam trajectory in the CS.

43 PARTICLE ACCELERATORS↗

Considerations for NSLS-II Synchrotron Radiation Protection When Operating Damping Wigglers at Low Machine Energy

The NSLS-II storage ring vacuum chamber, including frontends (FE) and beamlines (BL), is protected from possible damage from synchrotron radiation (SR) emitted from insertion devices (IDs) by a dedicated active interlock system (AIS). The system monitors electron beam position and angle and triggers a beam dump if the beam orbit is outside of the active interlock envelope (AIE). The AIE was calculated under the assumptions of 3 GeV beam energy and ID gaps set to their minimum operating values (i.e. “fully closed”). Recently it was proposed to perform machine studies that would ramp the stored beam energy significantly below the nominal operational value of 3 GeV. These studies may potentially include the use of NSLS-II damping wigglers (DWs) for electron beam emittance reduction and control.

43 PARTICLE ACCELERATORS↗

Defining the safe current limit for opening ID photon shutter

The NSLS-II storage ring is protected from possible damage from insertion devices (IDs) synchrotron radiation by a dedicated active interlock system (AIS). It monitors electron beam position and angle and triggers beam drop if beam orbit exceeds the boundaries of pre-calculated active interlock envelope (AIE). The beamlines (BL) and beamline frontends (FE) are designed under assumption that the electron beam is interlocked within the AIE. For historic reasons the AIS engages the ID active interlock (AI-ID) at any non-zero beam current whenever the ID photon shutter (IDPS) is getting opened. Such arrangement creates major inconveniences for BLs commissioning. Apparently there is some IDPS safe current limit (SCL) under which the IDPS can be opened without interlocking the e-beam. The goal of this paper is to find such limit.

43 PARTICLE ACCELERATORS↗

Reviewed approach to defining the Active Interlock Envelope for Front End ray tracing

To protect the NSLS-II Storage Ring (SR) components from damage from synchrotron radiation produced by insertion devices (IDs) the Active Interlock (AI) keeps electron beam within some safe envelope (a.k.a Active Interlock Envelope or AIE) in the transverse phase space. The beamline Front Ends (FEs) are designed under assumption that above certain beam current (typically 2 mA) the ID synchrotron radiation (IDSR) fan is produced by the interlocked e-beam. These assumptions also define how the ray tracing for FE is done. To simplify the FE ray tracing for typical uncanted ID it was decided to provide the Mechanical Engineering group with a single set of numbers (x,x’,y,y’) for the AIE at the center of the long (or short) ID straight section. Such unified approach to the design of the beamline Front Ends will accelerate the design process and save valuable human resources. In this paper we describe our new approach to defining the AI envelope and provide the resulting numbers required for design of the typical Front End.

43 PARTICLE ACCELERATORS↗

NSLS-II injector commissioning and initial operation

The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

43 PARTICLE ACCELERATORS↗

Safe operating conditions for NSLS-II Storage Ring Frontends commissioning

The NSLS-II Storage Ring Frontends are designed to safely accept the synchrotron radiation fan produced by respective insertion device when the electron beam orbit through the ID is locked inside the predefined Active Interlock Envelope. The Active Interlock is getting enabled at a particular beam current known as AI safe current limit. Below such current the beam orbit can be anywhere within the limits of the SR beam acceptance. During the FE commissioning the beam orbit is getting intentionally disturbed in the particular ID. In this paper we explore safe operating conditions for the Frontends commissioning.

43 PARTICLE ACCELERATORS↗

Settings of the NSLS-II BSR magnets for energy interlock

It was determined that for the commissioning purposes energy range of the beam reaching the NSLS-II storage ring (SR) is allowed to be 2 GeV - 3.15 GeV. The Booster to SR (BSR) bends B1 and B2 interlocked at their nominal 3 GeV settings with ± 5% window provide the required “energy filter”. Another scenario of Booster operation suggests extracting the beam from the Booster to the BSR phase 1 line (or dump line). Under these circumstances the bend B2 is turned off. An adequate shielding is planned in BSR phase one line for B1 set within the boundaries of its 2 GeV nominal setting minus 5% and its 3 GeV setting plus 5 %. The goal of this exercise is to find the proper settings of respective bends PS currents, which will realize described interlock.

43 PARTICLE ACCELERATORS↗

Energy interlock in the Booster to Storage Ring transfer line

Under normal operational conditions in NSLS-II the energy of the beam extracted from the Booster and transferred to and injected into the Storage Ring (SR) is 3 GeV. It was determined that for the commissioning purposes energy range of the beam reaching the SR is allowed to be 2 GeV - 3.15 GeV. While the upper limit of the beam energy is defined by the maximum possible settings of Booster dipoles at the top of the ramp, the lower energy limit has to be provided by magnet interlocks. Dynamic interlocks of the Booster dipoles would be an ideal solution, yet the constraints of time and resources do not allow providing such interlocks for commissioning stage of NSLS-II. Therefore, the static interlock of magnets in the Booster to SR transfer line (BSR) shall be used to build a required “energy filter”. The goal of this exercise is to find a feasible solution for the BSR energy interlock that will be used at commissioning stage of NSLS-II accelerator.

43 PARTICLE ACCELERATORS↗

Effect of energy interlock on possible beam losses in the Booster to Storage Ring transfer line

Under normal operational conditions in NSLS-II the energy of the beam extracted from the Booster and transferred to and injected into the Storage Ring (SR) is 3 GeV. It was determined that for the commissioning purposes energy range of the beam reaching the SR is allowed to be 2 GeV - 3.15 GeV. While the upper limit of the beam energy is defined by the maximum possible settings of Booster dipoles at the top of the ramp, the lower energy limit has to be provided by magnet interlocks. Dynamic interlocks of the Booster dipoles would be an ideal solution, yet the constraints of time and resources do not allow providing such interlocks for commissioning stage of NSLS-II. Therefore, the static interlock of two bends in the Booster to SR transfer line (BSR) will be used - the bends B1 and B2 will be interlocked within 5% of their nominal values. The possible energy of the beam reaching each BSR magnet strongly depends on the details of interlock scheme. Thus, the possible beam losses in the BSR transfer line have to be calculated taking into account the particular energy interlock. The purpose of this exercise is to determine the potential beam loss locations, for further identification of the radiation risks they impose outside the existing bulk shielding, and specification of the supplemental shielding design necessary to mitigate those risks. We will present the beam systems description along with their planned operating ranges, which forms the basis of our analysis. Next, we will find the range of beam energy that can possibly be experienced by each BSR magnet. Finally, we will describe the method used to determine potential beam loss locations and we will present the results of our studies in a form of convenient to use table which includes all the information necessary for analysis of radiation risks induced by the determined beam losses. In the following analysis we assume, unless the opposite is indicated in the clearest possible terms, that the accelerator is configured in any feasible way that its design allows.

43 PARTICLE ACCELERATORS↗

Analysis of localized beam losses in the Booster extraction straight section and the Booster to Storage Ring Transfer Line

The NSLS-II accelerators are installed within radiation shielding walls that are designed to attenuate the radiation generated from an assumed beam loss power (current multiplied by the assumed energy) within the beam channel to a level of <0.5mrem/h at the outer surface of the bulk shield walls of the accelerator. This Bulk Shielding Power assumes that the beam current is intercepted by a thick target (i.e., 30 cm of copper or steel) along the Booster or transport line beam axis and the dose rate level is calculated transverse to the beam axis. Any operational losses greater than this BSP level are expected to be addressed by installing supplemental shielding near that loss point in order to attenuate this radiation level outside the shield wall to the design level of <0.5mrem/hr.

43 PARTICLE ACCELERATORS↗

New Baseline Design of the ILC RTML System

The new ILC baseline was proposed in 2009 (Strawman baseline - SB2009) to minimize cost of the machine and accommodate many changes made in the design of the accelerator systems. The biggest changes are made in the central area, where BDS, RTM L, DR, electron and positron sources are sharing the tunnels. A new layout of the compact DR and re-location of the electron and positron sources to the main tunnel requires a new lattice design for all beamlines in this area. The lattice design was coord inated between accelerator systems and Convention Facility and Siting (CFS) group to eliminate conflicts between beamlines and satisfy construction requirements. In this paper we present a new design of the RTML electron and positron lattices in the centr al area and other modifications made in the RTML line to accommodate changes to the beamline layouts.

43 PARTICLE ACCELERATORS↗