Engineering Papers⌕ Search

Engineering topics

Schoepfer, R.

Publications and source records attributed to Schoepfer, R..

Progress of the laser ion source upgrade (LION2) for RHIC and NSRL program at Brookhaven National Laboratory

At Brookhaven National Laboratory (BNL), the LION2 ion source is being constructed to replace an existing laser ion ablation ion source (LIS) at the EBIS facility, which provides heavy ion beams of multiple ion species for the operation of NASA Space Radiation Laboratory (NSRL) and Relativistic Heavy Ion Collider (RHIC). The LION1 ion source currently provides singly charged ions of Li, B, C, O, Al, Si, Ca, Ti, Fe, Cu, Zr, Nb, Ag, Tb, Ta, W, Au, Bi, and Th with a rapid-species-change capability. An electron beam ion source, Extended-EBIS captures, confines, and ionizes the ions to high charge state, suitable for injection and acceleration by an RFQ accelerator. Typically, single pulses of the LIS ion species for NSRL are changed sequentially during Galactic Cosmic Ray experiments, while multiple pulses of a given ion beam are provided quasi-simultaneously for RHIC. LION2 will have the same capability of the rapid-species-change with improved beam performance and reliability. LION2 is being constructed in a remote assembly location and is expected to finish in December 2023. The removal of LION1 and installation of LION2 is planned during the December 2023 or summer 2024 shutdown.

43 PARTICLE ACCELERATORS↗

Development of highly efficient NEG pumping system for EBIS

Ultrahigh vacuum inside the ion trap volume is crucial for stable and reliable operation of an Electron Beam Ion Source (EBIS). We have developed and tested a compact linear pumping system based on the ZAO Non-Evaporable Getter (NEG) module with high pumping speed and enhanced sorption capacity for all active gases. Due to its minimal transverse dimensions, the system can be mounted adjacent to the ion trap inside a superconducting solenoid bore and will provide a pumping speed of the order of 1000 l/s for all active gases in that area. An externally supplied current (100 A DC) is used to heat the ZAO NEG up to 650 °C for more than 1 h, which is required for pump activation and/or reactivation cycles. The pumping system is being developed for use in the Extended EBIS Upgrade which is presently in progress at BNL. In conclusion, the design of the system and results of multiple tests are presented and discussed.

43 PARTICLE ACCELERATORS↗